HomeMy WebLinkAboutFile Documents.1020 E Durant Ave.0053.2019 (2).ARBK Environmental Sc Disaster Restoration, Inc .
ECOS Environmental—Glenwood Springs
6690 Hwy 82
Glenwood Springs, CO 81601
Office— (970) 945-4407
info@ecosenvironmental.com
www.ecosenvironmental.com
ASBESTOS INSPECTION REPORT
CLIENT: Larry Winerman
ADDRESS: 1020 E. Durant Unit 203
Aspen CO, 81611
EMAIL: larwin@comcast.net
PHONE: 970-618-0008
Ecos JOB NUMBER G-19-0056-AT
PROJECT LOCATION: 1020 E. Durant Unit 203
Aspen CO, 81611
DATE OF INSPECTION: 2/5/2019
RECEIVED
03/14/2019
ASPEN
BUILDING DEPARTMENT
ecos
Environmental Disaster Restoration,Inc.
SUMMARY
ECOS Environmental&Disaster Restoration(ECOS) was retained to conduct a limited asbestos
inspection at the above location in reference to determining if there is asbestos containing material
(ACM),in building materials to be disturbed during interior remodel. Interior remodeling of a closet to
extend bathroom and extending closet for stackable dryer room. The inspection was performed in
accordance with the Standards of Practice of the Colorado Regulation 8 Part B in effect at the time of
this Inspection. This inspection is not intended to be technically exhaustive. The inspection included all
accessible building materials,however,should any additional building materials be discovered during
demolition,those materials must be sampled and analyzed prior to continuing with the work. Three (3)
samples were collected of all suspect materials, as listed in the Lab Data Table located on Page 9 of this
report.
The Inspector has prepared this written asbestos Inspection Report for the sole use and benefit of the
client. The asbestos inspection report shall identify,report, and make recommendations for future
evaluation. Client agrees to read the entire asbestos inspection report when received and shall
promptly call the inspector with questions or concerns regarding the report. The use of this report and
information contained herein by others,in whole or in part, is not authorized without the written
mutual consent of the client and ECOS Environmental.
INSPECTOR QUALIFICATIONS
This inspection was performed by Brian Guzman, Colorado State Department of Public Health and
Environment Certification Number 21876.
SAMPLE ANALYSIS PROCEDURE
ECOS collected bulk samples of the homogenous materials in a random and representative manner,as
determined by the Inspector. A minimum of one composite core samples that included all layers within
the suspect material was obtained from each homogenous area. Samples of soft friable materials were
obtained by removing a small portion using wetting techniques. The sampler cleaned equipment
following collection of each sample to minimize cross-contamination between samples. The sampler
assumed that materials in inaccessible locations were similar to those in accessible locations,in order to
limit destruction during the sampling process. All samples were placed in sealed,labeled containers,
and the sample descriptions and locations were recorded.Samples were delivered under a chain of
custody for analysis to Aerobiology Laboratory in Denver, CO. Samples were analyzed by Polarized
Light Microscopy.
Performance of this asbestos inspection is intended to reduce,but not eliminate,uncertainty regarding
the presence of ACBM in connection with the above referenced property. No guarantee is expressed or
implied that all ACBM was identified in the inspection. Therefore,ECOS Environmental cannot be
held accountable for restrictions placed on us by the client,conditions or information that remained
unknown, or areas that were inaccessible at the time of the inspection.
RECEIVED
03/14J2019
ASPEN
BUILDING DEPARTMENT
ecos
Environmental Disaster Restoration,Inc.
TRANSMITTAL OF BUILDING
One (1) copy of the results of the building/structure asbestos survey shall be immediately transmitted
by the building/structure owner as follows:
• One copy of the completed asbestos survey shall be sent by the owner or their agent to the local
government entity charged with issuing a permit for such demolition,renovation,remodeling
or repair work under applicable State or local laws.
• The completed asbestos survey shall be kept on the construction site with the asbestos
notification and variance,if required,throughout the duration of the asbestos project and any
associated demolition,renovation,remodeling or repair project.
BUILDING/STRUCTURE ASBESTOS SURVEY INFORMATION
The asbestos survey shall, at a minimum,identify and assess with due diligence,the locations,
quantities,friability and conditions of all building material types at the affected portion of the
building/structure.The certified asbestos inspector is responsible for identification and assessment of
all type within the affected portion of the building/structure.
