Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.1205 Tiehack Rd.0100.2018.ARBK
• ., .• _ - • -> lip k . i '''' 'III IS' tvrt,..H.4116;,:., s '4°• � 4. t y zA *kVt_ tom. • Imo!_ -' `1.. � . „`��y`WA 1e i ce. Specification—grade Underlayments Carlisle's WIP 300 and 400 series of underlayments offer some of the best physical properties in the industry.With unparalleled performance at a competitive cost,WIP underlayments are the choice for use under metal roofs and in low and high temperature applications. WIP 300HT—this superior underlayment for use in high-temperature applications is an outstanding performer under metal, copper and C0R-TENS. WIP 400—this high-performance, premium underlayment provides exceptional protection in critical roofing areas against damage caused by wind-driven rain and ice dams. WIP 401LT—this specialty, high-performing underlayment is designed specifically for use in low-temperature applications. Dare to Compare The following charts compare Carlisle's WIP 300 and 400 series products to a leading competitor's specification-grade products. The results speak for themselves. High-temperature Underlayment Comparison Premium,Specification-grade Underlayment Comparison Competitor's Competitor's Test/Properties WIP 300HT Ultra Test/Properties WIP 300HT WIP 400 Ice&Water Product Shield' Roll Size 198 sq.ft. 198 sq.ft. Roll Size 198 sq.ft. 225 sq.ft 225 sq.ft. Thickness 40 mils 30 mils Thickness 40 mils 40 mils 40 mils Tensile Strength 250 psi 250 psi Tensile Strength 250 psi 250 psi 250 psi Elongation at Break 250% 250% Elongation at Break 250% 250% 250% Low Temp Flexibility -45°F -20°F Low Temp Flexibility -45°F -45°F -25°F Permeance 1 0.02 perms 0.05 perms Permeance 0.02 perms 0.02 perms 0.05 perms 60 days(black) 60 days(black) Exposure ays 60 days Exposure 60 days 30 days 120 days(white) 1 esign o Plywood 0) 4 lbs/in width 31bs idth Adhesion to Plywood(1) 4 lbs/in width 4 lbs/in width 3 lbs/in width Code(Approvals Code Approvals ICC-E$�-- ' Yes _ Yes ---ti ICC-ES Yes Yes Yes UL-7 0 Class A/C Yes I Yes I' UL-790 Class A/C Yes Yes Yes ASTM Yes Yes ASTM D1970 Yes Yes Yes Florida Quality FL6785-R6 Yes Yes 2009 and 2012 International Yes Yes Miami-Dade County Yes Y Building Code— `Ice&Water Shield is a registered trademark of W.R.Grace&Co. 2007 Florida Building Code Yes Yes (1)Test Method:WIP ASTM D1970;Competitor ASTM D903 Approval Product#6785 Learn More You can find all technical data, literature,details and even locate your local representative online at www.carlislewipproducts.com. RECE WED 04/13/2018 ASPEN BUILDING DEPARTMENT G4RLISLE 'V/l='l'13L7DL/C"T r.. Safety Data Sheet Material Name: CCW WIP 300HT SDS ID: CARL-072 Section 1 - PRODUCT AND COMPANY IDENTIFICATION Material Name Phone Numbers: CCW WIP 300HT Synonyms Medical Emergency Rubberized asphalt self-adhering sheet with CHEMTREC(USA): 800-424-9300 polyethylene film Chemical Family MSDS Assistance; 972-442-6545 Rubber Asphalt products Technical Assistance: 888-229-2199 Product Use Customer Service: 888-229-0199 waterproofing membrane Restrictions on Use For industrial use only. Manufacturer Information Carlisle Coatings and Waterproofing Incorporated 900 Hensley Lane Wylie,TX 75098 www.carlisle-ccw.com Section 2 - HAZARDS IDENTIFICATION Classification in accordance with paragraph(d)of 29 CFR 1910.1200. Skin Corrosion/Irritation-Category 2 Reproductive Toxicity-Category 1B Specific Target Organ Toxicity-Single Exposure-Category 2(liver,kidneys, thymus) GHS Label Elements Symbol(s) 4/1110> Signal Word Danger Hazard Statement(s) Causes skin irritation May damage fertility or the unborn child May cause damage to organs �F 4 '`i , Page 1 of 13 Issue date: 2016-03-07 Revision 1.1 Print date: 2016-03-08 04/13/2018 ASPEN BUILDING DEPARTMENT C4RLI SLE W/P PJ70DUCTS Safety Data Sheet Material Name: CCW WIP 300HT SDS ID: CARL-072 Precautionary Statement(s) Prevention Obtain special instructions before use Do not handle until all safety precautions have been read and understood Wear protective gloves/protective clothing/eye protection/face protection Do not breathe dust/fume/gas/mist/vapours/spray