HomeMy WebLinkAboutFile Documents.311 Park Ave.0319.2017 (17).ARBK PERMIT NUMBER: 0319.2017.ARBK MASTER PERMIT: DATE: 12/29/17
•
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION THE CITY OF ASPEN
PROPERTY INFORMATION
Call Assessor(970-920-5160)to verify 1
ADDRESS 311 Park Ave. Aspen, CO 81611 UNIT# PARCEL ID# 273718100049
Lot.SEE AND:-Lot:MAND:-Lot.B S20 FT` BLOCK Block 1 TRACT Riverside Addition
LOT OR SUBDIVISION
DESCRIPTION OF The scope of work includes an interior remodel on an existing structure with minor improvements to the exterior.The front door is being relocated closer to Park Avenue,to conform with the new Residential Design Standards.A new staircase will be constructed in the
WORK IN DETAIL
existing light well on the street facing facade and all exterior railings will be replaced.Sliding glass doors will replace areas of existing fenestration facing the river.Skylights will be added to the existing roof and portions of the main and upper level Floor will be replaced with a glass floor system.The existing ro
BEST CONTACT Ryan Lee CELL 405-314-5104 EMAIL Rlee@forumphi.com
NAME
OWNER NAME 311 Park Ave LLC CELL 970-319-8253 EMAIL fcplp@yahoo.com
PROJECT DETAILS
PROJECT VALUATION"I,000,00o Use of Building Class of Work Fixture Counts Equipment Checklist
❑ Commerical 0 Toilets,Bidets
Q F ❑ New Forced Air/Gravity Systems
WORK AREA 0 Multi-Family ❑■ Addition Bathtub Wall,Suspended,or Unit Heaters
❑■ Single Family ❑■ Alteration O Lavatory(Wash Basin) —Gas'Log
UNIT SQ FT 3,459.25 Existing Gross El Mixed-Use ❑■ Repair J Shower g
Kitchen Sink(+Disposal) —Gas Appliancew
LOT SIZE 0 0 IFFR TDishwasher Appliance Vents
(SQ FT) 3,473.75 Gross Lot Area ❑ Tenant Finish I Laundry Bar,Utility Sink Heat,Refrig,Cooling,or
SQFTOFLAND- Will there be 0Demolition I Clothes Washer Absorption Unit
SCAPE WORK o any roof/wall ❑ Change Order Floor Sink Boilers(includes vent)
penetrations? 0 Floor Drain Air Handl' i -.4r
NEW SQ FT 3,599 Proposed Gross ❑■ Yes Shower Cooling
ID No Heater(Pan Req) E Il/E
1.-})�
NOTICE: This permit becomes null and Ventilation
5Q FT OF ROOMSOutlets#Gas
WITH UTILITY WORK void if work or construction authorizedRange Hood is not commenced within 180 days,or Water Treatment #of Gas Sy�9�/6� 2 O 1 7if construction or work is suspended or Other
abandoned for a period of 180 days at U Snowmelt System Sq Ft
any time after work is commenced. ASPF lei
Details Term Definitions I 1 , 2 el.'„r!.•"
Project Valuation:Cost of project as defined in Valuation Affadavit.
Sq Ft of Work Area:Total square footage of area undergoing change or reconfiguration.
Unit Sq Ft:Gross Square Footage,not FAR,of permitted unit. APPROVALS
Lot Size:Total surveyed square footage of property.
