Loading...
HomeMy WebLinkAboutFile Documents.108 Midland Ave.0264.2017 (2).ARBK eos PHOTOS Environmental (ti Disaster Restoration,Inc. 108 Midland Avenue Al: Basement bedroom 1 A2: Basement laund r A3: Basement closet A4: Main floor bedroom 4 A5: Main floor livin room { rh GWS Office: (970)945-4407• Aspen Office: (970) 925-3267 RECEIVED 6690 Hwy 82,Glenwood Springs,CO 81601. 401 Aspen Airport Business Center,Aspen,CQVyib 2 017 Email:info@ecosenvironmental.com• www.ecosenvironmental.com 1 ASPEN BUILDING DEPARTMENT eos Environmental tv Disaster Restoration,Inc. A6: Main floor mechanical A7: 2nd floor livin• room A8: 2nd floor laundr ,, J Fiiiiiiiii- _. . _ . 11.1110 A9: 2nd floor bedroom B1: Exterior stucco Cl: 2nd floor brick mortar0 ,oil, GWS Office: (970)945-4407• Aspen Office: (970) 925-3267 RECEIVED 6690 Hwy 82,Glenwood Springs,CO 81601. 401 Aspen Airport Business Center,Aspen,CO 81611,16/2 017 Email:info@ecosenvironmental.com• www.ecosenvironmental.com ASPEN BUILDING DEPARTMENT ecos FINAL NOTES Environmental tv Disaster Restoration,Inc. This report represents the opinion of the reporting asbestos inspector at the time of the asbestos assessment survey. If you have any further questions, or if additional information is needed please do not hesitate to call. Sincerely, Brian Guzman Colorado State EPA Asbestos Inspector #21876 ECOS Environmental & Disaster Restoration, Inc. (970) 945-4407 GWS Office: (970)945-4407■ Aspen Office: (970) 925-3267 RECEIVED 6690 Hwy 82,Glenwood Springs,CO 81601. 401 Aspen Airport Business Center,Aspen,CO 81611 Email:info@ecosenvironmental.com■ www.ecosenvironmental.com 10/16/2017 ASPEN BUILDING DEPARTMENT Environmental & Disaster Restoration , Inc . ECOS Environmental - Glenwood Springs 6690 Hwy 82 Glenwood Springs, CO 81601 Office - (970) 945-4407 info@ecosenvironmental.com www.ecosenvironmental.com ASBESTOS INSPECTION REPORT CLIENT: Schlumberger Construction ADDRESS: 314 C AABC CITY/STATE: Aspen, CO 81611 EMAIL: sb@schlumbergerconstruction.com PHONE: 970-948-6543 PROJECT LOCATION: 108 Midland Avenue Aspen, CO 81611 DATE OF INSPECTION: June 27, 2017 GWS Office: (970)945-4407■ Aspen Office: (970) 925-3267 RECEIVED 6690 Hwy 82,Glenwood Springs,CO 81601. 401 Aspen Airport Business Center,Aspen,CO 81611 Email:info@ecosenvironmental.com■ www.ecosenvironmental.com 10/16/2 017 ASPEN BUILDING DEPARTMENT ecos SUMMARY Environmental tv Disaster Restoration,Inc. ECOS Environmental & Disaster Restoration (ECOS) was retained to conduct an asbestos inspection at the above location to determine if asbestos is present prior to demolition of the residence. The inspection included all accessible building materials however, should additional building materials be discovered during the demolition, those materials must be sampled and analyzed prior to continuing with the work. Eleven samples were collected of all suspect materials identified throughout the residence, as listed in the Lab Data table located on page 8 of this report. INSPECTOR QUALIFICATIONS This inspection was performed by Brian Guzman, Colorado State Department of Public Health and Environment Certification Number 21876. SAMPLE ANALYSIS PROCEDURE Suspect material was sampled and delivered under a chain of custody for analysis to Aerobiology Laboratory in Golden, CO. Samples were analyzed by Polarized Light Microscopy. TRANSMITTAL OF BUILDING/STRUCTURE ASBESTOS SURVEY INFORMATION One (1) copy of the results of the building/structure asbestos survey shall be immediately transmitted by the building/structure owner as follows: • One copy of the completed asbestos survey shall be sent by the owner or their agent to the local government entity charged with issuing a permit for such demolition, renovation, remodeling or repair work under applicable State or local laws. • The completed asbestos survey shall be kept on the construction site with the asbestos notification and variance, if