Wash thoroughly after handling Do not eat,drink or smoke when using this product Response If exposed or concerned:Call a POISON CENTER or doctor/physician IF ON SKIN:Wash with plenty of soap and water If skin irritation occurs: Get medical advice/attention Take off contaminated clothing and wash before reuse Specific treatment(see label) Storage Store locked up Disposal Dispose of contents/container in accordance with local/regional/national/international regulations Other Hazards No additional information available. Section 3 -COMPOSITION /INFORMATION ON INGREDIENTS CAS Component Name Percent 64742 52 5 Distillates,petroleum,hydrotreated 1-5 heavy naphthenic r8052-42-4 Asphalt 10-80 64742-93-4 Asphalt,oxidized 0-80 r _ Distillates,petroleum,petroleum 68955 27 1 residues vacuum 0-80 64741-56-6 Residues petroleum,vacuum 0-80 Mixture Fatty acids,tall-oil,low-boiling 1-5 RECEIVED Page 2 of 13 Issue date: 2016-03-07 Revision 1.1 Print date: 2 16-03-08 04/13/2018 ASPEN BUILDING DEPARTMENT DA INCI Roofs�aPe= DaVinci Shake Multi-Width Shake • Single-Width Shake INSTALLATION GUIDE DaVinci polymer shakes are carefully engineered to provide the authentic look of hand-split shakes with dramatically increased durability and resistance to fire and impact. Special care has been taken to make the product easy to install. By following these instructions, and using good installation practices,you will be assured a quality installation. NOTE TO INSTALLER r DaVinci Shake offers a 5/8"thick profile,yet remains lightweight,because the shakes have an engineered rib structure.When cutting shakes for • valleys or at overhangs such as eaves and gable ends,the ribbed /'/ support structure on the underside of the shake needs to be / - -- hidden by standard metal flashings. In addition,DaVinci offers a 12" solid accessory tile that can be used in these areas and would not require the need for special flashing. Pay special attention to recommendations ,' for accessories and installation at eaves(page 2), gable ends(page 4)and valleys(page 7). JOB SITE READY! DaVinci shake bundles are delivered to the construction site pre-collated with shingle widths and color variations in the ordered blend.This pre-planned distribution produces the right aesthetic effect every time. Collated bundles also simplify installation and save time by eliminating hand sorting on the job site. Multi-Width Shake Widths: 9'8,7",6,4" Length:22" Thickness at butt:5/8" Single-Width Shake Widths:9" Length:22" Thickness at butt: 5/8" This information is provided for the use of professional roofing contractors.This Installation Guide does not supersede local building codes which should always be followed.DaVinci Roofscapes®does not warranty or have any responsibility for installation of its products.The DaVinci Roofscapes Lifetime Limited Material Warranty outlines its warranty responsibilities for the roofing materials it manufac e For questions about DaVinci Shake or its application, P contact DaVinci Roofsca es®,LLC vED 913-599-0766 or 800-DaVinci(800-328-4624)or www.davinciroofscapes.com 0 4/13/2 018 Please be sure to check Da l'inci's website for updates.Installation Guide is subject to change without notice. 1 OPE N MLIGSH-01/18 Pg. BUILDING DEPARTMENT INSTALLATION Decking Distance from butt-line Felt Interlay DECKING to felt is equal to twice the shingle exposure DaVinci Shake must be installed on a smooth flat surface 1 ood or Shingle Yam' OSB •)� exposure _ minimum 15/32"APA approvedplywood .j' r pp or 7/16"approved OSB.It is necessary - ;w•-•, that all previous roofing materials be removed prior to installation of DaVinci ' Shake.Imperfections in the decking may transmit through to finished roof. DRIP-EDGE Metal flashing is required on gable ends and eaves.An overhanging drip / edge is recommended on gable ends to help mask the rib structure on ,/'," the underside.An overhanging drip edge may also be used on eaves ..- 11, " -'' although non-overhanging drip edge styles are acceptable options. 