Loading...
HomeMy WebLinkAboutFile Documents.311 Park Ave.0319.2017 (16).ARBK Permit # Aspen Building Permit Application Checklist THE CITY OF ASPEN for Single Family, Duplex, & Townhome (IRC) 311 PARK AVE. ASPEN, CO 81611 PARCEL I.D. NUMBER 273718100049 JOB ADDRESS OWNER RICHARD FULLERTON DATE The following are potential requirements for various types of residential projects. Permits must include ALL of the applicable items on this checklist or they will not be accepted. Incomplete permits will be turned away. Refer to the IRC Building Submittal Guide, Zoning Checklist, Engineering Sufficiency Checklist, Engineering Design Standards, CMP Manual and guides from other referral departments for clarifications and descriptions on each item. Digital copies of all documents and plans are required for all submittals. 8 1/2" x 11" Documents Submittal New Addition Alteration Interior Demo Repair Requirements Constructi /Remodel only (complete) on Alteration Planning Approvals E El RECEIVED Residential 2/2 9/2 017 Design Standards ❑ ❑ ❑ ASPEN Approval LDING DEPARTMENT Permit Application Packet* 0 E 0 ❑ Asbestos test 11 and clearance reports ❑ E State Asbestos V IMF Demolition11111 Approval Notice Fireplace iiii Registration Form & ❑ E ❑ Manufacturer's al installation instructions 4/7/17 Page 1 of 4 Energy Code Compliance IP U-Factor Fenestration Docs ❑ ❑ ✓ RREMP documents Line Grade MAL Verification Form Signed Special Inspection and Testing ❑ El ❑ Agreement Verification of RECEIVED Structural Integrity 12/29/2017 ASPEN Soils Report LDING DEPARTMENT Drainage Report Smuggler Superfund Soil Removal Permit Mechanical Docs 4/7/17 Page 2 of 4 Submittal New Addition Alteration/ Interior Demo Repair Requireme Constructi Remodel only (complete) nts on Alteration Photos Unit/Buildin ❑ ❑ 9 relationship CMP ❑ ✓ ❑ Engineering ❑ ❑ ❑ Sufficiency .111 Checklist Residential ECU ❑ ❑ Calculator Landscape Efficiency ❑ ❑ Checklist Fire Suppression Calculations Water/sewe r service ❑ disconnect applications *Permit Application Packet must be filled out in its entirety including contact sheet, land use/scope of work , ED building description form, HOA compliance form, asbestos checklist, valuation affidavit, and zoning compliance verification policy or your submittal will not be accepted. 24"x36" & 11"x17" Plans 12/29/2017 Sheets must be in the following order. Existing plans required for all additions &alterations ASPEN BUILDING DEPARTMENT Submittal New Addition Alteration/ Interior Demo Repair Requireme Constructi Remodel only (complete) nts on Alteration Cover Sheet Survey A Floor Area Calcs: ❑ � Existing & Proposed Demolition Calcs Fire Area Sheet ❑ � 4/7/17 Page 3 of 4 Site Plan RREMP Plan Floor Plans: Existing & ❑ ❑ Proposed Reflected Ceiling Plans ❑ ❑ Lighting Plans w/ ❑ ❑ spec sheet Sections Details Air Sealing W 11111 Details R • EIVED Fireplace 12/29/2017 DetailsASPEN III❑ ❑ LDING DEPARTMENT Schedules Excavation/ VIP Earth Retention Plans Civil Plans Mechanical Plans Structural Plans ❑ Radon Plan 4/7/17 Page 4 of 4