required, throughout the duration of the asbestos project and any associated demolition, renovation, remodeling or repair project. The asbestos survey shall, at a minimum, identify and assess with due diligence, the locations, quantities, friability and conditions of all building material types at the affected portion of the building/structure. The certified asbestos inspector is responsible for identification and assessment of all type within the affected portion of the building/structure. All building materials visually assessed shall be assumed to be asbestos containing material (ACM), unless bulk sampling is conducted as per standard EPA and OSHA accepE�E IVE GWS Office: (970)945-4407• Aspen Office: (970) 925-3267 R '� 1/ 6690 Hwy 82,Glenwood Springs,CO 81601. 401 Aspen Airport Business Center,Aspen,Cq�1j�16/2 017 Email:info@ecosenvironmental.com• www.ecosenvironmental.com , 11 ASPEN BUILDING DEPARTMENT eos Environmental Ilisaster Restoration,Inc. methodologies. The subsequent analysis is performed by a laboratory that meets the requirements and the analyses satisfies both CO STATE ELAP and federal requirements, including multi-layered sample analyses, to document non-asbestos containing material. The building/structure asbestos survey shall also include the building/structure name, address, the building/structure owner's name and address, the name and address of the owner's agent, the name of the firm performing the asbestos survey and a copy of the firm s current asbestos handling license, the names of the certified inspector(s) performing the survey and a copy of the current asbestos handling certificate for each inspector utilized, the dates of the asbestos survey, a listing of homogeneous areas identifying which ones are ACM, all laboratory analysis reports for bulk samples collected, and copies of the appropriate certifications for the laboratory used for analysis of samples taken during the asbestos survey. REMOVAL REQUIREMENT If the building/structure asbestos survey finds that the portion of the building/structure to be demolished, renovated, remodeled, or have repair work contains asbestos containing material (ACM), which is impacted by the work, the owner or the owner's agent shall conduct, or cause to have conducted, asbestos removal performed by a licensed asbestos abatement contractor in conformance with all standards set forth. All ACM impacted by the demolition, renovation, remodeling or repair project shall be removed, prior to access or disturbance by other uncertified trades or personnel. No demolition, renovation, remodeling or repair work shall be commenced by any owner or the owner's agent prior to the completion of the asbestos abatement in accordance with the notification requirements. For multi-phased work, the access restriction for uncertified trades or personnel applies to each intermediate portion of the entire project. Upon completion of the intermediate portion of the asbestos project, other trades, or personnel may access that portion of the work site. For demolition projects that are exempt from asbestos survey requirements due to being structurally unsound, the demolition is considered an asbestos project. All building/structure owners and asbestos abatement contractors on a demolition, renovation, remodeling, or repair project shall inform all trades on the work site about the ACM at the work site. UNIDENTIFIED AND UNASSESSED ASBESTOS When any construction activity, such as demolition, remodeling,renovation or repair work, reveals suspect ACM that has not been identified by the asbestos survey, or has not been identified by other inspections as per current OSHA or EPA requirements, all activities shall cease in the area where the suspect ACM is found. Unassessed suspect miscellaneous GWS Office: (970)945-4407• Aspen Office: (970) 925-3267 RECEIVED 6690 Hwy 82,Glenwood Springs,CO 81601. 