1110 �. Style D or Self-Adhered SELF-ADHERED MEMBRANE StyleFDripEdge I Membrane (Severe Climate Underlayment in accordance with Chapter 15 of the UBC) can be used l Starter Course In areas where the average daily temperature in January is 25°F or lower or where ice buildup is possible,DaVinci requires self-adhered membrane be installed: from the bottom edge extending two feet above the exterior wall line on all eaves.The self-adhered membrane is required in all valleys regardless of average daily temperatures or the possibility of ice buildup. UNDERLAYMENT AND INTERLAYMENT Method 1: Class A installation One layer of GAF VersaShield®Fire—Resistant Roof Deck Protection(ESR-2053)in addition to required self-adhered membrane. Method 2: Class A Installation One layer Fontana VulcaSeal G40 in addition to required self-adhered membrane(This system is not recognized by ICC-ES). Method 3: Class C Installation The entire roof must be covered with an approved underlayment in addition required self-adhered membrane. Pitches below 6:12—DaVinci Shake should be installed with 30 lb felt interlay.Felt interlay is installed by rolling out 18" wide rolls of 30 lb felt at the same exposure as the shakes.The felt should be applied over the top portion of the shakes and extend onto the plywood sheathing so that the bottom edge of the felt is positioned at a distance above the butt equal to twice the weather exposure. So for an exposure of 10",start the layer of felt 20"above the butt line of the course below.If a class A installation is required the felt interlay must be used in addition to the other required underlayments.An alternative to using felt interlay is to use two layers of approved underlayment with their laps offset.If class A is required one of these layers may be GAF VersaShield or Fontana VulcaSeal G40. Note 1:Underlayment and Asphalt Shingles are listed Class A components of a listed roof deck assembly by an Approved Agency.The third party program in which products are certified,early a label,and are listed in the directory of an agency accredited by the International Accreditation Service,Inc.(IAS),or by an accredited body that is a partner with IAS in a mutual recognition arrangement,pertaining to certification bodies and their compliance with ISO/IEC Guide 65,General Requirements for Bodies Operating Product Certification Systems. These underlayment and asphalt shingle components are to meet Class A Classification when tested to ASTM E108 or UL 790. Note 2:Underlayment and Asphalt Shingle components are to be installed with mechanical fasteners in accordance with the manufacturer's pub- lished installation instructions.Self-adhering or adhesive applied underlayment and asphalt shingle installations are outside the scope of this listing. FASTENERS Tiles should be installed with nails long enough that they will penetrate through the roof deck by at least 3/16". In most instances, 1 3/4"roofing nails are acceptable.We recommend copper,stainless steel,or hot-dipped galvanized nails. Ring-shank nails should be used in high wind areas. STARTER COURSE Each starter tile should be installed so that it extendspast the dripedge byapproximately 1".If usingoverhanging dripedge,the g hp Y g t g iWE V starter shingle may overhang less if it is appropriate for the gutter system.The starter tiles should be installed with t�gVytc�, logo on top. The starter tiles should be spaced 3/8"apart as tiles will expand when warm.Each starter tile should be nailed with two approved nails on a line approximately 6"from the butt and 3/4"from outside edge. 0 4/13/2 018 MLIGSH-01/18 Pg.2 of IOSPEN 9(1ILDING DEPARTMENT INSTALLATION GETTING STARTED Use approved nails in each shake at or near nailing location shown on the shakes(see page 10).Nails may be placed lower than the indicators as long as the tile above it covers the nail.Once the starter tiles are in place,begin installing shakes in the lower left corner(or lower right corner for a left-handed roofer).The shakes should be flush with the starter tiles on the outer(rakes) and lower(eaves)edges.DaVinci recommends a minimum 3/8"gap between shakes. Two methods of installation are available: 1. Straight: in which the exposure of each shake is