ASBESTOS INSPECTION REPORT
CLIENT: Zanier Construction
ADDRESS: PO Box 909
CITY/STATE: Basalt, CO 81621
EMAIL: zanierconst@excite.com
PHONE: 970-948-1274
Ecos JOB NUMBER A-18-0004-AT
PROJECT LOCATION: 610 S West End St Unit F202
Aspen, CO 81611
DATE OF INSPECTION: 1/31/2018
RECEIVED
02/21/2018
ASPEN
BUILDING DEPARTMENT
e ins
Environmental Disaster Restoration,Inc.
ECOS Er.vironmental&Disaster Restoration(ECOS)was retained to conduct a limited asbestos
inspection at the above location in reference to determine if there is asbestos containing material
(ACM),in the building prior to demolition and remodeling of the unit.The inspection included all
accessible building materials,however,should any additional building materials be discovered during
demolition,those materials must be sampled and analyzed prior to continuing with the work. Thirteen
(13) samples were collected of all suspect materials throughout the building,as listed in the Lab Data
Table located on Page 8 of this report.
INSPECT DR QUALIFICATIONS
This inspection was performed by Alison George,Colorado State Department of Public Health and
Environment Certification Number 24206.
SAMPLE ANALYSIS PROCEDURE
Suspect material was sampled and delivered under a chain of custody for analysis to Aerobiology
Laboratory in Denver,CO. Samples were analyzed by Polarized Light Microscopy.
TRANSMITTAL OF BUILDING
One(1)copy of the results of the building/structure asbestos survey shall be immediately transmitted
by the building/structure owner as follows:
• One copy of the completed asbestos survey shall be sent by the owner or their agent to the local
government entity charged with issuing a permit for such demolition,renovation,remodeling
oz repair work under applicable State or local laws.
• The completed asbestos survey shall be kept on the construction site with the asbestos
notification and variance, if required, throughout the duration of the asbestos project and
ar_y associated demolition,renovation,remodeling or repair project.
REqEIVED
02/21/2018
ASPEN
BUILDING DEPARTMENT
e Os
Ens irnnm pill aI disaster Restoration,Inc.
BUILDING/STRUCTURE ASBESTOS SURVEY INFORMATION
The asbestos survey shall,at a minimum,identify and assess with due diligence,the locations,
quantities,friability and conditions of all building material types at the affected portion of the
building/structure. The certified asbestos inspector is responsible for identification and assessment of
all type within the affected portion of the building/structure.
All build ing materials visually assessed shall be assumed to be asbestos containing material(ACM),
unless bLlk sampling is conducted as per standard EPA and OSHA accepted methodologies.The
subsequent analysis is performed by a laboratory that meets the requirements and the analyses satisfies
both CO STATE ELAP and federal requirements,including multi-layered sample analyses,to
documert non-asbestos containing material.
The building/structure asbestos survey shall also include the building/structure name,address,the
building/structure owner's name and address,the name and address of the owner's agent,the name of
the firm performing the asbestos survey and a copy of the firm's current asbestos handling license,the
names of the certified inspector(s)performing the survey and a copy of the current asbestos handling
certificate for each inspector utilized,the dates of the asbestos survey,a listing of homogeneous areas
identifying which ones are ACM,all laboratory analysis reports for bulk samples collected,and copies
of the appropriate certifications for the laboratory used for analysis of samples taken during the
asbestos survey.
REMOVAL REQUIREMENT
If the but ding/structure asbestos survey finds that the portion of the building/structure to be
demolished,renovated,remodeled,or have repair work contains asbestos containing material(ACM),
which is impacted by the work,the owner or the owner's agent shall conduct,or cause to have
conducted,asbestos removal performed by a licensed asbestos abatement contractor in conformance
with all standards set forth.
All ACM impacted by the demolition,renovation,remodeling or repair project shall be removed,prior
to access Jr disturbance by other uncertified trades or personnel.No demolition,renovation,
remodeling or repair work shall be commenced by any owner or the owner's agent prior to the
completion of the asbestos abatement in accordance with the notification requirements.For multi-,
phased work,the access restriction for uncertified trades or personnel applies to each intermediate
portion of the entire project.Upon completion of the intermediate portion of the asbestos project,other
trades,or personnel may access that portion of the work site.For demolition projects that are exempt
from asbestos survey requirements due to being structurally unsound,the demolition is considered
an asbestos project.
