HomeMy WebLinkAboutFile Documents.630 W Hallam St.0147.2018 (2).ARBK ASPEN RE-ROOFING APPLICATION CHECKLIST
Aki 2015 IBC/IRC
For Building and Permit Information,please refer to our website at:
hrtp. `www.aspenpitkin.cotn/depts/41/main building.cf n
THE CITY of ASPEN
NOTE: This is a general list of required information \Sore information may be required as each project is individually evaluated. If the proposed
structure requires City Land Use Review,all final approvals must be obtained PRIOR to submission of a building permit application. Contact a city
planner at 970/920-5090 to determinefne if a I and L.se Review is needed.
JOB ADDRESS WW Lae ST 4 PARCEL 1.D.NUMBER
OWNER 3 e F k- (r C l CL DATE: S te/ 18-
All reroofing projects require a roofing permit ii
*Roof work involving changes to height,slope,footprint,structural framing,or cavity insulation requires a Building Permit.
*Patching less than 1 square(10't10')does not require a permit.
Please submit the following:
(JP Permit Application form completely filled out with accompanying 0 Contact Sheet
de ROA C• 1, ication forte signed by the owner of the property
■ YES/ : -Is the site listed on the"Inventory of Historic Sites and Structures"or in the Historic District?
If yes,HPC Approval required. Contact the Historic Preservation Officer at 429-2758
lV Site elan(2 copies)showing the roof and including the following(may be hand drawn):
Ul Extent of proposed work
0 Impervious Areas Show and label all hardscape vs.landscaping
(�1'1 swnspout& Gutter locations draw and label each one and show if they drain to hardscape or landscaping
lit.nowguards/stops required on all roofs that shed onto neighboring properties or potentially occupied areas such as a
walkway,stairway,alley,deck,pedestrian and vehicular exit from buildings or areas where there is potential for
personal injury or property damage and areas directly above or in front of gas utility or electric utility meters.
//�� (Ordinance 40,2016)
tU Photographs(2 copies),one clearly showing the structure involved and one showing a close-up of the existing roof
(g) Construction Management Plan(CMP)(2 copies)which includes a Right-of-Way permit required for work in the public
ROW and an Encroachment License required for occupancy of a public ROW.
❑ Asbestos Checklist(1 copy)regarding material removed.
If you• Y.__' `d YES to the Asbestos Checklist,answer these questions:
0 YE 4■ i Are all the roofing materials to be removed asphaltic,tar impregnated and non-friable(will not crumble by hand
pressure when dry)?
❑YES/0 NO-Will you be removing the roofing materials by hand(no circular saws)?
❑YES/0 NO-Will you dispose asphaltic roof shingles and NOT recycle them?
If you answer YES to all of the above,an asbestos test will not be required.
® Assembly:
❑Proposed Roof assembly drawing label each component,including product and manufacturer name and existing
to remain components and number of layers.Show flashing and ice barrier.
Roof Class:
❑Provide a listed roof assembly specific to your roofing product and installation(provide the L L or ESR report)
0 Class A(minimum required for all roofs per Ordinance 40,2016)
MO ng roofing and number of layers: `
❑YES/lib-Is the roof vented?
❑YE Are you removing,replacing,or adding roof deck insulation(including tapered)?
If YES,descn
Letter of Structural Integrity(1 copy)required if adding insulation due to potential increaseincreas .ki snow load.
E 0 NO—Are you replacing damaged roof deck?Approximate square feet: 0 1— If YES,the roof must Yt
comply with the energy code which may require insulation.
Additional requirements from Ordinance 40,2016:
Ice barrier consisting of either self-adhering polymer modified bitumen sheet or two layers of underlayment cemented together required to
extend from the roof eave edge at least 6 feet inside the exterior wall line as measured along the roof surface, 18 inches from the
centerline of the valley and 24 inches on the vertical wall at a roof and wall juncture.