All building materials visually assessed shall be assumed to be asbestos containing building material
(ACBM),unless bulk sampling is conducted as per standard EPA and OSHA accepted methodologies.
The subsequent analysis is performed by a laboratory that meets the requirements and the analyses
satisfies both CO STATE ELAP and federal requirements,including multi-layered sample analyses,to
document non-asbestos containing material.
The building/structure asbestos survey shall also include the building/structure name, address,the
building/structure owner's name and address,the name and address of the owner's agent,the name of
the firm performing the asbestos survey and a copy of the firm's current asbestos handling license,the
names of the certified inspector(s) performing the survey and a copy of the current asbestos handling
certificate for each inspector utilized,the dates of the asbestos survey,a listing of homogeneous areas
identifying which ones are ACBM, all laboratory analysis reports for bulk samples collected,and copies
of the appropriate certifications for the laboratory used for analysis of samples taken during the
asbestos survey.
REMOVAL REQUIREMENT
If the building/structure asbestos survey finds that the portion of the building/structure to be
demolished,renovated,remodeled,or have repair work contains asbestos containing building material
(ACBM),which is impacted by the work,the owner or the owner's agent shall conduct,or cause to
have conducted,asbestos removal performed by a licensed asbestos abatement contractor in
conformance with all standards set forth.
All ACBM impacted by the demolition,renovation,remodeling or repair project shall be removed,
prior to access or disturbance by other uncertified trades or personnel. No demolition,reno r,vE D
remodeling or repair work shall be commenced by any owner or the owner's agent prior to ..�
03/142019
ASPEN
BUILDING DEPARTMENT
ecos
Environmental&Disaster Restoration,Inc.
completion of the asbestos abatement in accordance with the notification requirements. For multi-
phased work,the access restriction for uncertified trades or personnel applies to each intermediate
portion of the entire project. Upon completion of the intermediate portion of the asbestos project, other
trades,or personnel may access that portion of the work site. For demolition projects that are exempt
from asbestos survey requirements due to being structurally unsound,the demolition is considered an
asbestos project.
All building/structure owners and asbestos abatement contractors on a demolition,renovation,
remodeling, or repair project shall inform all trades on the work site about the ACBM at the work site.
UNIDENTIFIED AND UNASSESSED ASBESTOS
When any construction activity, such as demolition,remodeling,renovation or repair work,reveals
suspect ACBM that has not been identified by the asbestos survey, or has not been identified by other
inspections as per current OSHA or EPA requirements, all activities shall cease in the area where the
suspect ACBM is found. Unassessed suspect miscellaneous ACBM shall be treated and handled as
ACBM and assumed to be ACBM,unless proven otherwise by standard EPA and OSHA accepted
methods. To document non-asbestos containing material, analysis must be performed by a laboratory
that meets the requirements of the DOH;and the analysis satisfies both CO STATE ELAP and federal
requirements.
ASBESTOS PROJECTS
An asbestos project is any work that involves the removal,encapsulation,enclosure,repair or
disturbance of friable or non-friable asbestos, or any handling of asbestos material that may result in
the release of asbestos fibers.For the purpose of compliance an asbestos project shall include any
disturbance of asbestos fibers,and the planning,asbestos survey, design,background air sampling,
inspection,air sampling and oversight of abatement work,cleanup, and the handling of all asbestos
material subject to abatement,as well as the supervising of such activities. An asbestos project starts
with Phase I when the planning, asbestos survey,and design work begins or is required to begin. The
project shall not be considered completed until Phase II D is complete. (See Table 1 below).
Phase I Phase II
(Prior to Asbestos Start-> Abatement-> End
Abatement Contractor)
A B A B C D
Regulated Asbestos Final
Asbestos abatement handling
survey, Background work area(s) including gross cleaning Final waste
planning, air sampling preparation removal or and removal
and design and enclosure abatement,initial clearance from site
construction cleans, and waste air samples
Start->Asbestos Project->Final Clearance
RECEIVED
03/14,2019
ASPEN
BUILDING DEPARTMENT
ecos
Environmental Disaster Restoration,Inc.
