Loading...
HomeMy WebLinkAboutFile Documents.110 Coach Rd.0079.2018.ARBK Aspen Development Services Memo To: Bob Narracci, From: ASPEN DEVELOPMENT SERVICES, LLC CLAUDE SALTER 210 S Galena Street, Suite 31 Aspen, CO 81611 970-309-7955 Aspendevelopmentservices(a�gmail.com cc: Date: 01.07.2019 Re: 110 Coach Road permit 0079.2018.ARBK Subdivision: Stage Road PD Lot: 7 Parcel Number: 273502303007 ZONE DISTRICT:AH/PD New SFR Documents used for review include but are not limited to: Ordinance No. 6, Series of 2005 Supplement to the Final Plat of Stage Road PD, Book 92 P1 Plat, reception#563657 Insubstantial PD Amendment August 10, 2010, reception#584100 Insubstantial PD Amendment September with regard to crawls space and terraces 23, 2013 Insubstantial PD Amendment Building Envelope, reception#645286 Zone 4 Architects, LLC comments/responses in blue. *Per our 01/09/2018 meeting (Z4A+Claude Salter), Z4A has addressed the items that Claude felt still required a response: #4,#6 (&#9),#8, and#11. Z4A has also provided updated information on items that were addressed during the meeting for CoA reference. 1. Sheet A200a FAR: Please add grid lines and explain the loggia at deck 523.50 vs roof overhang A202 Sheet A200a now includes grid lines for your review. *Please reference Jen Phalen's email dated 05/19/2016 in regards to the loggia question below the cantilevered office. RECEIVED 02/14/2019 ASPEN BUILDING DEPARTMENT 2. RDS not applied to development in the PD Required Approval of Design Review Board for PD prior to permit issuance: please provide the letter and the accompanying plans (at a minimum FA sheets, height, site plan) which were approved by the Design Review Board for Stage Road/ Bar-X PD. Documents provided by Zone Architects from the original Double Bar X Architectural Control Committee (ACC) review/approval (located in "Original ACC Approval"folder) and the revised review/approval (ADU transition to Detached Guest Quarters located in the"Revised ACC Approval" folder) have been provided. The RDS exemption form has also been included. 3. Sheet A103a Site Section (4) and sheet A103b: Maroon Creek View plane: viewpoint from the canyon shall be represented at a 6' height. See First Supplement to the Final Plat of Stage Road PD, Book 92 P1 Plat, reception#563657, sheet 14 Work with architect to verify the 6' height requirement. Insubstantial PD Amendment August 10, 2010, reception#584100, section 6:View planes, review in conjunction with architect.This document requires a surveyor to analysis and establish the view plane.And to have a surveyor or engineer provide verification. A 6' dimension has been added to section 01/A103a where the view line/plane initiates at the PUD Boundary. The additional two elevations that determine the view line/plane angel at Lot 7 (found at sheet 14 of the First Supplement to the Final Plat) have been highlighted for clarity. 4. Maroon Creek View plane PUD Control Document, Development and Vested Rights Agreement, reception#515890 1.C.5 Free Market Lots. Maroon Creek Viewplane Construction on the free market lots shall not impact the"Maroon Creek Viewplane' as depicted on Exhibit B The purpose of the Maroon Creek Viewplane is to ensure that no rooms, decks, or %ghting create an adverse visual impact as viewed from the floor of the Maroon Creek Canyon in the area below each home site The General Declaration of Covenants, Conditions and Restnctions to be imposed upon the free market lots shall :ndude a covenant restriction requiring, prior to construction on any such lot, a site specrflc analysis by a certif!ed surveyor or engineer demonstrating that the proposed construction does not impact the Maroon Creek Viewplane. The City of Aspen shall be a beneficiary of this covenant RECEWED 2 02/14/2019 ASPEN BUILDING DEPARTMENT 2.1.2.5.4 Free Market Lots: Maroon Creek Viewplane Construction on the Free Market Lots 7. 8, 9, 10. and 11 shall not impact the "Ma- roon Creek Viewplane" as depicted on the Plat. The purpose of the Maroon Creek Viewplane is to ensure that no rooms, decks, or lighting constructed on these Free Market I ots located above the Maroon Creek Canyon create an adverse visual impact when viewed from the floor of the Maroon Creek Canyon and to a height of six (6)feet above such floor in the area below each such Free Market dwelling unit. The Declaration of Architectural Restrictions for Stage Road Subdivision includes a covenant prohibiting construction which encroaches within said viewplane and the City of Aspen and the owner of I of 3 of the Harvey Subdiivision or the future holder of a conservation easement on Lot 3, if such easement is granted in the future, shall be a beneficiary of this covenant. The covenant shall require that prior to construction on any such lot, a site specific analysis by a certified surveyor or engineer demonstrating that the proposed construction, does not impact the Ma- roon Creek Viewplane as established on Sheet 6 of the Final PUD Plan. See#3 above. 