Sq Ft of Landscape Work:Square footage of disturbed exterior area. Reviewing Review Reviewer Date
New Sq Ft:Total added square footage for additions to net livable or net leasble space. Department Required Initials Approved
S. Ft of Rooms with Utilit Work:Total square foota:e not FAR of all rooms with .lumbin:work. Zonin X JPo 10/15/18
FOR CITY USE ONLY g
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES HPC
Plan Check Permit Fee Parks Impact o Building X JH 10/2/18
Energy Code REMP School Ded. o Fire X JH 7/27/18
Zoning(50%) Plan Check TDM Impact 0 Engineering
(Hourly) CMP
Engineering Review Zoning(Hourly) Ped.Amenity o
CMP(50%) Engineering Housing Cash in Lieu Utilities
(Hourly) Water x so, 8/1/18
Parks Review Zoning(50%) Stormwater Stormwater
Utility Review CMP(50%) City Use Tax
Sanitation
Other Electrical County Use Tax Env. Health
Plumbing GIS
Mechanical Sanitation Parks
Landscape
Lot Area Efficiency
Zone District Approved DAM 10/16/18
Deed Restricted To Issue
PLANS LOCATION Census Code Issuance
# of Dwellings
CITY OF ASPEN August2017 130 S. GALENA ST ASPEN, CO 81611
PERMIT NUMBER: ADDRESS:
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET •
THECI7YOFASPE
FOR PLAN REVIEW QUESTIONS
Name Phone E-mail
FOR INSPECTION QUESTIONS
Name Phone E-mail
OWNER
Name 311 Park Ave LLC IN CARE OF RICHARD FULLERTON Phone 970-319-8253 Cell Phone
Mailing 2047 Fillmore St. San Francisco CA 94123
Address City State ZIP
E-mail Address fcplp@yahoo.com
OWNER'S AUTHORIZED AGENT
Name Phone Cell Phone
Mailing
Address City State ZIP
E-mail
Address
APPLICATION BEST CONTACT
Name Ryan Lee Phone Cell Phone 405-314-5104
Mailing Address 715 W. Main St. Ste 204 City Aspen State CO ZIP 81611
E-mail Address rlee@forumphi.com
ARCHITECT OR DESIGNER OF RECORD
Name Steev Wilson Phone Cell Phone 970-279-4109 ; '- ��
Mailing
Address City 715 W. Main St. Ste 204 Aspen State CO ZIP 8 61'1
E-mail Address swilson@forumphi.com 12/29/2017
CIVIL ENGINEER OF RECORD
Name Phone Cell Phone 'ZIUILDING DFPARTMF"
Mailing
Address City State ZIP
E-mail
Address
STRUCTUAL ENGINEER OF RECORD
Name Steve Edmiston-Evolve Structural Phone 970-510-0773 Cell Phone
Mailing 1040 Main Street Carbondale CO 81623
Address City State ZI P
E-mail Address steve@evolvestruct.com
GENERAL CONTRACTOR
Name Phone Cell Phone
Mailing
Address City State ZIP
E-mail
Address
INSPECTIONS: The General Contractor must schedule inspections online.
Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so.
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the
structure and/or project is built in compliance with all applicable codes.
Contractor
Signature Date
❑ Check if you are a tested owner builder(single-family homes only).You must take a test and complete the owner/building affidavit.
(CITY USE ONLY) Owner builder approved by: Date: Affidavit on file
CITY OF ASPEN August2017 130 S. GALENA ST ASPEN, CO 81611
PERMIT NUMBER: ADDRESS:
COMMUNITY DEVELOPMENT DEPARTMENT
SCOPE OF WORK CHECKLIST THECnorASPL,
LAND USE QUESTIONS
If you check any of the boxes below, please consult with the Planner of the Day(planneroftheday@gmail.com) before submitting your
permit application.
Does your permit involve any of the following?