All buildhtg/structure owners and asbestos abatement contractors on a demolition,renovation,
remodeling,or repair project shall inform all trades on the work site about the ACM at the work site.
RE33 E IVE D
02/21/2018
ASPEN
BUILDING DEPARTMENT
ecos
Environmental Disaster Restoration,Inc.
UNIDENTIFIED AND UNASSESSED ASBESTOS
When . construction activity,such as demolition,remodeling,renovation or repair work,reveals
suspect ACM that has not been identified by the asbestos survey,or has not been identified by other
inspections as per current OSHA or EPA requirements,all activities shall cease in the area where
the suspect ACM is found.Unassessed suspect miscellaneous ACM shall be treated and handled as
ACM and assumed to be ACM,unless proven otherwise by standard EPA and OSHA accepted
methods, To document non-asbestos containing material,analysis must be performed by a laboratory
that meets the requirements of the DOH;and the analysis satisfies both CO STATE ELAP and federal
requirements.
ASBESTOS PROJECTS
An asbestos project is any work that involves the removal,encapsulation,enclosure,repair or
disturbance of friable or non-friable asbestos,or any handling of asbestos material that may result in
the release of asbestos fibers.For the purpose of compliance an asbestos project shall include any
disturbance of asbestos fibers,and the planning,asbestos survey,design,background air sampling,
inspectio-i,air sampling and oversight of abatement work,cleanup,and the handling of all asbestos
material subject to abatement,as well as the supervising of such activities.An asbestos project starts
with Phase I when the planning,asbestos survey,and design work begins or is required to begin.The
project st all not be considered completed until Phase II D is complete. (See Table 1 below).
Phase I Phase II
(Prior to Asbestos Start->Abatement->End
Abatement Contractor)
A B A B C D
Regulated Asbestos Final
Asbestos abatement handling cleaning Final waste
survey, Background work area(s) including gross and removal
planning, air sampling preparation removal or clearance from site
and design and enclosure abatement,initialair samples
construction cleans,and waste
Start->Asbestos Project->Final Clearance
REC4EIVED
02/21/2018
ASPEN
BUILDING DEPARTMENT
e r n s
Environmental&Disaster Restoration,Inc.
ASBESTOS RESULTS FLOW CHART
Asbestos Test
ID
- Non Detect
I
No Action OSHA Reg. 8 dditional Reg. 8
Requirements
Required Requirements Requirements >3,000 SF
1
NO Permit i
Required 1 Permit Project Design i
ECOS provides IProject Manager 1
clearance (NOT Clearance Testing Oversight
required) i
Manifested
Disposal at
Approved Landfill
AsI'ccT pRnIFCT SI7v
Large asbestos project:An asbestos project involving the removal, disturbance,enclosure,
encapsulation,repair or handling of 160 square feet or more of ACM,or 260 linear feet or more of
ACM.
Small asbestos project: An asbestos project involving the removal,encapsulation,enclosure,repair,
disturbance or any handling of more than 10 and less than 160 square feet of ACM or more than 25 and
less than 260 linear feet of ACM.
Minor asbestos project:An asbestos project involving the removal,disturbance,repair,encapsulation,
enclosure or handling of 10 square feet or less of ACM or 25 linear feet or less of ACM.
RECP IVE D
02/21/2018
ASPEN
BUILDING DEPARTMENT
DEFINI I ONS
Abatem nt:Procedures to control fiber release from asbestos material. This includes removal,
encaps ation,enclosure,repair,and disturbance of friable asbestos or any handling of asbestos
material that may result in the release of asbestos fibers.
Amosite An Asbestiform mineral of the amphibole group containing approximately
50% sili..n and 40% Iron(II)Oxide,and is made up of straight brittle fibers,light gray to pale brown in
color.
Amphib I le:One of the two major groups of minerals from which the Asbestiform minerals are
derived,distinguished by their chain-like crystal structure and chemical composition.