5. Design approval from Architectural Control committee: provide the approval with the permit set or indicate the location of the approval. 2.4.2 Design Guidelines The Design Regulations attached at Exhibit DR-1 shall govern the development within Stage Road PUD are in lieu of the Residential Design Standards of Chapter 26.410 of the Aspen Land Use Code. The Design Regulations may be amended as provided for by them, subject to the approval of the City, which approval shall not be unreasonably withheld or delayed. The Architectural Control Committee established by the Declara- tion of Architectural Restrictions for Stage Road Subdivision shall ensure that the Design Regulations are enforced. Notwithstanding the foregoing, the imposition of any design guidelines applicable to Lot C shall be determined in conjunction with an SPA plan and PUD amendment process for the development of said lot. Documents provided by Zone Architects from the original Double Bar X Architectural Control Committee (ACC) review/approval (located in "Original ACC Approval"folder) and the revised review/approval (ADU transition to Detached Guest Quarters located in the"Revised ACC Approval" folder) have been provided. The RDS exemption form has also been included. 6. Landscaping: look at L2.02 Insubstantial PD Amendment August 10, 2010, reception#584100 4. I.andccaping Urban landscaping shall be permitted within 100 feet of the perimeter of a building, when the building is located within a building envelope. Urban landscaping shall not he permitted along Maroon Creek below the "Top of Slope"as identified by the C'ity Engineer. Urban landscaping shall not be permitted within five feet of an agricultural easement. Also, urban landscaping shall not be permitted within 15 feet of a RECEIVED 3 02/14/2019 ASPEN BUILDING DEPARTMENT lot boundary without the express permission,from the subdivision's Architectural Control Committee. The CMP has been updated to illustrate staging conformance with the Insubstantial PD Amendment, reception#584100. 7. ADU: 1,000 or the requirement to build and ADU may be exempted with the purchase and extinguishment of a TDR from Pitkin County or by a payment-in-lieu in the same manner as the payment-in-lieu for floor area increases.The TDRs are established under the Pitkin County Land Use Code,from sending sites located within the upper portion of the Roaring Fork Valley (lands that drain through the Roaring Fork River at Gerbazdale. Please provide verification about the sending site of the TDR. I have provided email communication with Ben Anderson and Suzanne Wolff that confirms that the TDR in-hand by the owner is from an approved receiver site. 8. Sheet A103C and Section A5.02 detail 1 sheet A304a and A304b Roof Plan Sheet A401a, A401b, A402,A403a,A403b,A404,A405,A406 The PD has a height limit of 30', measured from existing grade to the highest point of the structure. Thank you for providing a height table. Please provide perimeter measurements and roof over topography 15' from the perimeter. I have revised sheet A103c. Per our discussion: I enlarged all text, included a dimension between Grid '6' and Grid '3', and provided a "Most Restrictive Points" box for easy reference. The height of the crawl for the stand along guest room appears too high, see sheet A406 detail; 04. And Sheet A506 addition of the floor structure makes the crawl 4'? (RESOLVED) Top of Crawl F.F. -84' 3" The bottom of the lower level floor joists are ' /8" above the crawl F.F. The joists arc 11 7/8" tall per structural. The sub floor is 3/"tall plywood. The finish floor buildup is 3"tall equaling the lower level F.F. elevation-89' 6" Sheet A506: please provide detail for"structural Fill" The "structural fill" is per the typical slab on grade requirements as noted on the structural drawing A/S2.060. I have revised my note to refer to this accordingly. How does the solar work with the height limitation? Height pursuant Ordinance No. 6 (Series of 2005), reception#513680 Section I, Dimensional Requirements chart states: The solar panels will lay flat on the sloped roofs with the top of the panel surface no more than 4.5" above the roof surface,therefore, the panels will not penetrate the height limit. The outline of the solar panels in section have been depicted on sheets A502+A504. RECEIVED 4 02/14/2019 ASPEN BUILDING DEPARTMENT VIA Davis PITKIN COUNTY CO R 96.00 0 0,00 Dimensional Requirements Two (2)parking spaces for each single-family Minimum Of Street Parking Spaces residence and one space for each ADU. Setbacks for Ranch Manager Lot 15 feet on south, cast,west sides, 5 feet on north. 