ElPart of an approved COA Land Use Review ❑ Work involves Landmark Parcel or Historic District
❑ Work affects net leasable, net livable, or ❑ Located in 100-year flood plain or within 100' of high
non-unit space water mark
❑ Work involves lot splitting or combining a lot ❑ Work involves changes in occupancy to structure
❑ Work involves exterior of structure ❑ Changes to elevator or stair configuration
❑ Changing the number of residential units Changes to the use of existing structure or space
❑ Changes to number or location of
onsite parking
ADDITIONAL SCOPE OF WORK QUESTIONS RECEIVED
Does your permit involve any of the following? 12/2 9/2 017
Exterior lighting added or changed El Work involves exterior wall penetrations ASPEN
3UILDING DEPARTMENT
ElWork involves roof penetrations ❑ Work involves digging or excavation
Work adds, removes, or changes ❑ Work involves restaurant or food service
plumbing fixtures
ElDisturbs 1,000 sq ft or more of soil within ❑ Affects parking spaces/meters, loading zones, or alleys
12 months
❑ Work occurs in public right of way ❑ Adding structures or systems over utility lines
▪ Work affects trees or occurs within the ❑ Work within City Mall boundaries
dripline of a tree
CITY OF ASPE NAugust 2017 130 S. GALENA ST ASPEN, CO 81611J
PERMIT NUMBER: ADDRESS:
COMMUNITY DEVELOPMENT DEPARTMENT
Alk
BUILDING DESCRIPTION FORM - IRC & IBC THE CITY OF ASPEN
BUILDING CODE INFORMATION
❑■ 2015 IRC ❑ 2015 IBC ❑ Other (Please Explain)
Code Editions (As Adopted and Amended) (As Adopted and Amended)
Fire Sprinkler System I Existing? M°No I Required? M°Neos I Type ❑ NFPA 13 ❑ NFPA 13 R ❑ NFPA 13 D
Type Of Construction ❑ VA ■❑ VB❑ IV ❑ IIIA ❑ IIIB ❑ IIA ❑ IIB ❑ IA ❑ IB Fire Alarms Installed ■❑ Yes❑ No
Required Special Inspections ❑■ High-Strength Bolting ❑ Epoxy Anchors ❑ Structual Steel Welding
❑ Permanent Micropiles ❑ Sprayed Fire-Resistants ❑ Other
Energy Code Compliance ❑■ Prescriptive Table
❑ RESCheck UA Alternative ❑ COMCheck UA Alternative
Exterior Energy Use Total Approved On-Site Snowmelt Spa Pool
(Existing + New)
Building Type/ I ❑ A_ ❑ B ❑ F_ ❑ E ❑ R_ I ❑■ One Family ❑ Two Family
Occupancy Group g ❑ B (A<50) ❑ H ❑M ❑ S_ R
C ❑ I ❑ U C ❑ Townhouse
UNIT DESCRIPTION AS PROPOSEDREM" ,
# Stories Above Grade 2 # Stories Below Grade 1 ADU BUILDING DESCRiPilOIL
/29/201
Attached Garage Detached Garage Carport Is there an ADU? 0 Yes
Parking Spaces , Parking Spaces Parking Spaces ❑ No ASPEN
# Living Rooms BUILDING DEPARTME T
# Bedrooms 4 # Full Baths 1 Deck Area # Kitchens
# Full Baths
# 3/4 Baths 3 # 1/2 Baths 1 # 3/4 Baths
# 1/2 Baths
# Kitchens 1 #Wood Fireplaces # Bedrooms
# Gas Appliances # Gas Logs #Other Rooms (List)
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement 001 Bedroom 1,002 Bath 1,003 Game Room,004 Bedroom 2,005 Bath 2,006 Laundry Room,007 Mechanical Room,008 Bedroom 3,009 Bath 3
Main Level 101 Entry, 102 Mudroom, 103 Master Bedroom, 104 Master Closet, 105 Master Bath, 106 Garage
2nd Floor 201 Kitchen, 202 Dining, 203 Living, 204 Office, 205 Powder Room, 206 Pantry
3rd Floor
Additional
•
Reviwed By: JH Date:7/27/18
CITY OF ASPEN August2017 130 S. GALENA ST ASPEN, CO 81611,
PERMIT NUMBER: ADDRESS:
COMMUNITY DEVELOPMENT DEPARTMENT
HOMEOWNER ASSOCIATION COMPLIANCE FORM THE CIEYOFASPEN
All applications for a building permit within the City of Aspen are required to include a certification of compliance
with applicable covenants and homeowner association policies. The certification must be signed by the property
owner or Authorized Agent representing the property owner. The following certification shall accompany the
application for a permit.
311 Park Ave.
ADDRESS 273718100049
UNIT PARCEL ID#
I, the property owner, certify as follows: (pick one)
El This property is not subject to a homeowner's association or other form of private covenant.
❑ This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit do not require approval by the homeowners association or covenant
beneficiary.
❑ This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit have been approved by the homeowners association or covenant benefiCSI jE
it.*J A 1/
12/29/2017
ASPEN
I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning or"e re�a ARTMENT
private covenants or homeowner association rules or bylaws. I understand that this document is a public
document.