ASBESTOS RESULTS FLOW CHART
Asbestos Test
I
- Non Detect < 1% >1%
I
No Action I OSHA Reg. 8 dditional Reg. 8
Required I Requirements Requirements Requirements
>3,000 SF
NO Permit Permit Project Design
Required
ECOS provides I P
Project Manager
clearance (NOT Clearance Testing Oversight
required) II'
Manifested
Disposal at
Approved Landfill
ASBESTOS PROJECT SIZE
Large asbestos project: An asbestos project involving the removal, disturbance, enclosure,
encapsulation,repair or handling of 160 square feet or more of ACBM,or 260 linear feet or more of
ACBM.
Small asbestos project: An asbestos project involving the removal,encapsulation, enclosure,repair,
disturbance or any handling of more than 10 and less than 160 square feet of ACBM or more than 25
and less than 260 linear feet of ACBM.
Minor asbestos project: An asbestos project involving the removal, disturbance,repair,encapsulation,
enclosure or handling of 10 square feet or less of ACBM or 25 linear feet or less of ACBM.
REC WED
03/14h019
ASPEN
BUILDING DEPARTMENT
ecos
Environmental Disaster Restoration,Inc.
Homogenous areas sampling requirement: SF= Square Footage. LF=Linear Footage
HOMOGENOUS MATERIAL TYPE QUANTITIES MINIMUM#OF SAMPLES
0 TO<1,000 SF 3
SURFACING MATERIAL
1,000 TO 5,000 SF 5
>5,000 SF 7
THERMAL SYSTEM INSULATION EACH MATERIAL 3
PATCH<6 SF,LF 1
MISCELLANEOUS MATERIALS EACH MATERIAL 2
ASBESTOS REMOVAL CATEGORIES
Category I Non-Friable ACBM:NESHAP classification -Asbestos-containing packings, gaskets,
resilient floor covering, and asphalt roofing products,containing more than one percent (1%) asbestos,
that when dry,cannot be crumbled,pulverized, or reduced to powder by hand pressure.
Category II Non-Friable ACBM:NESHAP classification-Any material,excluding Category I Non-
Friable ACM,containing more than one percent (1%) asbestos that,when dry,cannot be crumbled,
pulverized, or reduced to powder by hand pressure.
Class I Asbestos Work: OSHA term meaning activities involving the abatement of Thermal Systems
Insulation(TSI) and surfacing ACBM and PACM.
Class II Asbestos Work: OSHA term meaning activities involving the abatement of ACBM which is not
TSI or surfacing material. This includes,but is not limited to,the removal of asbestos-containing
wallboard,floor tile and sheeting,roofing and siding shingles,and construction mastics.
Class III Asbestos Work: OSHA term meaning Repair and Maintenance operations,where no more
than a minor quantity of ACM,including TSI and surfacing ACBM and PACM,is likely to be
disturbed.
Class IV Asbestos Work: OSHA term meaning Maintenance and Custodial Activities during which
employees contact but do not disturb ACBM or PACM and activities to clean up non-ACBM dust,
waste and debris resulting from Class I, II and III activities.
RECEIVED
03/1492019
ASPEN
BUILDING DEPARTMENT
ecos
Environmental Disaster Restoration,Inc.
DEFINITIONS
Abatement:Procedures to control fiber release from asbestos material. This includes removal,
encapsulation, enclosure,repair, and disturbance of friable asbestos or any handling of asbestos
material that may result in the release of asbestos fibers.
Amosite:An Asbestiform mineral of the amphibole group containing approximately
50% silicon and 40% Iron(II) Oxide,and is made up of straight brittle fibers,light gray to pale brown in
color.
Amphibole:One of the two major groups of minerals from which the Asbestiform minerals are
derived, distinguished by their chain-like crystal structure and chemical composition.
Asbestos:A generic name given to a number of naturally occurring hydrated mineral silicates that
possess a unique crystalline structure,are incombustible in air, and are separable into fibers. Asbestos
includes the asbesti-form varieties of chrysotile (serpentine);crocidolite
(riebeckite);amosite (cummington-grunerite);anthophyllite;and actinolite.
Asbestos Project:Work undertaken by a contractor which at any time involves any aspect of the
removal, encapsulation,enclosure or disturbance of friable asbestos, or any handling of asbestos
material that may result in the release of asbestos fiber,except work in an owner-occupied single-
family dwelling performed by the owner of such dwelling. An asbestos project shall include the
planning, design,monitoring,inspection,and air sampling of abatement work, as well as the
supervising of such activities.
Building Owner:The person in whom legal title to the premises is vested unless the premises are held
in land trust,in which instance building owner means the person in whom beneficial title is vested.
