HomeMy WebLinkAboutFile Documents.610 S West End St.0037.2018 (10).ARBK 0037.2018.ARBK.BuildingCommentl
ASBESTOS.pdf(1)
Subject: PlanCheck
' = Page Label:9 ✓ Asbestos abatement is required
µ per this report. The building
Author:justinh
File Name ASBESTOS.pdf department cannot sign off on
® V this permit until that abatement
`="== has taken place and a
: - .., y ,-; post-abatement clean air report
E�— v - has been submitted.
plans.pdf(7)
--- Subject: PlanCheck
L Page Label:A-101�XISTING AND PROPOSED PLANS When submitting a scan of your
'-R" ' Author:justinh plan, please scan it in a high
When subml6rg a scan of y per. �... File Name: plans.pdf enough resolution so that I can
phase scan d-nahianugh resolution read your dimensions.
so that 1 can read your dimeisions.
Currently,any of the dimensions and Currently, many of the
roes are iegibla-When you resubmit
revisions please he sure tlral al notes �� dimensions and notes are
and dimensions are legble.
illegible. When you resubmit
revisions please be sure that all
notes and dimensions are
legible.
—g, Subject: PlanCheck
-- Page Label:A-101 EXISTING AND PROPOSED PLANS The permit application mentions
—� - Author:justinh ✓ new flooring. Submit a spec on
Y Y Yv YY Y r File Name: plans.pdf an underlayment product that
The Permit appficafion rrors rrew o-� will achieve and IIC rating of 50
gooritg.Submit a spec m an
undedayment product that will or greater if you have another
achieve and tf ri 91 unit below you.
•
,_ I•)ect: PlanCheck
Page Label:A-101 EXISTING AND PROPOSED PLANS I am -• . hard time reading
a...r— Author:justinh your hearth exte
File Name: plans.pdf dimensions, but it does
_. appear that they meet the
�� requirements dimensional
_ M s . ,V% iG
.�. � = requirements of IBC 2111.11.
"ram Clearly show that your new
�� '__. r , /(/1� hearth extension complies with
/">14// these size requirements.Also
detail the structure under this
new hearth extension as it mus
be supported by
non-combustible ma - .-s per
IBC2111.10
r—. _ Subject: 'an - -
Page Label:A-101 EXISTING AND PROPOSED PLANS Call out the new height of the
CM°e�eow height of = i / stair riser. If you are combining
sort sort/bang If v Author:justinh V
�� j O/V
cue .near. a. �,%, /Y
a„,us, Ocorn wrl two steps into one it must still
„,e,�,;�, of File Name: plans.pdf
iV
s, , comply with the max riser height
_ =_= ✓ ft "
of a stairway which is 7-3/4,r
04/11/2018
ASPEN
BUILDING DEPARTMENT
4
Subject: PlanCheck
Provide structural verification
Page Label:A-101 EXISTING AND PROPOSED P
NS
.d.�..a Author:justinh �/ that the walls being demolished
." ` File Name: plans.pdf P4
and the new proposed walls will
- not negatively affect the
_ building's structure. This can be
i / a stamped letter from an
0
ice, ,' ? p
[1�- 3 --; e = architect or engineer. The
- structural letter currently
submitted only makes mention of
the new window header.
.---+ Subject: PlanCheck
Identify demising walls and note
Page Label:A-101 EXISTING AND PROPOSED PLANS
r '' Author:justinh if you have other units
.._ _ File Name: plans.pdf , /� above/below yours. If you are
• �, lea W�aiedse�,,,a�� disturbing more than 32 SF of
puv lima ae¢aem.a¢ee don 325Fal
''�,alsmas.epednal along wry.�wa.a1ka.caing ^ drywall(one 8'x4'sheet)along
any demising wall or ceiling that
�- — separates units a listed/tested
assembly with a 1 hour fire
kL rating and STC of 50 or greater
- -- will be required.
- Subject: PlanCheck
Page Label: E-101 RCP / / This is a type VA building and all
I°__; Author:justinh 'V floor/ceiling assemblies have a
m ¢Ili is harrow ei.e VA ge,tl ¢xeimi File Name: plans.pdf 1 hour fire rating. If you are
a,mniies have a,Ear lie Mag.i,w are _ , proposing any recessed lighting
proposing my massed ipting Ocalves V..
^earated Gang Men e hour��i fixtures that will penetrate into a
I¢d MEe rewind b E¢recessed*Wes Rome
,refit whether*,nd Ms¢Edna neveeei(as be 4
Pan does.it.*types of fe¢eee)a,ei rated ceiling then 1 hour fire
V11..6eabet a a¢Ieatan e¢REee®t be Et
rated hats will be required for the
recessed fixtures. Please verify
whether or not this is being
proposed (as the plan does not
identify types of fixtures)and if
applicable submit a cutsheet on
the proposed fire hat.
1._ �DI 4
04/11/2018
ASPEN
BUILDING DEPARTMENT