Loading...
HomeMy WebLinkAboutFile Documents.311 Park Ave.0178.2019.ARBK 0178 2019-07-02_311 Park Ave_Change Order 1.pdf(15) Page:A-201 ELEVATIONS Checkmark: Unchecked 4' 7 5/8" �� Author:jimp FP Response:Window 209 is to replace ,� MI File Name: 2019-07-02_311 Park Ave_Change Order 1.pdf the existing window and opening size to CD 7 I�7u remain unchanged. In-field measurements J to verify opening size. Proposed window in J �i elevation now matches existing. REF: A-201 IMEI■■I RNEIrikh Page:A-201 ELEVATIONS 1'-4 3/4" Checkmark: Unchecked FP Response:Window 209 is to replace Author:jimp the existing window and opening size to File Name: 2019-07-02_311 Park Ave_Change Order 1.pdf remain unchanged. In-field measurements to verify opening size. Proposed window in elevation now matches existing. REF: zos I A-201 Page:A-201 ELEVATIONS Checkmark: Unchecked 15.48169 sf Author:jimp FP Response:Window 209 is to replace Name: g . the existing window and opening size to 15.4*3 sf File20190702-311 Park Ave_Change Order 1.pdf remain unchanged. In-field measurements to verify opening size. Proposed window in elevation now matches existing. REF: A-201 Page: Z-008 WALL DEMOLITION CALCULATIONS -- --,i ..,..— Checkmark: Unchecked Header? jj '--, Author:jimp FP Response: Demolition area for header File Name: 2019 07 02_311 Park Ave_Change Order 1.pdf has been added to wall 6. Demolition area Ilr increase of 13.25 SF. REF Z-008 6 1 1 I!TM .� . Page:Z-008 WALL DEMOLITION CALCULATIONS Header? '°' °�"""°° Checkmark: Unchecked Author:jimp FP Response: Demolition area for header File Name: 2019-07-02_311 Park Ave_Change Order 1 df ,- "' " °E°°^°°a�°s E g p has been added to wall 6. Demolition area -' Il " �� increase of 2.75 SF. REF Z-008 E€ A Page:Z-008 WALL DEMOLITION CALCULATIONS Checkmark: Unchecked The amount of demo for this wall should R°`r be increasing, not decreasing. Please Author:jimp iiiimm File Name: 2019-07-02_311 Park Ave Change Order 1.pdf revise. FP Response:Area for fenestration does not count towards demolition.This - o*�v�. ft wall was previously shown incorrectly and has been revised in the change `g r order set.See screen shot of highlighted area in green that counts towards - 2.75sgft ..._ demolition.The window of 12.25 SF is reduced for fenestration and was 112.00sgft therefore excluded from the overall area of demolition. Page:Z-008 WALL DEMOLITION CALCULATIONS Checkmark: Unchecked Based on my measurements, you had Author:jimp this section of wall being demolished wall correctly measured the first time. Please ®..,L &iJ .� File Name: 2019-07-02_311 Park Ave_Change Order 1.pdf go back to the demo you had before. ll — FP Response:Area for fenestration does not count towards demolition.This __ � wall was previously shown incorrectly and has been revised in the change RECEIVED 71 order set.See screen shot of highlighted area in green that counts towards _ ,:10 demolition.The window of 12.25 SF is reduced for fenestration and was sg s? therefore excluded from the overall area of demolition. - 2.75sgft 0 9/19/2 019 112.00 sq ft ASPEN BUILDING DEPARTMENT Page:Z-008 WALL DEMOLITION CALCULATIONS Checkmark: Unchecked Does this demo square footage include Author:jimp the new header? °°°s`h's°°m° P Response: Demolition area for header M laiQludethenew File Name: 2019-07-02 311 Park AveAve Change Order 1.pdf p he8de� has been added to wall 11. Demolition riMi777 area increase of 1.50 SF. REF Z-008 MO— ;a Page:Z-008 WALL DEMOLITION CALCULATIONS Checkmark: Unchecked Per the structurals, a very large new Author:jimp header is being added-please add that ,. I �_ File Name: 