Electron Microscopy:A method of asbestos sample analysis which utilizes an electron beam to
differentiate between fibers.
Emergency:An unexpected,unanticipated or unforeseen occurrence,including but not limited to,a
steam,chemical, gas or water line rupture,a boiler failure, or a building collapse,which poses (a) an
imminent danger to the health and safety of the public,the response to which will constitute an
asbestos project; or (b) an asbestos-related risk to the health and safety of the public from exposure to
asbestos fibers.
Friable Asbestos:Any materials that contain asbestos and can be crumbled,pulverized, or reduced to
powder by hand pressure.
HEPA Filter Vacuum Equipment:Vacuuming equipment with a high efficiency particulate air
filtration system. This filter is capable of trapping and retaining 99.97 percent of asbestos fibers greater
than 0.3 microns equivalent aerodynamic diameter.
Homogenous:Evenly mixed and similar in appearance and texture throughout.
NESHAP: National Emission Standard for Hazardous Air Pollutants OSHA:Occupational Safety and Health Administration RECEIVED
03/14/2019
ASPEN
BUILDING DEPARTMENT
ecos
Environmental&Disaster Restoration,Inc.
Operations and Management Plan (OMP): Specific procedures and practices developed for the
interim control of asbestos-containing materials in buildings until it is removed.
Polarized Light Microscopy (PLM):An optical microscopic technique used to distinguish between
different types of asbestos fibers by their shape and unique optical properties.
Repair: Corrective action using required work practices to control fiber release from damaged asbestos
material.
TSI: Thermal Systems Insulation
ACBM: Asbestos containing building material
Surfacing Material -material that is sprayed on, troweled on, or otherwise applied to
surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural
members, or other materials on surfaces for acoustical, fireproofing, or other purposes.
Thermal System Insulation - material applied to pipes, fittings,boilers, breeching, tanks,
ducts, or other interior structural components to prevent heat loss or gain, or water
condensation, or for other purposes.
Miscellaneous Materials - interior building material on structural components, structural
members or fixtures, such as floor and ceiling tiles, and does not include surfacing material or
thermal system insulation.
RECEIVED
03/1492019
ASPEN
BUILDING DEPARTMENT
ecos
Environmental Disaster Restoration,Inc.
HOMOGENOUS AREAS SAMPLED DURING INSPECTION
LOCATION U Po w w_ia U'
Material < l cr.)w
cn Q o w U OO
Al Compound,tape, North end bedroom South facing wall y 2 Y G L 1 250
joint compound,
drywall
A2 Tape,micaceous Master bathroom South facing wall N 0 Y G L 1
joint compound,
drywall,
compound,
compound
A3 Compound, South end bedroom closet South East corner N 0 Y G L 1
drywall wall
KEY:
CONDITION
G= No VISIBLE DAMAGE
D= VISIBLE DAMAGE<10%OVER ENTIRE MATERIAL OR 25% LOCALIZED
SD=VISIBLE DAMAGE>10%OVER ENTIRE MATERIAL OR 25%LOCALIZED
FRIABLE CATEGORY
F=FRIABLE MATERIAL;MATERIALS THAT CAN CRUMBLE OR BE REDUCED TO POWDER BY HAND PRESSURE
RECEIVED
03/14/2019
ASPEN
BUILDING DEPARTMENT
ecos
Environmental&Disaster Restoration,Inc.
NFI=CATEGORY I NON-FRIABLE MATERIAL;MATERIALS THAT CANNOT BE CRUMBLED OR REDUCED TO
POWDER BY HAND PRESSURE THAT DO NOT INCLUDE CATEGORY I NON-FRIABLE MATERIALS.
POTENTIAL FOR DISTURBANCE
L= Low POTENTIAL FOR DAMAGE
D= POTENTIAL FOR DAMAGE
SD=POTENTIAL FOR SIGNIFICANT DAMAGE
INVENTORY
a LOCATION/FUNCTIONAL SPACES INCLUDED IN DESCRIPTION
HOMOGENOUS AREA
A NORTH END BEDROOM CLOSETS,AND NORTH END CLOSET HAND TROWEL
AND BATHROOM TEXTURE
CONCLUSION
Visual inspection was completed of building materials to be disturbed during interior remodeling of
the master bathroom and closets. Three (3) samples were collected and sent to Aerobiology
Laboratories in Golden,CO,for analysis using Polarized Light Microscopy (PLM). Samples A2 and A3
came back non-detect for asbestos.
