Loading...
HomeMy WebLinkAboutFile Documents.1485 Homestake Dr.0045-2020-BCHO (3) 2015 IECC RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM CITY OF ASPEN VERSION 11.3 UPDATED DECEMBER 1.3, 2017 PROJECT ADDRESS: 1485 HOMESTAKE 0045-2020-BCHO Parcel ID#: 273502403002 Permit Number: U09 r101"9 B CONTACT INFORMATION : Owner: Name: Azouz Revocable Trust City: Studio City Address: 1485 homestake State: Ca Email: Azouzd@istlondon.net Zip Code: 91604 Phone: 310-906-7379 Cell Phone: Owner's Representative: Name: tmc builders City: GWS Address: po box 2630 State: CO Email: tmc@sopris.net Zip Code: 81601 Phone: 970-618-2230 Cell Phone: 970-618-2230 A. RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM Sheets showing snowmelt, pool, spa, and solar/GSHP information: Do you have snowmelt or a spa that has been exempted by the buiding official? 0 Yes(enter sqft below on the exempt row) ® No Hydro Snowmelt Electric Snowmelt Pool Spa Existing To be Demoed Existing to Remain 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft New(non-exempt) 90.00 sqft New(exempt) Total New 90.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft Total on site 90.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft Total Snowmelt on site 90.00 sqft Boiler Efficiency 85.0% 100% 75.0% 75.0% Mitigation Payment $3,600.00 $ - $ - Total Payment for Mitigation: $ 3,600.00 B. ON-SITE RENEWABLE CREDITS Supplemental System REMP Credit Use PV Worksheet Photovoltaic System $Use Thermal Worksheet Hot Water Panels $Use GSHP Cert Ground Source Heat Pump $ - Other Approved System $ - Total Mitigation Credits: $ - Onsite Renewable Offsets: How many Kilo Watts of PV(solar electric)would I need? 0.52 or How many square feet of SHW(solar hot water)would I need? 16.02 R-REMP Payment: $ 3,600.00 Amount Previously Paid on This Permit: I TOTAL R-REMP PAYMENT: $ 3,600.00 Refund(includes minus$750): $C. PREPARED BY: Date: 7/1/2020 Print Name: _ Ty McSwain Signature: Ty McSwain _RE C E IVE D Phone&EMail: 970-618-2230 tmc@sopris.net REVIEWED: Justin Hahn o;�,,, :nv Date: 8/25/2020 0 7/15/2 0 2 C ASPEN BUILDING DEPARTMENT 07/15/2020 ASPEN BUILDING DEPARTMENT