401 Aspen Airport Business Center,Aspen,CO 816 1 Email:info@ecosenvironmental.com• www.ecosenvironmental.com 10,16/2 017 ASPEN BUILDING DEPARTMENT eos Environmental Disaster Restoration,Inc. ACM shall be treated and handled as ACM and assumed to be ACM, unless proven otherwise by standard EPA and OSHA accepted methods. To document non-asbestos containing material, analysis must be performed by a laboratory that meets the requirements of the DOH; and the analysis satisfies both CO STATE ELAP and federal requirements. ASBESTOS PROJECTS An asbestos project is any work that involves the removal, encapsulation, enclosure, repair or disturbance of friable or non-friable asbestos, or any handling of asbestos material that may result in the release of asbestos fibers. For the purpose of compliance an asbestos project shall include any disturbance of asbestos fibers, and the planning, asbestos survey, design, background air sampling, inspection, air sampling and oversight of abatement work, cleanup, and the handling of all asbestos material subject to abatement, as well as the supervising of such activities. An asbestos project starts with Phase I when the planning, asbestos survey, and design work begins or is required to begin. The project shall not be considered completed until Phase II D is complete. (See Table 1 below). Phase I Phase II (Prior to Asbestos Start-> Abatement -> End Abatement Contractor) A B A B C D Regulated Asbestos Final Asbestos abatement handling cleaning Final survey, Background work area(s) including gross and waste air removal or planning, sampling preparation abatement, clearance removal and design and enclosure initial cleans, air from site construction and waste samples Start -> Asbestos Project->Final Clearance GWS Office: (970)945-4407• Aspen Office: (970) 925-3267 RECEIVED 6690 Hwy 82,Glenwood Springs,CO 81601. 401 Aspen Airport Business Center,Aspen,CO 81 dlj/16/2 017 Email:info@ecosenvironmental.com• www.ecosenvironmental.com ASPEN BUILDING DEPARTMENT ecos ASBESTOS RESULTS FLOW CHART Environmental tv Disaster Restoration,Inc. Asbestos Test - Non Detect < 1% >1% iINo Action I OSHA Reg. 8 dditional Reg. 8 Required I Requirements I Requirements Requirements >3,000 SF II I' 11 NO Permit Permit Required Project Design ECOS provides I ' clearance (NOT Clearance Testing Project Manager required) Oversight Manifested Disposal at pproved Landfill ASBESTOS PROJECT SIZE Large asbestos project: An asbestos project involving the removal, disturbance, enclosure, encapsulation, repair or handling of 160 square feet or more of ACM, or 260 linear feet or more of ACM. Small asbestos project: An asbestos project involving the removal, encapsulation, enclosure, repair, disturbance or any handling of more than 10 and less than 160 square feet of ACM or more than 25 and less than 260 linear feet of ACM. Minor asbestos project: An asbestos project involving the removal, disturbance, repair, encapsulation, enclosure or handling of 10 square feet or less of ACM or 25 linear feet or less of ACM. GWS Office: (970)945-4407• Aspen Office: (970) 925-3267 RECEIVED 6690 Hwy 82,Glenwood Springs,CO 81601. 401 Aspen Airport Business Center,Aspen,CO 81611 Email:info@ecosenvironmental.com• www.ecosenvironmental.com 10/16/2 017 ASPEN BUILDING DEPARTMENT ecos ASBESTOS REMOVAL CATEGORIES Environmental k Disaster Restoration,Inc. Category I Non-Friable ACM: NESHAP classification -Asbestos-containing packings, gaskets, resilient floor covering, and asphalt roofing products, containing more than one percent (1%) asbestos, that when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. Category II Non-Friable ACM: NESHAP classification -Any material, excluding Category I Non-Friable ACM, containing more than one percent (1%) asbestos that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. Class I Asbestos Work: OSHA term meaning activities involving the abatement of Thermal Systems Insulation (TSI), and