Fullerton
Date:2017.12.11 13:10:04 Digitally signed by Fullerton
Owner Signature -08'00' Date
Owner Printed Name Richard Fullerton
OR
Authorized Agent Signature Date
Authorized Agent Printed Name
•
CITY OF ASPEN August2017 130 S. GALENA ST ASPEN, CO 81611J
i 1
PERMIT NUMBER: ADDRESS:
COMMUNITY DEVELOPMENT DEPARTMENT
VALUATION AFFADAVIT THE CITY OFASPE
AFFIDAVIT POLICY
•
All applications for a building permit within the City of Aspen are required to include a certification of
compliance with building permit valuation requirements. The certification must be signed by the property
owner or authorized representative. The following certification shall accompany the application for a permit.
I, the property owner or authorized agent, understand and certify as follows:
City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and
International Building Code (IBC) with certain amendments. These codes define building valuation as follows:
R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a
permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems,
including materials and labor.
109.3 Building permit valuations. The applicant for a permit shall provide an estimated permit value at time
of application. Permit valuations shall include total value of work, including materials and labor, for which the
permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in
the opinion of the building official, the valuation is underestimated on the application,the permit shall be
denied, unless the applicant can show detailed estimates to meet the approval of the building official,Fin l,,; 41
building permit valuation shall be set by the building official.
12/29/2017
City policy indicates that permit valuation includes materials and labor for the structure and mechanic ISp
electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systern1b5ARTMErT
audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction I
such as equipment rental and contractor fees. Finish materials such as paint, floor coverings, tile, cabinets and
counter tops are included in the permit valuation total.
Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development
mitigation fees, trash removal, and cleaning are not included.
I certify that the permit valuation entered on the permit application for this property complies with the above
valuation requirements. I understand that this document is a public document.
Digitally signed by Fullerton
Fullerton
Date:2017.12.11 13:10:34
Owner Signature: _cowDate:
Owner Printed Name: Richard Fullerton
or,
Authorized Agent Signature: Date:
Authorized Agent Printed Name:
CITY OF ASPEN August2017 130 S. GALENA ST ASPEN, CO 81611J
1
PERMIT NUMBER: ADDRESS:
COMMUNITY DEVELOPMENT DEPARTMENT
ASBESTOS VERIFICATION AND CHECKLIST THE CITY OF ASPEN
ASBESTOS INFORMATION
Asbestos is a known human carcinogen and is an airborne hazard.Once airborne,asbestos fibers can stay suspended in the air for days,
weeks, or even months before settling out of the air.The fibers can easily become airborne again from a minor disturbance like turning
on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos
hazards that could expose people to asbestos in the future, long after the renovation activity occurred.The airborne asbestos fiber
concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home.
The 1989"ban"on asbestos-containing materials is commonly misunderstood. In fact, in 1991 the U.S. Fifth Circuit Court of appeals
vacated much of the so-called "Asbestos Ban and Phaseout Rule"and remanded it to the EPA.Thus, much of the original 1989 EPA ban
on the U.S. manufacturing, importation, processing,or distribution in commerce of many asbestos-containing product categories was
set aside and DID NOT TAKE EFFECT.Therefore,ALL demolition, remodel or renovation projects must determine if disturbed material
above the trigger levels contains asbestos.
ASBESTOS CHECKLIST
❑Yes❑ No
Residential: Will you be removing more than 32 sq ft, 50 linear feet (e.g., pipe insulation), or the volume
equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel—examples are drywall,
linoleum, ceiling tiles, roofing materials, etc.?
❑Yes❑ No
Commercial: Will you be removing more than 160 sq ft, 260 linear feet (e.g., pipe insulation), or. lu eiL
l,. 1 'l
equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel—example erwg If;
linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.? 12/29/201
If the answer is YES to any of the above, you will need an asbestos test before you can receive a buildi<land/
or demolition permit. You will also need to provide plans indicating areas to be demolished and deter'mtn*if'a
CO state demolition license is required. A state certified asbestos inspector must do this test and the test report
must be submitted with the building permit application. If the building has asbestos, a state certified asbestos
abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building Division
stating that all the asbestos has been removed and that the air is clean. This letter must be received BEFORE a
permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state.co.us/ap/
asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof of current
state certification.)