2019-07-02_311 Park Ave_Change Order 1.pdf to your demo calculations. `aia'aao°a. :"- FP Response: The structural drawings call out an . ® ro., existing header to remain. Reference plan set ,--1. ` from Evolve Structural labeled Struct Clarif. '�i i 04/03/19 1 I i. c 1_ I 5 Page:Z-008 WALL DEMOLITION CALCULATIONS Based on the dimensions in the Based on the dimensions in the Checkmark: Unchecked higher elevations,the hie Author:jimp elevations,the new window is higher up old window.Either correct the File Name: Park Ave_Change Order 1.pdf on the wall than the old window. Either elevations or add more deA 2019-07-02_311 _ FP Response: Window 209 is to replaced the existing window correct the elevations of add more demo. and opening size to remain unchanged. In-field measurements to verify opening size. Proposed window in elevation now matching existing. REF:A-201 o Page:Z-008 WALL DEMOLITION CALCULATIONS Checkmark: Unchecked Based on the elevations,this appear to ri. Author:jimp be a straight across top of these walls. If File Name: 2019-07-02_311 Park Ave_Change Order 1.pdf not, please let me know where in the A FP Response: The wall extends up plans this shows the larger wall square :: E ' past the facia. See screenshot. iralt footage. C ®� Li I I Page:Z-008 WALL DEMOLITION CALCULATIONS From the elevations, it appears that this A Checkmark: Unchecked middle is being demolished. Also, Based ePaearsa.iaa..aaa. Author:jimp on the structurals, a very large new �arrM1iemitltleia atlama M1atl File Name: 2019-07-02—311 Park Ave— Change Order 1.pdf header is being added please add that BaseU on rM1e sVuclurels.a ry M1eatler is ,ers.en FP Response: Window 206, 207, &208 are replacing the =tlama to your demo calculations. " „... existing windows and opening sizes are to remain unchanged.The existing header is to remain. Reference plan set from Evolve Structural labeled Struct Clarif. 04/03/19 Page: Z-008 WALL DEMOLITION CALCULATIONS i o:, Checkmark: Unchecked Header? , i pm .„ Author:jimp �...a 0�i/1:"" �r; ,�,d__ atla, File Name: 2019-07-02_311 Park Ave_Change Order 1.pdf cm =0 `' L FP Response: Demolition area for header �" -- 0. has been added to wall 6. Demolition area T. ,,0], F. increase of 4.25 SF. REF Z-008 Page:Z-008 WALL DEMOLITION CALCULATIONS 124.4775 sf =,,,,a„ Checkmark: Unchecked D"_s 1—i Author:jimp ,,.....„ ,.„., File Name: 2019-07-02_311 Park Ave_Change Order 1.pdf 1,auw.1 _ iiiig FP Response:Area for fenestration does not count towards demolition.This sq I wall was previously shown incorrectly and has been revised in the change ► ;�� order set.See screen shot of highlighted area in green that counts towards _ ..-���--- demolition.The window of 12.25 SF is reduced for fenestration and was 2 .75 sq ft therefore excluded from the overall area of demolition. C • E IVE D 112.0 CE' �,� 09 19/2019 ASPEN BUILDING DEPARTMENT II Page:Z-008 WALL DEMOLITION CALCULATIONS Checkmark: Unchecked Based on elevations, this window is Author:jimp getting taller. Revise your demo ,m 'I Ba=wdnaowl= File Name: 2019-07-02 311 Park Ave Change Order 1.pdf numbers, plus add in the new header. taller.Revise your — Ave_ Change numbers,plus nesow add in the new header__ FP Response: Demolition area on wall 8 was incorrectly shown as these three windows are the same height. See existing photo. Window 206, 207, &208 are replacing the existing windows and opening sizes are to remain unchanged.The existing header is to remain. „no _. ._,...... . r. . . I. Li — LL h• "' A i, I , LL LA._ 1...14.,h-7. ;L j.,, LL LL II ,,,, , 4 lb, , '.,\. 11\iil RECE WE D 09/19/2019 ASPEN BUILDING DEPARTMENT