Sample Al was found to contain trace amount of chrysotile in the white compound and 2%
chrysotile in the joint compound. These materials are made friable during removal and must
be handled in accordance with Colorado State Regulation 8, OSHA, and the EPA. If these
materials are to be disturbed they must be removed by a certified abatement contractor to
protect the health of the property owner, the public, and the workers.
RECEIVED
03/142019
ASPEN
BUILDING DEPARTMENT
ecos
Environmental Disaster Restoration,Inc.
LAB RESULTS
��_'' AERobioIogy� �AbORATORy ,PIJ SO
Street
1 ASSOCIATES,`` cow,Co.
INCORPORATED 1,uu
anaal
Expertise Since 1997 "7,7
' "'fi
Certificate of Analysis rvnw ea'"t'�wm/1111
Cheat Name ECOS Environmental ' �,�I 'a' Date Collected 02 D5'19
Street address 6690 HWY 82 :AC.�L� Date Received. 02+0619
City,State ZIP Glenwood Springs,CO 81601 TESTING •1 Date Analyzed 02'13'19
Attu Brian Oman NVLAP Lab t ode momon Date Reported 02'1319
Chest Project Name: G-19-0056-AT'1020 E.Durant Project a 19001490
Ten Requested. 3002,Asbestos is Bulk Samples
Method. EPA 600 R-93 116.Method for the Determination of Asbestos in Bulk Boilainf Minerals
Sampleldentlacation ta.,a. Lave Non-Asbestos Non-Fibrous Matra
Physical Description of Sample Layer e.....e. Aibes:os Detected Asbestos Percentage Fiber Material Material
ChemLab Sample Number iYNt Petceataee Per:eata_e Percentaze Composition
19004690-1A Rye Compound with Multicolored Pout .f 71O CHRY Trace 100 CAI
Layers
:9004690-1B Cream Tape N 5o.a ND 98
A:
19004690-1C White Joint Compound N 15a1 CHRY 2 98 C,1
19004690-ID White Tar.Drywall N -0°o ND 25 75 G
19004690-2A Cream Tape N 5% ND 98 2
19004690-2B White Micaceo.ts:oint Compound N 10% ND 100 G,M
A2 19004690-2C White.'TanDrvwall N 10% ND 80 20 G
19004690-2D White Compound with White Paint N 20% ND 100 C
19004690-2E White and Tan Compounds with White Paint N 55% ND 100 C,M
A3 19004690-3A White Compound with Multicolored Paint N 12% ND 100 C,M
Lasers
AC.,krali. Alt-A_- •Het a.Buda O-Quartz
ATA.Awns.. t7.CAI* C.Cabana.T.Tar
; ' .0 9 �} AN=AaaLap4ara PG=Plow. V G]att O=Mato= =l'amraLta
l.t.� � �WY1a,� (J'--C�IM, MIT.mrvataa WK.sc..rwealG.Cro�
J Gt-haridolie. OT-tkbar Af-\Gra
1 alena UNIT Theca OhaQ Tn=Mauro]. SYN-3 Olt-Owlet
i}3t Asbestos Lab vat Trsa.<to TLW w ae.OP.*Laboratory Aa $1SPHl ND•Vpeo brneM W. Wiaaramr. ➢.Pod,
Page t at]
RECEIVED
03/1412019
ASPEN
BUILDING DEPARTMENT
ecos
Environmental Disaster Restoration,Inc.
AERobiolocy� LAbORATORy
W ASSOC [S, INCORPORATED
Expertise Since 1997 Certificate of Atulsm y..,r,
Client Name ECOS Eartroomeotai Date Collected 12 C=19
,yIIlI...`„if+
Street address 6690 HWY 52 �l �,r � Date Received C-CO 19
City,Sate ZIP Glemsood Spcner,CO 01601 TESTING Date Aazhvzd C.22 13 19
Attu Brian Crumzn NV LAP Lab l oak:II lia0.tl Date Reported C2 13 19
Client Project Name: G-19-0036-AT'1020 E.Dvaet Pro;ecr IC I90C'69C
Test Regcee:ed, 3002,Asbestos in Bulk Samples
Method. EPA 600 R-93.116.Method for the Determination of Asbestos in Bulk Btild=Materials
.. ?:oe:4sbestos Non-':b:ou Mara
Sample Identdcation Layer
Physical Description of Sample Layer . .,�,. Asbestos Detected Asbestos Percentage Rber Mineral Material
Then Lab Sample Number sl,s.`, „re
Percentage Percernge Composition
:9COi69C-:B Matt Compound with\Iuhicolored Paint N 12% ND :OC C-G,\I
Layers
a_ -
:9C04690-SC White Tan Dnzrall N 76% ND 20 SO G
AC.Acucar. AH-A>dm.l Ha. a-Bind. O.Qmta
� AM.A...... CT.Gs.. C-hYro.r T.Tr
JQC^�It /J -liv LAO /� -:A , AA=Auetbai CO=rc =teo. =vm cJLL.
