Loading...
HomeMy WebLinkAboutFile Documents.108 Midland Ave.0264.2017 (7).ARBK CITY OF ASPEN WATER UTILITY DEVELOPMENT REVIEW FEE ECU CALCULATION WORKSHEET FOR REMODEL DATE: 10/16/2017 PERMIT# 02 69.2017.ARBK NAME: ACCT.# ADDRESS: 108 MIDLAND AVE NUMBER OF TOTAL PROPOSED NUMBER OF EXISTING FIXTURES NUMBER NUMBER OF ECU COUNT ECU EXISTING ECU TO BE OF NEW WATER FOR FIXTURE RATE FIXTURES* COUNT REMOVED FIXTURES FIXTURES REMODEL (A) (B) (C) (D) BEDROOM 0.10 0 5 5 0.5 tub/shwr,toilet,lay=1st Bath 0.36 0 1 1 0.36 tub/shwr,toilet,lay=2nd Bath 0.24 0 1 1 0.24 TOILETS/URINALS/BIDETS 0.05 0 8 8 0.4 LAV 0.02 0 12 12 0.24 TUB/SHOWER 0.05 0 0 0 0 TUB ONLY 0.05 0 1 1 0.05 TUB OVERSIZED 0.02 0 0 0 0 WHIRLPOOL UPGRADE 0.05 0 0 0 0 SHOWER STALL 0.05 0 5 5 0.25 STEAM ROOM/SHOWER 0.08 0 0 0 0 STEAM SHOWER UPGRADE 0.03 0 1 1 0.03 KITCHEN 0.25 0 1 1 0.25 DISHWASHER 0.10 0 4 4 0.4 DISPOSAL 0.05 0 1 1 0.05 ADD KITCHEN SINK/POT FILLER 0.05 0 1 1 0.05 KITCHEN/EFF. 0.15 0 0 0 0 BAR/HAND SINK 0.05 0 2 2 0.1 ICE MACHINE 0.05 0 1 1 0.05 WASHER 0.10 0 1 1 0.1 LNDRY/UTIL.SINK/DOG WASH 0.05 0 1 1 0.05 1st HOSE BIB 0.20 0 1 1 0.2 2nd HOSE BIB 0.10 0 1 1 0.1 ADD HOSE BIB 0.05 0 3 3 0.15 HOT TUB/@100 GAL 0.02 0 1 1 0.02 ADD LANDSCAPE/100 SQ FT 0.01 0 115 115 1.15 POOL/1000 GAL/YEAR ROUND 0.02 0 0 0 0 TOTAL ECU COUNT 0 4.74 INCREASE IN ECU COUNT DUE TO REMODEL 4.74 TOTAL DEVELOPMENT REVIEW FEE ��$5,,6�601.73 *Note: If the number of existing fixtures that you provide in column A differs from the number in the Utilities Department's records,the Departme I re(is2EjVE D numbers during its review of your permit. As a result these fees may change. 10/16/2017 ASPEN BUILDING DEPARTMENT