Ventilation openings,including ridge vents,must protect against rain and snow.Individual vents may not exceed 144 sq inches.Vents must
be covered with noncombustible corrosion-resistant mesh or screen with openings no smaller than 1/16"and no larger than'/4".
Wood shakes and shingles require a minimum'/<"vented airspace separating the shingles from the roofing underlayment above the
structural sheathing.
Updated 2/22/2017
RECEIVED
PERMIT NUMBER: MASTER PERMIT: OILI7, 2.D10. / ' DATE: 612020/
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING IT APPLICATION
'u CITY OF Aim
PROPERTY INFORMATION
� �� Call Assessor(97D-920-5160)to verify
ADDRESS t .. UNIT U PARCEL ID U
LOT KOCK OOR SUBDIVISION
DESCRIPTION O t
WORKINDE"*e.,_rL. "ra s '.° ra
S
BEST CONTACT?a,4( ,. ,.:�'„�?'d °{.— CELL -...g7 7 EMAIL �C DP,,
NAME . r
O:h'NER NAME + CELL AIL f o Yoh /"j/3
CS � ( K�yi Y�tCaN� ('c �l ke� v
PROJECT DETAILS
PROI CT 4 i oup, Use of Building Class of Work Fixture Counts Equipment Checklist
VALUATION `..' s
❑ Commerical ❑New Toilets,Bidets Forced Air/Gravity Systems
so WORK A' f 1 ❑ Multi-Family Bathtub
WO AREA f ❑ Addition Wall,Suspended,or Unit Heaters
Single Family ❑ Alteration Lavatory(Wash Basin)
Gas Log
UNIT SstFa Mixed-Use Repair Shower Gas A liancew
❑ D IFFR Kitchen Sink(+Disposal) Appliance Vents
LpTcrr Dishwasher pP•
(SCQFTI -fr 0 Tenant Finish Laundry Bar,Utility Sink Heat,Refrig,Cooling,or
FTL Will there be ❑ Demolition Clothes Washer Absorption Unit
ottany roof/wall 0 Change Order Floor Sink Boilers(includes vent)
penetrations? 0 Floor Drain Air Handling Unit
pc'Vi"SQFT ❑Yes Shower Cooling Systems
Water Heater(Pan Req)
0 No NOTICE:This permit becomes null and Ventilation Fans
am. #Gas Outlets
UTtLiIY void if work or construction authorized _Range Hood
is not commenced within no days,or _Water Treatment
if construction or work Is suspended or Other #of Gas System Outlets
abandoned for a period of 180 days at Snowmelt system Sq Ft
any time after work is commenced.
De s Term Defirt/tfons
Project Valuation:Cost of project as defined in Valuation Affadavit.
Sq Ft of Work Area:Total square footage of area undergoing change or reconfiguration.
Unit Sq Ft Gross Square Footage,not FAR,of permitted unit. APPROVALS 1L_W
Lot SEE:Total sarrve ed square footage of property. 1
Sq Ft of Larsdscape Woric Square footage of disturbed exterior area. Reviewing Review Reviewer Date
New Sq Ft Tom'--,added square footage for additions to net livable or net leasble space. Department Required Initials Appr ved
Ft of Porrrsvith Utirrtv Work:Total s.uare footage not FAR of all rooms with.lumbin:work. Zoning ✓ 62g/f6
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES HPC
Plana C2 ."rc 14'7i I Permit Fee 2.v-- Parks Impact Building V le-- +" 5/P 6
Ene=gyCoe I REMP School Ded. Fire •/ 1 D
It- / Wiv Iq
Zorfrag(SU%) I Plan Check TDM Impact Engineering 1 Imo'
(Hourly) CMP
En r I Zoning(Hourly) Ped,Amenity ph 6/6/ _8
giL- Pam.