kept consistent 2. Staggered:in which the exposure varies by a maximum of 1"on adjacent shakes Use the alignment indicator at the top of each shake to help manage the exposure.An exposure of between 9"or 10" is acceptable for straight courses and 9"for staggered courses.As you progress up the roof,be careful not to damage shakes a ready in place.Put something,perhaps a piece of cardboard or cut shake,under toe irons(scaffolding brackets)to avoid scratching or marring the shake already installed below. STRAIGHT COURSING Install the shakes one at a time starting in the lower left hand Straight Coursing on DaVinci Shake at a 10" Exposure corner if right handed or lower right hand corner if left 1e handed.The first course of shakes should be laid directly on 42" the starter tiles with the butt of the shake flush with the butt Nail Id holes of the starter tile.The shakes should be installed individually • with two nails in or near the defined areas.The shakes should 32„ be laid individually with a rack type system, also known as rack-style, stair-stepping,or pyramiding;to prevent same size ny shake directly on top of another.The shakes should be laid ge with an approximate 3/8"gap between each shake.The gaps — — — — — — — — — —22" between shakes on adjacent courses should offset by a minimum 1%2".To assure proper horizontal alignment we recommend that chalk lines be snapped frequently.These chalk e • lines should be placed on the underlayments so that the shakes _ th are aligned by the tips of the tiles rather than the butts. 1� Chalk lines should be snapped on underlayment with the tips of 3/8''Gap between each shingle the shakes following the lines.Do not snap lines on DaVinci Shake or use red chalk as the chalk may permanently discolor the shake. Staggered Coursing on DaVinci Shake at a 9" Exposure STAGGERED COURSING Staggering the courses is accomplished by laying the shakes — — _ — s 40" Nail in 9" courses with every other shingle lowered 1". holes An example of how to accomplish this is as follows: ./ \ Step 1: Lay the first course of shakes flush on top of the starter.Then snap a horizontal line 9"above the tips of the shakes you just installed or 31" from the eave line(butt of the shake you just laid). Step 2: The first shake on second course should be 9" installed putting the tip of the shake on the chalk line.The next or adjacent shake should be 1"below the line.The ly es third shake should be on the line;the fourth shake should i be below the line.This continues in the same pattern all 11 9,, the way across the roof one shingle tip on the line and twee Gap between each JI. the next 1"below the line. shingle 04/13/2018 MLIGSH-01/18 Pg.3 of 10 ASPEN BUILDING DEPARTMENT INSTALLATION ONE-PIECE HIP AND RIDGE APPLICATION: HIP AND RIDGE PREPARATION DaVinci one-piece hip and ridge shakes have an optimum appearance when used on pitches of 12:12 or less. Steeper pitches may cause outside edge to lift and it is recommended the conventional two-piece hip and ridge method be used for pitches greater than 12:12.Roofing nails that penetrate through the roof deck and exceed it by 3/16"should be used. RIDGE VENT APPLICATION If using a continuous ridge vent we recommend a rigid shingle roll-over type. Once the continuous vent is installed, prepackaged 12"DaVinci One-Piece Hip and Ridge shingles should be installed in accordance with the standard hip and ridge installation instructions below. Special caution should be used when cutting the decking on the ridge to assure adequate nailing for the ridge pieces. DAVINCI ONE-PIECE HIP AND RIDGE SHINGLE INSTALLATION • DaVinci Shake one-piece hip and ridge should be installed at a 10" exposure with two roofing nails in each piece. • A pair of 6"shakes should be used as a starter course underneath the first piece of hip and ridge.These 6"tiles should be cut so that they are approximately 5"widths and they should also be cut in length so that they don't extend beyond the top of the second course of field tiles.If preferred on the bottom of a hip the two 6"DaVinci Shakes may be placed upside down so that the rib structure on the