HomeMy WebLinkAboutFile Documents.67 Boomerang Rd.0034.2019 (6).ACBK ASPEN RE-ROOFING APPLICATION CHECKLIST
2015 IBC/IRC
For Building and Permit Information,please refer to our website at:
THE CITY O ASPEN http://www•aspenpitkin.com/depts/41/main building.cfm
NOTE: Tt is is a general list of reuuired information.More information may be required as each project is individually evaluated. If the proposed
structure rc quires City Land Use Review,all final approvals must be obtained PRIOR to submission of a building permit application. Contact a city
planner at 970/920-5090 to determine if a Land Use Review is needed.
JOB ADDRESS ,a i •r ra A e12 1 e/o PARCEL I.D.NUMBER,1 q:,c I I"c.I, O 0 7-
E
OWNER cr . Sit, Co. �uc, 16tl L L C DATE: L(/3 1
J I
All reroo�g projects require a roofing permit*
*Roof work involving changes to height,slope,footprint,structural framing,or cavity insulation requires a Building Permit
*Patching less than 1 square(10'x10')does not require a permit.
Ple a submit the following:
Permit Application form completely filled out with accompanying V Contact Sheet
HOA Certification form signed by the owner of the property
❑ YES,IX NO-Is the site listed on the"Inventory of Historic Sites and Structures"or in the Historic District?
I_yes,HPC Approval required. Contact the Historic Preservation Officer at 429-2758
O, Site nan(2 copies)showing the roof and including the following(may be hand drawn):
Extent of proposed work
El,Impervious Areas Show and label all hardscape vs. landscaping
Ey Downspout&Gutter locations draw and label each one and show if they drain to hardscape or landscaping
u Snowguards/stops required on all roofs that shed onto neighboring properties or potentially occupied areas such as a
alkway, stairway, alley,deck,pedestrian and vehicular exit from buildings or areas where there is potential for
rsonal injury or property damage and areas directly above or in front of gas utility or electric utility meters.
(I rdinance 40,2016)
4 Phot I graphs(2 copies),one clearly showing the structure involved and one showing a close-up of the existing roof
pc Con ruction Management Plan(CMP)(2 copies)which includes a Right-of-Way permit required for work in the public
'OW and an Encroachment License required for occupancy of a public ROW.
Ak Asbe.tos Checklist(1 copy)regarding material removed.
I you answered YES to the Asbestos Checklist,answer these questions:
• YES/0 NO-Are all the roofing materials to be removed asphaltic,tar impregnated and non-friable(will not crumble by hand
pressure when dry)?
• YES/0 NO-Will you be removing the roofing materials by hand(no circular saws)?
• YES/0 NO-Will you dispose asphaltic roof shingles and NOT recycle them?
I i you answer YES to all of the above,an asbestos test will not be required.
14 Asse bly:
►' Proposed Roof assembly drawing label each component, including product and manufacturer name and existing
t. remain components and number of layers. Show flashing and ice barrier.
• 'of Class:
• Provide a listed roof assembly specific to your roofing product and installation(provide the UL or ESR report)
IX Class A(minimum required for all roofs per Ordinance 40,2016)
• xisting roofing and number of layers: Dnc (a'yr a 'e atiiriatei 'aa c- es'
❑YES/ NO-Is the roof vented?
❑YES NO-Are you removing,replacing, or adding roof deck insulation (including tapered)?
If YES,de.cribe:
❑ •tter of Structural Integrity(1 copy)required if adding insulation due to potential increase in snow load.
❑ YES/►' NO—Are you replacing damaged roof deck?Approximate square feet: If YES,the roof must
comply wi h the energy code which may require insulation.
Additiona requirements from Ordiannce 40,2016:
Ice barrie consisting of either self-adhering polymer modified bitumen sheet or two layers of underlayment cemented together required to
e tend from the roof eave edge at least 6 feet inside the exterior wall line as measured along the roof surface, 18 inches from the
c-i terline of the valley and 24 inches on the vertical wall at a roof and wall juncture.
Ventilatio openings,including ridge vents,must protect against rain and snow.Individual vents may not exceed 144 .0 vED
b. covered with noncombustible corrosion-resistant mesh or screen with openings no smaller than 1/16"and n 1 ger(han 4'.
Wood sha es and shingles require a minimum'/"vented airspace separating the shingles from the roofing underlaymentWUb/2 019
si ctural sheathing.