CMP(50%) ID I l/_ Engineering Housing Cash in Lieu Utilities
�'1 (Hourly) Water
Party Redev 114 Zoning(50%) Stormwater Stormwater
Unity Rs3 N I CMP(50%) ID I.(p'i City Use Tax Sanitation
Other I Electrical County Use Tax Env. Health
I Plumbing GIS / Dr 5/25/18
I Mechanical Sanitation Parks V
Landscape
Lot Area Efficiency
Zone District Approved )AM 6/26f 8
Deed Restricted To Issue
PLANS LOCATION bV 10 ®qi - —4I / Census Code Issuance
#of Dwellings
CITY OF ASPENAugust2017 130 S. GALENA ST ASPEN', CO 81611
RE1,-;EIVED
ADDRESS:
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET THE CITY OF ASPEN
FOR PLAN REVIEW QUESTIONS
- Phone- C E-mail E <
Name ^-� ---, ,_ — - -���i� � I
FOR INSPECTION QUESTIONS
Name Phone E-mail
OWNER
Name ;
.f_F g-rikeC*1G Phone Cell Phone
Mailing Q/ /r
Address Ij �3 '�(GL�M.. al^ t City Q State � ZIP C.�G� `
Addaress 'I"�tC rf �s rr�r.�t C a. gas— 6 (�l "' Zs'cr
OWNER'S AUTHORIZED AGENT oO ��
Name <je A f( Q— .Phone `e 76 Cell Phone L� i
Mailing � jj tw I � t r /"� �,� g // q
Address A3 v401(4.1" tt f l k v�Y-( A City' grAn � State ZIP g vZ
E-mail
Address
APPUCATION BEST CONTACT /
r� t3 0a g-76 7 Cell Phone on O 7b 7
Name �._ ; i C.'� Phone j� ���
Mailing ' # Z `y��� �//�b�� tY (��'
Address f Ci `J State ZIP
E-mail
Address
ARCHITECT OR DESIGNER OF RECORD
Name Phone Cell Phone
r
Mailing
Address - City State ZIP
E-mail
Address
CIVIL ENGINEER OF RECORD
Name Phone Cell Phone
Mailing
Address / City State ZIP
E-mail
Address
STRUCTUAL ENGINEER OF RECORD
Name Phone Cell Phone
Mailing
Address !rT City State ZIP
E-mail
Address
GENERAL CONTRACTOR p�
Name C���- t v a 171ff a A - Phone i , r - 7 Cell Phone p�bd 2' - 7
Addl enfs �� 4 T A(s .� t ,City , , Sta1a ZIP J C /6,Z (
E-mail
Address
INSPECTIONS: The General Contractor must schedule inspections online.
Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so.
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this e of work will -complied with whether specified herein or not. The granting of a permit does not
presume to give a to vi late ancel tie provisions of any other state or local law regulating construction or the performance
of constructio is my si Ity to review the approved plans and any comments that are contained the eon and see that the
structure /or proj is ' in nee with all applicable codes. �^
�
Contractor `
Signature Date s !
❑ !Check if atested er 'ngle-family homes only).You must take a test and compute the owner/building affidavit.
fC1TY E •ner builder aooroved by: Date: Affidavit on file
CITY OF ASPENAugust2017 130 S. GALENA ST ASPEN, CO 81611
RECEIVED
PERMIT NUMBER: ADDRESS:
COMMUNITY DEVELOPMENT DEPARTMENT
SCOPE OF WORK CHECKLIST THE CITY OF ASPEN
LAND USE QUESTIONS
If you check any of we boxes below,please consult with the Planner of the Day(planneroftheday@gmail.com) before submitting your
permit application.
Does your permit involve any of the following?
❑ Part of an approved COA Land Use Review ❑ Work involves Landmark Parcel or Historic District
❑ Work affects net leasable, net livable, or ❑ Located in 100-year flood plain or within 100' of high
non-unit space water mark
❑ Work involves lot splitting or combining a lot ❑ Work involves changes in occupancy to structure
❑ Work involves exterior of structure ❑ Changes to elevator or stair configuration
❑ Changing the number of residential units ❑ Changes to the use of existing structure or space
❑ Changes to number or location of
onsite parking
ADDITIONAL SCOPE OF WORK QUESTIONS
Does your permit involve any of the following?
