HomeMy WebLinkAboutFile Documents.520 S Original St.0144.2018 (2).ARBK Residential Design Standards
Exemption Form nfcmOF ASPEN
Address:520 S. Original St., Unit A
Parcel ID:2737 182 58 030
Zone District/PD:R/MF
Representative:Eric Wynne, GF Woods Construction
Email:eric@gfwoods.com
Phone:319-6938
Scope of Work:See attached letter.
Reviewed by. Justin Justin Barker
y 2018.06.01
(Project plans/elevations attached) Barker 13:33:35 -06'00'
Disclaimer: This exemption is only valid for the attached scope of work.If the project scope ex-
pands to include work subject to Residential Design Standards, the applicant shall be required
to apply for an Administrative Compliance Review.
Exemption Applies I Notes
Remodel of a structure where the alterations proposed Repair work.
change the exterior of the building,but are not addressed
by any of the Residential Design Standards
Residential unit within a mixed-use building
Designated historic resource listed on the Aspen
Inventory of Historic Landmark Sites and Structures
Has already received a board design approval
RECEIVED
06/01/2018
ASPEN
BUILDING DEPARTMENT
520 S. Original St.
Aspen,CO 81611
Repair Scope of Work Letter
By
G.F. WOODS CONSTRUCTION
general contracting+construction management
The scope of work associated with the repair permit for 520 S. Original St. Unit A
is as follows for two existing patios along with two existing skylights.
Demolition of existing patio horizontal surface build up. Minimal selective siding
demolition in proximity to patio structure tie in. Demolition of exiting sliders and swing
doors that tie into patio structures. Selective deconstruction of patio steel railings, to be
reused. Demolition of patio parapet wall and bench seats. Selective demolition of gutters
and deck flashing elements. Analysis of patio structural elements integrity, and corrective
demolition and repair work as necessary and approved by engineer retained on project.
New horizontal build up membrane waterproofing assembly installation. Mud set stone
paver installation. Flashing repair tie in and new sliding and swing door installation.
Reconstruction of existing parapet wall and bench seat along with siding tie in, railing
install and stain and paint.
Skylight roofing repair will be completed by cutting back existing membrane
roofing to expose structural steel elements. A wood framed curb will be constructed
around the steel elements,properly insulated, and sheeted. Roofing membrane tie in to
wrap the curb and new metal flashing caps installed over top curb elements.
G.F.Woods Construction RECEIVED
PO Box 12283
Aspen,CO 81612 Pabb/01/2018
ASPEN
BUILDING DEPARTMENT