Camla M r..MaaY Waal a.Gamma
CR-Cn.ieoFO. OT-Om.. se Mies
1 a.eaa U.lt'el 7aiena VIMTA=T..aaobt. ITN=Iyolbeon OS=Qa+mc
Laboratory Analyst Asbmlos Lab Supervisor ND-Nagle
Te-Tale p-PAltre
Slit hU-VenelMette6 R--WWbneni.e P-PMrce
Pap 7 at t
RECEIVED
03/1412J2019
ASPEN
BUILDING DEPARTMENT
ecos
Environmental Disaster Restoration,Inc.
AEROUIOIOC�Y� LAbORATORy TaaSanwrSityyl
ASSOCIATES, Golden._ INCORPORATED Sate Itw
.co.etstol
Fxperlise Since 1997 03.232.37en
Certificate of Anabuis rma'aamiamom.a u
Client Name ECOS En oamental Date Collected 02 05 19
Street address 6690 HUT 82 W•-:I,;•�i 17� Date Received. 02'0619
City.State ill Glenwood Spring,CO 81601 ns l ING Date Aeahzed. 02 13 19
Atm Brian Guzman V V.AP 1L61;t 1.1 J1084110 Date Reported 021319
Client Project Name: G19-0056AT 2020 E.Durant Project ID. 19004690
Test Requested 3002,Asbestos in Bulk Samples
Method: EPA 680 R-93 116.Method for the Determmanon of Asbestos in Bulk Buildmr Morena!
General Notes
•ND indicates no asbestos was detected:the method detection limit is 1%.
•Trace or"c 1'indicates asbestos was identified in the ample,but the concentration is less than 1%and cannot be quantified without point counting.
•Samples identified as inhomoeeneous(more than one layer)are separated into individual lavers,and each layer is analyzed and reported separately.
•All regulated asbestos minerals(i.e.chrsotile,amosite,crocidolite,anthophvllite,tremolite.and actinolite)were tourist in every layer of each sample,but only those asbestos minerals detected are
listed.Amosite is the common name for the asbestiform variety of the minerals cumminetonite and grunerite. Crocidolite is the common name used for the asbestiform variety of the mineral
riebeckite.
•Tile,vinyl,foam,plastic,and fine powder samples may contain asbestos fibers of such small diameter(<0.25 microns in diameter)that these fibers cannot be detected by PL\L For such samples.
more sensitive analytical methods(e.g.TE'MI,SEM,and XRD)are recommended if Beater certainty about asbestos content is required. Semi-quantitative bulk TE\I floor tile analysis is accepted
under NESHAP regulations.
•These results are submitted pursuant to Aerobioloev Laboratory Associates,Inc.'s current terms and conditions of sale,including the company's standard warrant-and limitation of liability
provisions.No responsibility or liability is assumed for the manner in which the results are used or interpreted.
•Unless notified in noting to return the samples covered by this report,Aerobiology Laboratory Associates.Inc.will store the sampler for a minimum period of thirty(30)days before discarding. A
shipping and handling charge will be assessed for the return of any samples.
•Aerobioloey does not guarantee the results of tape lifts,miaovacs,wipe,and'or debris samples. Accurate analysis cannot be performed due to particle size.media used,and or amount of material
given. Analysis of these materials should be preformed by a TE\I.A resnfr of ND does nor indicate char the sample area doer not contain asbestos. It means the anoint could not&watt•
asbestos in the specific sample for the reasons Bared abosn
Notes Required by VCLAP
•This report must not be used by the client to claim product certification,approval,or endorsement by\-VLAP.\-IST,or any agency of the Federal Government.
•This test report relates only to the items tested or calibrated.