surfacing ACM and PACM. Class II Asbestos Work: OSHA term meaning activities involving the abatement of ACM which is not TSI or surfacing material. This includes, but is not limited to, the removal of asbestos-containing wallboard, floor tile and sheeting, roofing and siding shingles, and construction mastics. Class III Asbestos Work: OSHA term meaning Repair and Maintenance operations,where no more than a minor quantity of ACM, including TSI and surfacing ACM and PACM, is likely to be disturbed. Class IV Asbestos Work: OSHA term meaning Maintenance and Custodial Activities during which employees contact but do not disturb ACM or PACM and activities to clean up non- ACM dust,waste and debris resulting from Class I, II and III activities. DEFINITIONS Abatement: Procedures to control fiber release from asbestos material. This includes removal, encapsulation, enclosure, repair, and disturbance of friable asbestos or any handling of asbestos material that may result in the release of asbestos fibers. Amosite: An Asbestiform mineral of the amphibole group containing approximately 50% silicon and 40% Iron (II) Oxide, and is made up of straight brittle fibers, light gray to pale brown in color. Amphibole: One of the two major groups of minerals from which the Asbestiform minerals are derived, distinguished by their chain-like crystal structure and chemical composition. Asbestos: A generic name given to a number of naturally occurring hydrated mineral silicates that possess a unique crystalline structure, are incombustible in air, and are separable into fibers. Asbestos includes the asbesti-form varieties of chrysotile (serpentine); crocidolite (riebeckite); amosite (cummington-grunerite); anthophyllite; and actinolite. GWS Office: (970)945-4407• Aspen Office: (970) 925-3267 RECEIVED 6690 Hwy 82,Glenwood Springs,CO 81601. 401 Aspen Airport Business Center,Aspen,CO 81611 Email:info@ecosenvironmental.com• www.ecosenvironmental.com 10/16/2 017 ASPEN BUILDING DEPARTMENT eos Environmental Disaster Restoration,Inc. Asbestos Project: Work undertaken by a contractor which at any time involves any aspect of the removal, encapsulation, enclosure or disturbance of friable asbestos, or any handling of asbestos material that may result in the release of asbestos fiber, except work in an owner- occupied single family dwelling performed by the owner of such dwelling. An asbestos project shall include the planning, design, monitoring, inspection, and air sampling of abatement work, as well as the supervising of such activities. Building Owner: The person in whom legal title to the premises is vested unless the premises are held in land trust, in which instance building owner means the person in whom beneficial title is vested. Electron Microscopy: A method of asbestos sample analysis which utilizes an electron beam to differentiate between fibers. Emergency: An unexpected, unanticipated or unforeseen occurrence, including but not limited to, a steam, chemical, gas or water line rupture, a boiler failure, or a building collapse, which poses (a) an imminent danger to the health and safety of the public, the response to which will constitute an asbestos project; or (b) an asbestos-related risk to the health and safety of the public from exposure to asbestos fibers. Friable Asbestos: Any materials that contain more than 1% asbestos and can be crumbled, pulverized, or reduced to powder by hand pressure. HEPA Filter Vacuum Equipment: Vacuuming equipment with a high efficiency particulate air filtration system. This filter is capable of trapping and retaining 99.97 percent of asbestos fibers greater than 0.3 microns equivalent aerodynamic diameter. Homogenous: Evenly mixed and similar in appearance and texture throughout. NESHAP: National Emission Standard for Hazardous Air Pollutants OSHA: Occupational Safety and Health Administration Operations and Management Plan (OMP): Specific procedures and practices developed for the interim control of asbestos-containing materials in buildings until it is removed. Polarized Light Microscopy (PLM): An optical microscopic technique used to distinguish between different types of asbestos fibers by their shape and unique optical properties. Repair: Corrective action using required work practices to control fiber release from damaged asbestos material. TSI: Thermal Systems Insulation RECEIVED GWS Office: (970)945-4407■ Aspen Office: (970) 925-3267 6690 Hwy 82,Glenwood Springs,CO 81601. 