underside is not visible. • When installing the hip and ridge attempt to nail in areas where the underneath shakes offer support.It is not necessary to nail precisely in the nailing circles. This is especially important on hips.Roofing nails that penetrate through the roof deck by 3/16"should be used. / • w. _ Illi opop,,, ..,:i7n,_, ....t.z.i. iitt_ ,.. ' : L 12"DaVinci Shake RECEIVE 10"exposure One-Piece Hip and Ridge 04/13/2018 MLIGSH-01/18 Pg.5 of WSPEN BUILDING DEPARTMENT INSTALLATION TWO-PIECE HIP AND RIDGE APPLICATION: HIP AND RIDGE PREPARATION After installing field shakes,hips and ridges should be prepared by installing a minimum 6"wide piece of non-corrosive metal,UV stable EPDM or equivalent over the hips and ridges.This metal or EPDM should extend at least three inches from the center point on each side of the hip or ridge. RIDGE VENT APPLICATION If using a continuous ridge vent we recommend a rigid shingle roll-over type.When installing continuous ridge vent,care should be taken to insure joints in ridge vent are water tight. Once the continuous vent is installed,prepackaged 6"DaVinci hip and ridge shakes should be installed in accordance with the standard hip and ridge installation instructions below. Caution should be used when cutting the decking on the ridge to assure adequate nailing for the ridge pieces.Roofing nails that penetrate through the roof deck and exceed it by 3/16" should be used. TWO-PIECE HIP AND RIDGE SHINGLE APPLICATION The bottom piece of hip and ridge should be cut so the tip does not extend past the butt of the second course. If preferred on the bottom of a hip,two 6"DaVinci Shake cut 5"wide placed upside down can be used as an under course.This will prevent the rib structure from being seen on the underside. These shakes that make up a hip and ridge unit should be installed with a ten-inch exposure.Using a chalk line to assure straightness,the prepackaged 6"hip and ridge should be installed one piece at a time so that the butts of two shingles are adjacent and the inside edges touch. Non-corrosive metal \r''''''N..si ,. '. • fr t r . ,4 1 . . _ _ .. N------N„, . . . . ____,,,..„- fit 4„„,„ .,.... ,_ ........ s 10"exposure 6"DaVinci Shakes RECEIVE[ 04/13/2018 MLIGSH-01/18 Pg.6 of1FLN BUILDING DEPARTMENT INSTALLATION VALLEYS Because DaVinci Shake has a rib-structure on the underside*,care must be used when installing DaVinci Shake in valleys. Open or closed valley systems may be used with variants of each system.Whether installing an open or a closed valley system, valley metal should be made from 24"stock of copper,minimum.019 aluminum,or minimum 28-gauge clad steel.DaVinci requires self-adhered membrane be used in all valleys. *A 12" solid shake accessory tile is available. OPEN VALLEYS If open valleys are preferred,be aware that the cut edge of the tile may be seen.Location of the valley,roof pitch and height of roof should be considered in determining if the cut tiles will have an acceptable appearance. Option A: In many cases,with steeper pitched roofs,it is acceptable to Option A install a"W"valley and cut the DaVinci Shake on an angle parallel and Single Diverter Valley Metal 2'/z'from the center diverter.Keep in mind that the cut rib structure of the I V," shakes may be visible from the ground with some roof pitches. DaVinci offers 12"solid tiles if the rib structure or open area under DaVinci to'h" shakes is a concern. Option B Option B: Double"W"valley.This should be made from 24"stock that Twin Diverter Valley Metal is broken in the middle without diverter to look like a"V".Additionally, there should be a"W"(diverter)on either side 21/2"from the center line. 11/4" (See Diagram)DaVinci Shake should be cut and laid against the diverters on either side to mask the rib structure. lo° Valley metal(Option A or B) Valley metal broken from 24"stock. The top corner of the shake closest to ! Self adhered membrane is required in all valleys. the center of the valley should be cut off at a 45°angle. r Use wider shakes adjacent to valley where possible. Nail as far from center as '" “'={ practical.Try to not nail %= • 3 closer