•This report is not valid unless at bears the name of a N'VLAP-approved siemton-.
•Any reproduction of this document must include the entire document an order for the report to be valid.
Paso 3 al
RECEIVED
03/1412019
ASPEN
BUILDING DEPARTMENT
ecos
Environmental t Disaster Restoration,Inc.
CERTIFICATIONS
471) 1
•
Goof f)apubment
of Public Health
and Environment
ASBESTOS CONSULTING FIRM
I This certifies that
I
Ecos o enm Environmental and Disaster Restoration,lncl
Registration No.:ACE-14400
has met the registration requirements of 25.7.507,C.R.S.and the Air Quality Control
* Commission Regulation No.8,Pan B.and is hereby authorized to perform asbestos consulting
iyt activities as required under Regulation No 8,Part 6,In the state of Colorado.
Issued: September 09,2018
Expires: September 09,2019 t.�,/L1L 7 1 i(1-L2L
- nwmma,wco ipp.wnrA.
s Y
,4 f �.r r" ''' _*e w r> ,,s,
yT ` Y
s'ilf,.
1eda. .,. Colorado Department
of Public Health .,
and Environment
ASBESTOS
CERTIFICATION*r This certifies that 1-4.
Ay .„..
( �^- Brian Guzman .
y
Certifieathm No.:21876 _.,.<,-,--,.,
/> has mel the rcquircments of 25-7-507,C.R.S.and Air Quality Control
-
+ Commission Regulation No.8,Part B.and is hereby certified by the .1 .
state of Colorado in the following discipline:
( ...:J'¢.. Building Inspector" „�
/ Issued: February 11,2018
`([`/`y Expires: February Id,2019
' 7:4
a.✓.a-rrn P+^^^.. .asaaeaomar..rr. ..
:'.
1 W,,t
',, ,^ ,a. .."°-.. <," 3 , :F ,.!",:. N... 1
RECEIVED
03/14/2019
ASPEN
BUILDING DEPARTMENT
ecos
Environmental Disaster Restoration,Inc.
PHOTOS
_ misinivapars Iimmeginimmmillnirs..- - ow - ''-'111!* - -
siimillinnillogi„„....1111111Isms. unum li&. 41111111ENir"
algraillillis91111w g' ..W. 1614..... mmor-Int
_ 1111111.1 jrnmant -tieleiW - IF , ...um sim
____ _anew , ethwtimi Wit
IP -' __ ,.. 7 NM• ,.,N
_
•-•4 . if -,:t - me -.1.----4111-46#
-.1110._
_
-----
• I it
-4•,,__
.... .1 ,,,,, .,, i • -.:Li: _
111.1V-10 --414.. 1,''
•
/f
1...
1111417
..... ,or
. eitil ,
„ \
- •••••••14,4112. , ev, 1 1
'-"41.
n"Ptitil A I \
....
t
_-..•."'''"---.:::: n
No- - ____..----- ..I••••.
_,....rm.
v..
_.,.......
mil
111 _
....‘
_
_ ,_'SIMI _ - •
esimellIIIMINsi III
— mil INN .tri4Writ••
drimarlinill •11116.111110 willasZ, - -._
011/0111 , ,14 ...,. ii, --tirma•-• _ PI _ a_v_ ,
-, isitalliis I " _OlIrr.• ...- .67"712- .-.
_31-_ -*;rrilier_.,.:-
— 444
--- ••• I 414
iaAtel
i
_ , ,Al
upw- -•-
14- -•---i '
—1.- 1-
L . 1_., 'VP ---' MEIMI
RECEIVED
03/1412019
ASPEN
BUILDING DEPARTMENT
ecos
Environmental ❑isaster Restoration,Inc.
a� it. _ IIII
11
r _ _
• Mal or. Il i
. ,11F ill . I ' I
li ' '
IlkissL.9 III [ linlill
RECEIVED
03/14192019
ASPEN
BUILDING DEPARTMENT
ecos
Environmental Disaster Restoration,Inc.
FINAL NOTES
This report represents the opinion of the reporting asbestos inspector at the time of the asbestos
assessment survey. If you have any further questions, or if additional information is needed please do
not hesitate to call.
Sincerely,
Brian Guzman
Colorado State EPA Asbestos Inspector#21876
ECOS Environmental&Disaster Restoration,Inc.
(970)945-4407
RECEIVED
03/141/2019
ASPEN
BUILDING DEPARTMENT