Asbesto :A generic name given to a number of naturally occurring hydrated mineral silicates that
possess . unique crystalline structure,are incombustible in air,and are separable into fibers. Asbestos
includes the asbesti-form varieties of chrysotile(serpentine);crocidolite
(riebec ' e);amosite(cummington-grunerite);anthophyllite;and actinolite.
Asbesto Project:Work undertaken by a contractor which at any time involves any aspect of the
removal encapsulation,enclosure or disturbance of friable asbestos,or any handling of asbestos
material that may result in the release of asbestos fiber,except work in an owner-occupied single family
dwellin l. performed by the owner of such dwelling. An asbestos project shall include the planning,
6
RECEIVED
02/21/2018
ASPEN
BUILDING DEPARTMENT
ecos
Environmental disaster Restoration,Inc.
REMOVAL CATEGORIES
Catego I Non-Friable ACM:NESHAP classification-Asbestos-containing packings,gaskets,resilient
floor co -ring,and asphalt roofing products,containing more than one percent(1%) asbestos,that
when d ,cannot be crumbled,pulverized, or reduced to powder by hand pressure.
Catego II Non-Friable ACM:NESHAP classification-Any material,excluding Category I Non-Friable
ACM,co taming more than one percent(1%) asbestos that,when dry,cannot be crumbled,pulverized,
or reduced to powder by hand pressure.
Class I • sbestos Work: OSHA term meaning activities involving the abatement of Thermal Systems
Insulatio (TSI),and surfacing ACM and PACM.
Class II sbestos Work: OSHA term meaning activities involving the abatement of ACM which is not
TSI or su facing material.This includes,but is not limited to,the removal of asbestos-containing
wallboar.,floor tile and sheeting,roofing and siding shingles,and construction mastics.
Class III • sbestos Work: OSHA term meaning Repair and Maintenance operations,where no more
than a m or quantity of ACM,including TSI and surfacing ACM and PACM,is likely to be disturbed.
Class IV • sbestos Work: OSHA term meaning Maintenance and Custodial Activities during which
employe;s contact but do not disturb ACM or PACM and activities to clean up non-ACM dust,waste
and deb s resulting from Class I,II and III activities.
RECEIVED
02/21/2018
ASPEN
BUILDING DEPARTMENT
EnvironmentaI Disaster Restoration,Inc.
design,monitoring,inspection,and air sampling of abatement work, as well as the supervising of such
activities.
Building Owner:The person in whom legal title to the premises is vested unless the premises are held
in land trust,in which instance building owner means the person in whom beneficial title is vested.
Electron Microscopy:A method of asbestos sample analysis which utilizes an electron beam to
differentiate between fibers.
Emergency:An unexpected,unanticipated or unforeseen occurrence,including but not limited to,a
steam,chemical, gas or water line rupture,a boiler failure,or a building collapse,which poses (a) an
imminent danger to the health and safety of the public,the response to which will constitute an
asbestos project;or(b) an asbestos-related risk to the health and safety of the public from exposure to
asbestos fibers.
Friable Asbestos:Any materials that contain more than 1% asbestos and can be crumbled, pulverized,
or reduced to powder by hand pressure.
HEPA Filter Vacuum Equipment:Vacuuming equipment with a high efficiency particulate air
filtration system. This filter is capable of trapping and retaining 99.97 percent of asbestos fibers greater
than 0.3 microns equivalent aerodynamic diameter.
Homogenous:Evenly mixed and similar in appearance and texture throughout.
NESHAP:National Emission Standard for Hazardous Air Pollutants
OSHA:Occupational Safety and Health Administration
Operations and Management Plan (OMP): Specific procedures and practices developed for the
interim control of asbestos-containing materials in buildings until it is removed.
Polarized Light Microscopy (PLM):An optical microscopic technique used to distinguish between
different types of asbestos fibers by their shape and unique optical properties.
Repair:Corrective action using required work practices to control fiber release from damaged asbestos
material.
TSI:Thermal Systems Insulation
RECEIVED
7
02/21/2018
ASPEN
BUILDING DEPARTMENT
EE os
Environmental Disaster Restoration,Inc.