❑ Exterior lighting added or changed ❑ Work involves exterior wall penetrations
❑ Work involves roof penetrations ❑ Work involves digging or excavation
❑ Work adds, removes, or changes ❑ Work involves restaurant or food service
plumbing fixtures
❑ Disturbs 1,000 sq ft or more of soil within ❑ Affects parking spaces/meters, loading zones, or alleys
12 months
❑ Work occurs in public right of way ❑ Adding structures or systems over utility lines
❑ Work affects trees or occurs within the ❑ Work within City Mall boundaries
dripline of a tree
Roc)12-ito Djd-
CITY O; S EN -= 130 S. GALENA ST ASPEN, CO 81611
RECEIVED
PERMIT NU1.MBER: ADDRESS:
I
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DESCRIPTION FORM - IRC & IBC THE On OF ASPEN
BUILDING CODE INFORMATION
❑ 2015 IRC ❑ 2015 IBC ❑ Other (Please Explain)
Code Editions (As Adopted and Amended) (As Adopted and Amended) tt�
Fire Sprinkler System I Existing? HNeos I Required? ONea I Type ❑ NFPA 13 ❑ NFPA 13 R ❑ NFPA 13 D
Type Of Construction ❑ VA ❑ VB❑ IV ❑ IIIA ❑ IIIB ❑ IIA ❑ IIB ❑ IA ❑ IB 'Fire Alarms Installed ❑ Yes❑ No
Required Special Inspections ❑ High-Strength Bolting ❑ Epoxy Anchors ❑ Structual Steel Welding
❑ Permanent Micropiles ❑ Sprayed Fire-Resistants ❑ Other
Energy Code Compliance ❑ Prescriptive Table
❑ RESCheck UA Alternative ❑ COMCheck UA Alternative
Exterior Energy Use Total Approved On-Site Snowmelt Spa kj Pool
(Existing+ New)
Building Type/ I ❑ A_ ❑ B ❑ F� ❑ E ❑ R_ I ;One Family ❑ Two Family
Occupancy Group g ❑ B (A<50) ElH DMOS_ R
❑ l ❑ U C ElTownhouse
UNIT DESCRIPTION AS PROPOSED
# Stories Above Grade t #Stories Below Grade ADU BUILDING DESCRIPTION
Attached Garage Detached Garage Carport Is there an ADU? ❑ Yes
Parking Spaces Parking Spaces Parking Spaces _ ❑ No
# Living Rooms
# Bedrooms # Full Baths Deck Area # Kitchens
# Full Baths
# 3/4 Baths # 1/2 Baths #3/4 Baths
# 1/2 Baths
# Kitchens #Wood Fireplaces # Bedrooms
#Other Rooms (List)
# Gas Appliances #Gas Logs
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical &Storage)
Basement
Main Level
2nd Floor
3-d Floor
_ __ Date:
CITY OF ASPEN, -Z__7 130 S. GALENA ST ASPEN, CO 81611
RECEIVED
ADDRESS:
PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT ��
HOMEOWNER ASSOCIATION COMPLIANCE FORM A.CPFN
All applications for a building permit within the City of Aspen are required to include a certification of compliance
with applicable covenants and homeowner association policies. The certification must be signed by the property
owner or attorney representing the property owner. The following certification shall accompany the application
for a permit.
441,0\c` UNIT# + PARCEL ID# 2 SI Z(AZ lS/CI5 13
uaL 6k)tV\� '�� 4k `\ u a r�
I, the property owner, certify as follows: (pick one)
❑ This property is not subject to a homeowners association or other form of private covenant.
❑ This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit do not require approval by the homeowners association or covenant
beneficiary.