401 Aspen Airport Business Center,Aspen,CC1411 6/2 017 Email:info@ecosenvironmental.com■ www.ecosenvironmental.com ASPEN BUILDING DEPARTMENT ecos LAB DATA Environmental tv Disaster Restoration,Inc. Non Sample Suspect Material Detect Detect Percentage Friability Condition Al Compound, X 0% Yes Good texture Compound, A2 texture, tape, X 0% Yes Good drywall Compound, A3 texture, tape, X 0% Yes Good drywall Compound, A4 texture, tape, X 0% Yes Good drywall Compound, A5 texture, tape, X 0% Yes Good drywall Compound, A6 texture, tape, X 0% Yes Good drywall Compound, A7 texture, mesh, X 0% Yes Good tape, drywall A8 Drywall, texture X 0% • Yes Good Compound, A9 texture, mesh, X 0% Yes Good drywall B1 Plaster X 0% I Yes Good Cl Mortar,brick X 0% Yes Good INVENTORY Homogenous Material Description A: Textured drywall Orange peel textured drywall throughout residence B: Plaster Stucco on back side of residence C: Mortar Red brick and mortar from second floor of home exterior GWS Office: (970)945-4407• Aspen Office: (970) 925-3267 RECEIVED 6690 Hwy 82,Glenwood Springs,CO 81601. 401 Aspen Airport Business Center,Aspen,C i U�1j6/2 017 Email:info@ecosenvironmental.com• www.ecosenvironmental.com ASPEN BUILDING DEPARTMENT eos Environmental tv Disaster Restoration,Inc. CONCLUSIONS: Visual inspection was completed of all suspect building materials in preparation of a full demo of the residence. Orange peel texture is on all drywall throughout the residence. Nine samples were taken of this homogenous material and labeled "A". Additional samples included stucco, brick and mortar from exterior finishes. Eleven samples were collected and sent to Aerobiology Laboratories in Golden, CO for analysis using Polarized Light Microscopy (PLM). All samples were non-detect for asbestos. RECEIVED 10/16/2017 ASPEN BUILDING DEPARTMENT GWS Office: (970)945-4407■ Aspen Office: (970) 925-3267 6690 Hwy 82,Glenwood Springs,CO 81601. 401 Aspen Airport Business Center,Aspen,CO 81611 Email:info@ecosenvironmental.com■ www.ecosenvironmental.com ecos CERTIFICATIONS Environmental k Disaster Restoration,Inc. 4 i , ® 1 j f:.•t n r aJ t k' r. 1 f fir' - - ,Colorado Department •. = of Public Health and Environment :•.-= - ASBESTOS CERTIFICATION* This certifies that , .�; Brian Guzman .` C Certification No.:21876 __,, ,. t' has met the requirements of25-7-507,C.It.S.and.Air Quality Control ) Commission Regulation No.8.Part B,and is hereby certified by the ...>" 4 state of Colorado in the following discipline: �, C. 1* Building Inspector* 1 . Issued: .lanuarl 26. 2017 .v7 Expires: .lauueri.26, 2018 -•The.r - 1 ,.. A-' mA,nn l,.nla,Ye.r.Ib.«rp,..v.v.n.of„ � -ti'-. ra. p�mraf Mn.h•n-ipwnrlJ'..J..Iserxn...nr�«Wu. /' . '� ~:1.' fi F :t t C;,..i4s,-:af[ fs.r-.. ,4- .�1 ,.fi --i,A. r ;,-.,:.,--:.:A:t i, 4 .F 'i • - si- r CI pF C ,sc Ne «14 �ff{ i r 7 Colorado Department l► ��>, of Public Health •• and Environment ASBESTOS CONSULTING FIRM This certifies that ,, Li ' Ecos Environmental and Disaster Restoration,Incl is • Re 1istration No.:ACF-14480 ` has met the registration requirements of 25-7-507,C.R.S.and the Air Quality Control Commission Regulation No.8,Part B.and is hereby authorized to perform asbestos consulting •1 activities as required under Regulation No 8, Part B, in the state of Colorado. Issued: September 09,2016 P Expires: September 09,2017 awhorimd rwco 18e6.....,utrve SEAL