HomeMy WebLinkAboutFile Documents.311 Park Ave.0319.2017 (9).ARBK 0319.2017.arbk CMP 1
7 (1)
Page: 7
Author: patrickh A contractor must be chosen before the CMP can
File Name: CMP.311 Park Ave.2017.12.pdf be approved. Please consult with contractor
before responding to these comments as he will
have to follow this CMP onsite.
FP Response: Koru LTD has been selected as
the contractor for the project. Their contact info
has replaced the TBD note on page 7.
8 (1)
tetlon EMERGENCY Page: 8 Please provide schedule as soon as you can
911
Please provide Author: patrickh estimate a start date.
N schedule as soon as
Y°°a"e=timatea
CTION start date. File Name: CMP.311 Park Ave.2017.12.pdf
FP Response:A preliminary construction
azofs
prior to the start of construction schedule has been provided by Koru LTD.
This schedule is based on an October 1st
start date.
9 (2)
Page: 9 There is no parking allowed on Park Ave near the
Author: patrickh
File Name: CMP.311 Park Ave.2017.12.pdf construction site. Provide a better description of
where off-site parking will be.
FP Response: Parking will occur in the driveway
and sub-contractors and employees will be
encouraged to carpool.
Page: 9
Author: patrickh There is no mention of mechanical soil stabilization
File Name: CMP.311 Park Ave.2017.12.pdf that would require a sound fence anywhere else in
the CMP. Does this project include soil
stabilization? If so, please provide more
information. If not, are you still planning on using
the fence described here?
FP Response:The project does not include any soil
stabilization.The project will be secured with a 6'
high,tennis screen clad,temporary fence with a
lockable gate.
10 (2)
Page: 10 There is no"Appendix B"with this CMP. Please
Author: patrickh
20""""°MP File Name: CMP.311 Park Ave.2017.12.pdf provide a site plan.
Please prpWtle a sib
FP Response:The site plan has been included.
ps a° 9 sp°s REF:A-003
Page: 10
"t"°°.�p,�°°°°°°�to°°, 1 e "°"° Author: patrickh No site plan provided.
File Name: CMP.311 Park Ave.2017.12.pdf
FP Response:The site plan has been included.
REF:A-003
12 (1)
Page: 12 The allowable noise limit at this site is 70 db during
,'"' ° Author: patrickh
mmg °° °° File Name: CMP.311 Park Ave.2017.12.pdf the summer on season (6/1-Labor Day)80 db all
°°°°EOM1i5 other times.
FP Response: 11.2 Noise Suppression plan note
has been corrected to 70 db during the summer on
season, 6/1-Labor Day.