25 feet, measured to the highest point of the Height for Ranch Manager Lot structure Minimum Front Yard Setback Per Approved Building Envelopes on final plat Minimum Side Yard Setback Pcr Approved Building Envelopes on final plat Minimum Rear Yard Per Approved Building Envelopes on final plat 30 feet. measured from existing grade to the _Maximum Height. highest point of the structure PUD Control Document, Development and Vested Rights Agreement, reception#515890 1.2 30-foot height limitation The height of buildings, measured as the vertical distance from undisturbed grade to the highest point on the building, must not exceed 30 feet. It's that simple- if you imagine the shape of the surface of the ground where you are going to build, and then lift that shape 30 feet vertically in the air, it becomes a surface that nothing on the building can penetrate, not even chimneys, plumbing vents or antennae. 1.3 one third up-two thirds down No more than one third of the total above grade square footage of a house may be on an upper floor, and the balance must be on the first floor.This will help give a generally low horizontal emphasis to houses, reducing visual impacts.This doesn't prevent owners from building a very tall single story space like a great room, it just keeps the bulk of the useable floor area close to the ground where it is easier to screen out the sight of neighbors' houses. Again, we must emphasize that these mandatory rules are made for the mutual benefit of homeowners and the protection of the property values they create by their construction. 9. Please provide details for Staging consistent with Insubstantial PD Amendment August 10, 2010, reception #584100 RECEIVED 5 02/14/2019 ASPEN BUILDING DEPARTMENT The CMP has been updated to illustrate staging conformance with the Insubstantial PD Amendment, reception #584100. 10. Impact Fees: Parks: Park Development Impact Fees shall be assessed at the time of building permit issuance based on the current code in place at the time. TDM/Air Quality: Applicant paid $20,000 cash-in-lieu to mitigate for Transportation Management/PM 10 Mitigation. This fee shall be exempt for 25 years. School Lands Dedication: Based on old Code which counted bedrooms.The amount already established. See PD Control Document Section 2.2.7. For Lot 7, 5+ bedrooms the fee is $8,136.64 Affordable Housing: Mitigation for affordable housing was provided through the provision of land for Burlingame Ranch AH project. 11. Outdoor Lighting: PUD Control Document, Development and Vested Rights Agreement, reception#515890 No linear lights and no up lights; please amend the plan accordingly. 2.4.6 Exterior Lighting All exterior lighting within Stage Road PUD shall comply with the Design Regulations at- tached at Exhibit DR-1, provided however, to the extent that the City's lighting standards set forth at Section 26.575.150 of the Code are more restrictive, as they are in effect from time to time, the more restrictive provision shall be given effect, and shall be adopted into the Design Regulations by the Architectural Control Committee and enforced by the As- sociation. RECEIVED 6 02/14/2019 ASPEN BUILDING DEPARTMENT surface and not nominating railings,balustrades, or walls 12 5 No exterior light source shall exceed a strategy 12: Ong of 60 watts Outdoor htng with HID IV sources in excess of 50 watts shall be prohrbAed limit exterior lights Co °� ant lamps Oat not exceed 9 watts An outdoor lighting p'an must be submitted in 12 6 Landscape lighting is limited to 35 watts per conjunction with applications and chat provide all fixture per 150 square feel of landscaped area. Up the decal required by this Section lighting is prohblled as a landscapeg element 12 1 All outdoor lighting shall be fully shielded and 12.7 Security lights shall not be visible from only direct light vertically downward adoinng tots. roads or driveways and must be controlled by a motion sensor activated only by 12 2 Outdoor lighting shall be mounted no more motion within the Owner's property. than 8 feet rn height above the surface rt illuminates In no sitwton shall light intensity exceed 8 foot- 12 8 Photocell controlled lights shall be allowed candles measured 3 feet above grade only at the dnveway entrance or in critical common areas shall be compact fluorescent to eliminate 12 3 All windows s^all be fined with tartans or excess oonsumpton of e'ectriolty. and. except binds capable o'preventing mtenor lighting from at the driveway entrance, shall be automabcal y spilling outside after era k turned oft at 11 OOPM. 12.1 L ghtng on above grade decks a balcones 12 9 No light trespass at any property line is is allowed only it illuminating the deck a balcony allowed Revised lighting documents have been provided. All linear and up lighting fixtures have been eliminated and/or replaced with recessed downlighting. RECEIVED 02/14/2019 7 ASPEN BUILDING DEPARTMENT