than 5"from center t RECEIVED 04/13/2018 MLIGSH-01/18 Pg.7°fit P N BUILDING DEPARTMENT INSTALLATION CLOSED VALLEYS A closed valley can be achieved by using valley metal option(A or B).In our preferred method,option A,valley metal with a single,narrow-based diverter in the middle is used and the DaVinci Shakes are cut and butted to the diverter.An alternate is to use standard"W"valley with the shakes butted against the diverter.Wider shakes should be used as valley cuts in order to ensure that nailing be kept at least 5"from center or as far from center as possible. Option A Option A: Install valley with a standing seam in the middle and Standing Seam Valley Metal place already-cut DaVinci Shake against center standing seam. Option B: It is acceptable to install a"W"valley and place an Option B all ready-cut DaVinci Shake against center diverter. Metal should be Single Diverter Valley Metal broken with a diverter at least 1%a"tall. low Valley metal broken from 24"stock. Valley metal(Option A or B) The top corner of the shake closest to 1 - Self-adhered membrane is offthe at center of the valley should be cut required in all valleys. at a 45°angle. Use wider shakes adjacent to valley where possible. Nail as far from center as �fi n- practical.Try to not nail closer than 5"from center. 4. M RECEIVED 04/13/2018 MLIGSH-01/18 Pg.8 ofAtPEN BUILDING DEPARTMENT SPECIAL ISSUES FLASHING era . _____ _Y'.--�,r 1 Y' / Fold down Flashing should be used in all areas - _ . counter flashing where the roof abuts a vertical wall, wg-- y. over step flashing. dormer,chimney,skylight or other A structural protrusions. Fasten flashing Use the step flashing method,with ----r.,.._.A _i ,i , 1 to roof. copper,a minimum of 28-gauge clad v i . _ - Succeeding steel,or a minimum .019 aluminum Z.- flashing pieces flashing.The flashing should extend 14'long with 4 4"overlap. 4"upvertical walls. Counter _ First piece of Flashing flashing is 14" Apron _- Flashing mil! "'� Minimum Lengths VENTILATION In some climatic regions of the country,proper ta° ventilation is crucial to the performance of a roofing a" system.Proper ventilation is especially important / in cold climates where modem houses are well � 4" insulated and weather-tight.We suggest you follow 4 standard building practices in your area and meet all national and local building codes.A continuous ridge vent combined with proper intake or eave ventilation is an especially effective ventilation system,and one that we highly recommend. Continuous Vent SNOW GUARDS One square foot of aft. vent for every 300 Snow guards should be considered in all geographic �'m' _ square feet of attic. areas where accumulating snow fall is possible. , Most kinds of brass,copper,or clad aluminum , snow guard systems work well with DaVinci. Rocky Mountain Snow Guards,Inc.is good source .1 \ for further information about snow guards. Contact ,' � �4 them at www.rockymountainsnowguards.com �l,' � jr { = `'yA , or call 877-414-7606.It is recommended that snow "� -4 guards be installed during the installation of the s---i f`/ + LL DaVinci roof although retro-fit snow guards are ' / - available for previously installed DaVinci roofs. Details regarding installation remain the . • ;' responsibility of the installer and the customer. - -- soffit vets For additional information please see Q&A Guide to Snow Guards at http://dvroof.com/lBEYN1W. Consult with your local contractor to determine if snow guards would be appropriate for your projRE C E IVE DaVinci makes no representations or warranties about the propriety of snow guard installation on any given project.Rather, the decision to install snow guards rests solely with the end user. 0 4/13/2 018 MLIGSH-01/18 Pg.9of N...