If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the
Aspen permit app. This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE:
A copy of this demolition permit app must be submitted with the initial building permit application. When the
CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our
permit.
i
I hereby certify that the above information is true and complete.
Owner Richard Fullerton Phone #
Applicant (print name) Ryan Lee Phone #
Ryan Lee Digitally signed by Ryan Lee 12-12-17
Applicant Signature Date:2017.12.1215:59:46-07'00' Date
Please call the City of Aspen Environmental Health Department at 920-5039 at any time if you have questions
about asbestos, interpreting your test results, or other matters.
CITY OF ASPEN August2017 130 S. GALENA ST ASPEN, CO 81611
PERMIT NUMBER: ADDRESS:
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY THE Cif Y OF ASPEN
Applicability: All development projects must comply with the City's zoning regulations, including height and
location, and are subject to periodic inspection during construction and a final inspection prior to project
completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen
shall verify height and/or location compliance through submission of a survey report.
Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one
foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance
through this method.
In addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/
duplex development or other projects where compliance may be in question. Independent of this policy, all
projects must comply with all applicable zoning limitations.
The Zoning Officer will inform the applicant during building permit review if verification will be required.
However, circumstances may require zoning compliance verification of a project which is already underway.
Timing: Height verification should be accomplished at a point of construction when enough roof structure is in
place to accurately measure the structure yet early enough in the process to still make changes if the strticti4 e' r L.`,
is too tall. Location verification should be accomplished at a point of construction when the final exterior of the
structure can be accurately measured in relation to setback requirements. Applicants are encouragg¢yib2o9112ro17
with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to
perform their own verification during construction to ensure the building is progressing to plan, includiriii*
height and location of foundation forms prior to concrete pours.
Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a
structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The
City's Zoning Officer can assist in determining which elements of the structure should be measured and if natural
or finished grade should be used.
The report shall include the following information:
1-A brief cover letter with the building permit number, name of the project, name of the owner and general
contractor, with a written description of the measurement methods including date(s) of measurement.
2-For location verification: A plan drawing showing property boundaries, permitted setbacks, building envelope
(if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all
exterior veneer or other exterior treatments), and the location and dimension of each observed measurement.
3-For height verification: Elevation drawing(s) showing the natural or finished grade of the property, maximum
permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior
sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles,
or other veneer treatments orornamentation), and the location and dimension of each observed measurement.
Additional roof plans showing location of measurements may be necessary.
CITY OF ASPEN August2017 130 S. GALENA ST ASPEN, CO 81611
r 1
PERMIT NUMBER: ADDRESS:
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY THE On or ATE\
•
4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/
elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items
unique to the project.
5-The report shall include a written description or drawing notes of the benchmarks or control points used to
establish property boundaries, setbacks, building location, building height,and grades for each measurement.
6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in
the approved building permit set.
7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who
conducted the field measurements certifying that the field measurements areaccurately represented.
Review and Acceptance of Report: The Zoning Officer shall review the report(s) and either confirm the project
conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets
the zoning limitations for the property or shall determine which elements of the project are not in compliance.
The Zoning Officer may request additional information to verify zoning compliance, which may include but is not
limited to additional survey work or a site visit. RECD./EP
All drawings of the survey report must correlate with representations in the approved building perry re2§D/2017
acceptance. Modifications to field conditions or amendments to the building permit may be required.
ASPEN
A determination of non-compliance shall result in the issuance of a correction notice and possible"wo" rrk'q DEPARTMENT
stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the
construction process to minimize disruption to the construction schedule.
Acknowledgment:
I (contractor name) understand this policy. I agree that thi• project will
comply with the zoning limitations affecting this parcel and the representations made on the zo► ing sheets of
the approved building permit plans. I understand that a Certificate of Occupancy will not be iss -d until this
project complies with all applicable zoning limitations.
Contractor Signature:
Date:
Contractor needs to
sign before issuance
•
CITY OF ASPEN August2017 130 S. GALENA ST ASPEN, CO 81611J