HomeMy WebLinkAboutFile Documents.311 Park Ave.0178.2019 (4).ARBK PERMIT NUMBER: 017 8 . 2 019 .ARBK MASTER PERMIT: 0 319 . 2 017 .ARBK DATE:
COMMUNITY DEVELOPMENT DEPARTMENT _
BUILDING PERMIT APPLICATION THE CITYOFASPEN
PROPERTY INFORMATION
Call Assessor(970.920-5160)to verify
ADDRESS 311 Park Ave. Aspen,CO 81611 UNIT# PARCEL ID# 273718100049
LOT OR M EEED:-Lot PA PhD:-LOtB520FTC Block 1 TRACT Riverside Addition F
BLOCK OR SUBDIVISION
DESCRIPTION OF
The change order includes window replacement and additions,revised interior framing layouts on the Lower,Main,and Upper Levels,and addition of a fireplace in the Master Bedroom.
WORK IN DETAIL
Demolition and FAR Calculations have been revised based on new fenestration and decreased garage area.
BEST CONTACT Ryan Lee CELL 405-314-5104 EMAIL Rlee@forumphi.com
NAME
OWNER NAME 311 Park Ave LLC CELL 970-319-8253 EMAIL fcplp@yahoo.com
PROJECT DETAILS
PROJECT VALUATION 1,000,000 Use of Building Class of Work Fixture Counts Equipment Checklist
❑ Commerical 0 New 0 Toilets,Bidets Forced Air/Gravity Systems
SQ FT OFBathtub WORK AREA 0 Multi-Family ❑ Addition -o—Lavatory y✓all,Suspended,or Unit Heaters
❑p Single Family ❑ Alteration Gas Log
,459.25 Existing GrossKhower
3
UNITSQFT 0 Mixed-Use 0Repair —� itchen Sink(+Disposal) Gas Appliancew
LOT SIZE ❑ 0 IFFR — Dishwasher Appliance Vents
(Set FT) 3,473.75 Gross Lot Area 0 Tenant Finish I Laundry Bar,Utility Sink Heat,Refrig,Cooling,or
SQFTOFLAND-
� Will there be 0 Demolition -1—Clothes Washer Absorption Unit
SCAPE WORK any roof/wall ❑■ Change Order Floor Sink Boilers(includes vent)
penetrations? 0 Floor Drain Air Handling Unit
NEW SQ FT 3,599 Proposed Gross ❑ Yes Shower Cooling Systems
No NOTICE: This permit becomes null and
T—Water Heater(Pan Req) Ventilation Fans
❑ #Gas Outlets
SQ FT OF ROOMS void if work or construction authorized Range Hood
WITH UTILITY WORK is not commenced within 180 days,or Water Treatment
if construction or work is suspended or Other #of Gas System Outlets
abandoned for a period of 180 days at U Snowmelt System Sq Ft
any time after work is commenced.
Details Term Definitions
Project Valuation:Cost of project as defined in Valuation Affadavit.
Sq Ft of Work Area:Total square footage of area undergoing change or reconfiguration.
Unit Sq Ft:Gross Square Footage,not FAR,of permitted unit. APPROVALS X LL 7/15/1 9
Lot Size:Total surveyed square footage of property. PC
Sq Ft of Landscape Work:Square footage of disturbed exterior area. Reviewing Review Reviewer Date
New Sq Ft:Total added square footage for additions to net livable or net leasble space. Department Required Initials Approved
S. Ft of Rooms with Utilit Work:Total square footage not FAR of all rooms with •lumbin:work, Zoning X JP 10/1 /1 9
FOR CITY USE ONLY
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES HPC
Plan Check Permit Fee 2 5 • U U Parks Impact Building X JH 9/11/1;
Energy Code REMP School Ded. Fire
Zoning(50%) Plan Check 650.00
2 TDM Impact Engineering
(Hourly) CMP
Engineering Review Zoning(Hourly) 2 6 0 0 . 0 0 Ped.Amenity
CMP(50%) Engineering Housing Cash in Lieu Utilities
(Hourly) Water
Parks Review Zoning(50%) Stormwater Stormwater
Utility Review CMP(50%) City Use Tax Sanitation
Other Electrical County Use Tax Env. Health
Plumbing GIS
Mechanical Sanitation Parks
RIB 1', ' Land
� Efficiencyscape
92o,�n/ tXrict roved
o Issue
Cens EL Issuance
PLANS LOCATION '" 8 15OMME GT
CITY OF ASPEN August 2017 130 S. GALENA ST I ASPEN, CO 8161j
PERMIT NUMBER: ADDRESS:
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET THE CITY OF ASPEN
FOR PLAN REVIEW QUESTIONS
Name Phone E-mail
FOR INSPECTION QUESTIONS
Name Phone E-mail
OWNER
Name 311 Park Ave LLC IN CARE OF RICHARD FULLERTON phone 970-319-8253 Cell Phone
Mailing 2047 Fillmore St. San Francisco State CA ZIP 94123
Address City
E-mail fcplp@yahoo.com
Address
OWNER'S AUTHORIZED AGENT
Name Phone Cell Phone
Mailing State ZIP
Address City
E-mail
Address
APPLICATION BEST CONTACT
Name Ryan Lee Phone Cell Phone 405-314-5104
Mailing 715 W. Main St. Ste 204
Address City Aspen State CO ZIP 81611
E-mail Address rlee@forumphi.com
ARCHITECT OR DESIGNER OF RECORD
Name
Steev Wilson Phone Cell Phone 970-279-4109
Mailing Address 715 W. Main St. Ste 204 city Aspen State CO ZIP State
E-mail swilson@forumphi.com
Address
CIVIL ENGINEER OF RECORD
Name Phone Cell Phone
Mailing
Address City State ZIP
E-m
Address
STRUCTUAL ENGINEER OF RECORD
Name Steve Edmiston-Evolve Structural Phone 970-510-0773 Cell Phone
Mailing 1040 Main Street Carbondale State CO ZIP 81623
Address City
E-mail steve@evolvestruct.com
Address
GENERAL CONTRACTOR
Name Koru LTD contact: Mike Simpson ' Phone 970-963-0577 Cell Phone 970-379-5580
Mailing Address2551 Dolores Way City Carbondale State CO ZIP 81623
E-mail mikesimpson@korultd.com
Address
INSPECTIONS: The General Contractor must schedule inspections online.
Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so.
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
of construction. It' m ,responsibility to review the approved plans and any comments that are contained thereon and see that the
structure am it pr ect is built in compliance with all applicable codes.
Contractor I, ; Date —1 . 't L
Signature
Check if you area tested owner builder(single-familyhomes only).You must take a test and complete the owner/building a Y p MVED
(CITY USE ONLY)Owner builder approved by: Date: Affidavit on file
( CITY OF ASPENAugust2o17 130 S. GALENA ST I ASPEN, CC2cPAQjll)-9
ASPEN
BUILDING DEPARTMENT