— (t, BUILDING DEPARTMENT PRODUCT FEATURES EXPOSURE ROOF PITCH COURSING INTERLAY MAX.EXPOSURE Exposur- Less than 3:12 Not Recommended �4�y, °"'`'°'' less than 6:12 Staggered Required* 9" less than 6:12 Straight Required* 10" 6:12 or greater Staggered Recommended 9" ' 1 6:12 or greater Straight Recommended 10" t r _ _t; `- Felt interlay is suggested on any pitch and required on pitches less than 6"in 12'.' '' ` t *If two layers of Fontana VulcaSeal is used interlay is not required. r: N• wr. .N, • a • NAILING E Each shake should be applied with two copper,non-corrosive stainless steel, i i or hot-dipped galvanized, 3/8"head x 11/4" length nails in most instances. F: Roofing nails that penetrate through the roof deck and exceed it by 3/16" should be used. Shakes can be nailed by hand or with a pneumatic nail gun. Don't overdrive nails or drive nails at an angle. Keep the nail head flush with ' ; the surface of the shingle to avoid creating`craters"which can collect moisture ' ` 1 and can also prevent the exposed end of the shingles from laying flat. 1 • Use these alignment r g guides with the top edge of the previous row of shakes t,I to control the exposure. 0 . CUTTING DaVinci Shake can be cut with a utility knife and straight edge. QUICK REFERENCE Electrical circular saws (carbide blade,two teeth per inch)or cordless circular saws(a minimum of 18 volts is recommended) • Don't overdrive or install nails at an angle may also be used. • Always leave a gap between all tiles Please note: DaVinci Shake is made flat,should be stored flat and • Vertical,always install up the roof not one row must not be installed unless it is flat and in its original form. If shakes across the roof at a time are not stored flat and become twisted or curled, lay them flat in a • Install over a clean plywood deck only warm place and they will return to their original flatness. Damaged • Never use red chalk shake should never be installed. • Cut edges always go to the inside along rake edges or gable ends ELECTRO-GALVINIZED NAILS • Install snowguards in any snow prone area DaVinci recommends the use of copper,stainless steel,or hot-dipped galvanized nails.We realize however that in many ISSUE DAVINCI ACCEPTABLE climatic regions nail corrosion is not a factor in the long-term RECOMMENDS ALTERNATIVES performance of the roof system. Therefore DaVinci Roofscapes Valley Copper 28-gauge clad metal supports the use of Electro-galvanized nails and a system using Flashing Copper 28-gauge clad metal those nails will be in compliance with the DaVinci Lifetime Limited Material Warranty. The exception to that is that if the Eaves Flashing Copper 28-gauge clad metal nails fail,any portion of the warranty associated with wind Nails Non-Corrosive Hot-dipped performance would be void. Stainless Steel Galvanized For questions about DaVinci Shake or its application,contact DaVinci Roofscapes®,LLC REC I E D 913-599-0766 or 800-DaVinci(800-328-4624)or www.davinciroofscapes.com Please be sure to check DaVinci'.s website for updates.Installation Guide is subject to change without notice. 0 4/13/2 018 MLIGSH-01/18 Pg.10of ,Lk, BUILDING DEPARTMENT 4/5/2018 Multi-Width Shake Roof I Shake Products I DaVinci Roofscapes • Class A fire rating (ASTM E 108) • Miami Dade Code Approval • 110 MPH Wind resistance (ASTM • ICC-ES (ESR-2119) D 3161) • Texas Department of Insurance • Class 4 impact resistance (UL approved 2218) • Lifetime Limited Material Warranty DaVinci Roofscapes' Polymer Roof Tiles...!he Art and Science of Lasting Beauty PRODUCTS Copyright©2018 DaVinci Roofscapes, LLC MEDIA 13890 W. 101st Street, Lenexa, KS 66215 CONTACT 800-328-4624 SLOG WARRANTY PRIVACY POLICY VIEW FULL SITE RECEIVEb 04/13/2018 . https://www.davinciroofscapes.com/products/shake/multi-width-davinci/ ASPEN BUILDING DEPJ TMENT 4/5/2018 Multi-Width Shake Roof I Shake Products I DaVinci Roofscapes ABOUT MEDIA INQUIRIES SEARCH HOME PRODUCTS PROFESSIONAL TOOLBOX HOMEOWNER TOOLBOX COLOR & INSPIRATION GALLERY CONTACT ABOUT MEDIA Products Shake Multi-Width Shake AVAILABLE FEATURES MAINTENANCE & SAFETY& COLORS OVERVIEW INSTALLATION WARRANTY Multi-Wi dt h Shake Safety and Warranty DaVinci Shake, multi-width composite roofing tiles have achieved the hilaast possible test ratings for fire, wind and impact and have been approved •.AEI V�/ E preferred by cities and subdivisions nationwide. This gives you a more se64n3/2018 home for your family. https://www.davinciroofscapes.com/products/shake/multi-width-davinci/ ASPEN BUILDING DEPARTMENT