Loading...
HomeMy WebLinkAboutFile Documents.311 Park Ave.0319.2017 (9).ARBK 0319.2017.arbk CMP 1 7 (1) Page: 7 Author: patrickh A contractor must be chosen before the CMP can File Name: CMP.311 Park Ave.2017.12.pdf be approved. Please consult with contractor before responding to these comments as he will have to follow this CMP onsite. FP Response: Koru LTD has been selected as the contractor for the project. Their contact info has replaced the TBD note on page 7. 8 (1) tetlon EMERGENCY Page: 8 Please provide schedule as soon as you can 911 Please provide Author: patrickh estimate a start date. N schedule as soon as Y°°a"e=timatea CTION start date. File Name: CMP.311 Park Ave.2017.12.pdf FP Response:A preliminary construction azofs prior to the start of construction schedule has been provided by Koru LTD. This schedule is based on an October 1st start date. 9 (2) Page: 9 There is no parking allowed on Park Ave near the Author: patrickh File Name: CMP.311 Park Ave.2017.12.pdf construction site. Provide a better description of where off-site parking will be. FP Response: Parking will occur in the driveway and sub-contractors and employees will be encouraged to carpool. Page: 9 Author: patrickh There is no mention of mechanical soil stabilization File Name: CMP.311 Park Ave.2017.12.pdf that would require a sound fence anywhere else in the CMP. Does this project include soil stabilization? If so, please provide more information. If not, are you still planning on using the fence described here? FP Response:The project does not include any soil stabilization.The project will be secured with a 6' high,tennis screen clad,temporary fence with a lockable gate. 10 (2) Page: 10 There is no"Appendix B"with this CMP. Please Author: patrickh 20""""°MP File Name: CMP.311 Park Ave.2017.12.pdf provide a site plan. Please prpWtle a sib FP Response:The site plan has been included. ps a° 9 sp°s REF:A-003 Page: 10 "t"°°.�p,�°°°°°°�to°°, 1 e "°"° Author: patrickh No site plan provided. File Name: CMP.311 Park Ave.2017.12.pdf FP Response:The site plan has been included. REF:A-003 12 (1) Page: 12 The allowable noise limit at this site is 70 db during ,'"' ° Author: patrickh mmg °° °° File Name: CMP.311 Park Ave.2017.12.pdf the summer on season (6/1-Labor Day)80 db all °°°°EOM1i5 other times. FP Response: 11.2 Noise Suppression plan note has been corrected to 70 db during the summer on season, 6/1-Labor Day.