LAB D.-
Sample Suspect Material Detect Non Percentage Friability Condition APPR.SF
Detect
Al Texti.se,tape,paint,joint Y 2% Yes Good 900sf
compound,drywall
A2 TextLre,tape,paint,joint Y 2% Yes Good 900sf
compound, drywall
A3 Texture,tape,paint,joint Y 2% Yes Good 900sf
comf ound, drywall
AB1 Granular plaster X 0% Yes Good 20sf
AC1 Granular plaster X 0% Yes Good 10sf
AD1 Plaster,caulking X 0% Yes Good 30sf
AE1 Plaster,resinous material X 0% Yes Good 30sf
AF1 Granular plaster X 0% Yes Good 15sf
AG1 Wood,paint X 0% No Good 2001f
AH1 Mastic,paint,wood X 0% Yes Fair 2001f
AJ1 Compound, paint, drywall Y 2% Yes Good 800sf
AJ2 Mesh,brown fibrous material, Y 2% Yes Good 800sf
paint, compound
AJ3 Compound,paint, drywall Y 2% Yes Good 800sf
L\% Asbestos abatement is
required per this
Homogenous Material Description report. The building
A Light trowel texture drywall (Living room,bedrooms) department cannot
AB Tile grout Kitchen floor sign off on this permit
AC Tile Grout Kitchen wall until that abatement
AD Tile Grout Bath surround has taken place and a
AE Tile Grout Bath Surround post-abatement clean
AF Tile Grout Bath Floor air report has been
AG Skirting board mastic submitted.
MI Coving mastic
A U. .w- - ■ - • rV _ ': ,•- _:• A. .,
CONCLC"
Visual inspection was completed of all building materials to be affected during demolition and
remodel. Thirteen(13) samples were collected and sent to Aerobiology Laboratories in Golden, CO, for
analysis using Polarized Light Microscopy (PLM). Six (6) of the samples came back detect for 2%
Chrysotile,requiring Colorado Reg.8 procedures;abatement of asbestos by an approved firm,
permitting,clearance and disposal at an approved waste disposal site.
RECEIVED
8
02/21/2018
ASPEN
BUILDING DEPARTMENT
ecos
Environmental& Disaster Restoration,Inc.
•
CERTIFY'. 'TIONS...I•
•
•la is• •
• Colorado
of Pubhci=erit
and Environment
•F
ASBESTOS CONSULTING FIRM
IIThis certifies that
ii" •
Ecos Environmental and Disaster Restoration,Incl
it, _
it -
r• Registration No.:ACF-14480
has met the registration requirements of 25-7-507.C.R.S.and the Air Quality Control
Commission Regulation No.8.Part R.and is hereby authori/ed to perform asbestos consulting •
activities as required under Regulation No 8,Part Fl.in the state of Colorado. ,
,.... • , Issued. September 09.2017 :./ ,../
'i• Expires: September 09,2018 ,./} . -...
. . ,
-%. 104 H-Alialigit*A1.4416"'7- -41INAttil IOU> ;, .'Ai, .40rAit ..
..-
t
i -:k_....t?..•,1 ...,..t_
•..,.._..!..- .
.,
, Colorado Dvartrocm \
C
of Pabbc Health
and Environment )
..,
(
ASBESTOS
CERTIFICATION*
-
rThis certifies that N:
)
( Alison George
I -
\ Certification No.:24206 '''s:
s....
(. 1.5 cant!tic requiretnents of 25-7-5ffT.C.ItS.and Air Qt.ialt Control R
Commission Regulation No.R.Part It.and is hereby certified by the
state of Colorado in the lams ing dn.cipline.
Building Inspector*
Issued: .199onn II,20111
Lapires: Jane.,II.2019
(
> •19.a.Pmels•••••••6.11ierearriame•
( ..1..11•4..yrr4.1.4•nr.
4-ma
rit
RECEIVEu
02/21/2018
ASPEN
BUILDING DEPARTMENT
ecos
Environmental tr Disaster Restoration,Inc.
FINAL N.
This repo:t represents the opinion of the reporting asbestos inspector at the time of the asbestos
assessme t survey. If you have any further questions, or if additional information is needed please do
not hesit.to to call.
Sincerely
Alison G:orge
Colorado State EPA Asbestos Inspector#24206