This property is subject to a homeowners association or private covenant and the improvements
reposed in this building permit have been approved by the homeowners association or covenant beneficiary.
I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning, or effect
of private covenants or homeowner association rules or bylaws. I understand that this document is a public
document.
Owner Signature W ) Date
15*UAW
Owner Printed Name `�! �, l— 1QlVK)
OR
Owner's Attorney Signature Date
Owner's Attorney Printed Name
I CITY OF ASPENJanuary2018 130 S. GALENA ST I ASPEN CO 816tir o
8
ASPEN
BUILDING DEPARTMENT
ADDRESS:
COMMUNITY DEVELOPMENT DEPARTMENT
HOMEOWNER ASSOCIATION COMPLIANCE FORM THE CITY OFASPE\
.. _ permit within the City of Aspen are required to include a certification of compliance
___ _ . . _ :s and homeowner association policies. The certification must be signed by the property
per c :e: representing the property owner. The following certification shall accompany the
��oli -�nfo� ce—
ADDRESS ( i-.S UNIT# PARCEL ID#
L the property owner, certify as follows: (pick one)
❑ This property is not subject to a homeowner's association or other form of private covenant.
❑ This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit do not require approval by the homeowners association or covenant
beneficiary.
This property is subject to a homeowners association or private covenant and the improvements
`proposed in this building permit have been approved by the homeowners association or covenant beneficiary.
I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning or effect of
private covenants or homeowner association rules or bylaws. I understand that this document is a public
document.
Owner Signature Date
Owner Printed Name
OR
L_CA/ 2-0 fg
Authorized Agent Sig ature Date
Authorized Agent Printe ame fe>"
CITY OF ASPEN. ,,,,- 130 S. GALENA ST ASPEN, CO 81611
RECEIVED
PERMIT NUMBER: ADDRESS:
COMMUNITY DEVELOPMENT DEPARTMENT
VALUATION A F FA DAV I T THE Orr OF ASPEN
AFFIDAVIT POLICY
All applications for a building permit within the City of Aspen are required to include a certification of
compliance with building permit valuation requirements. The certification must be signed by the property
owner or authorized representative. The following certification shall accompany the application for a permit.
I, the property owner or authorized agent, understand and certify as follows:
City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and
International Building Code (IBC) with certain amendments. These codes define building valuation as follows:
R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a
permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems,
including materials and labor.
109.3 Building permit valuations.The applicant for a permit shall provide an estimated permit value at time
of application. Permit valuations shall include total value of work, including materials and labor, for which the
permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in
the opinion of the building official,the valuation is underestimated on the application, the permit shall be
denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final
building permit valuation shall be set by the building official.
City policy indicates that permit valuation includes materials and labor for the structure and mechanical,
electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as
audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction
such as equipment rental and contractor fees. Finish materials such as paint, floor coverings, tile, cabinets and
counter tops are included in the permit valuation total.
Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development
mitigation fees, trash removal, and cleaning are not included.
I certify that the permit valuation entered on the permit application for this property complies with the above
valuation requirements. I understand that this document is a public document.
Owner Signature: Date:
Owner Printed Name:
or,
Authorized Agent Signature. �[ _ (��•�DDate:
SZv 20/g
Authorized Agent Printed me: ;�—"'"(J ' rcL._
CITY OF ASPEN August 2017 130 S. GALENA ST ASPEN, CO 81611
RECEIVED
PERMIT NUMBER: ADDRESS:
COMMUNITY DEVELOPMENT DEPARTMENT
ASBESTOS VERIFICATION AND CHECKLIST THE OR OF ASPEN
ASBESTOS INFORMATION
-__ s a known human carcinogen and is an airborne hazard. Once airborne,asbestos fibers can stay suspended in the air for days,
c-even months before settling out of the air.The fibers can easily become airborne again from a minor disturbance like turning
on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos
-azards that could expose people to asbestos in the future, long after the renovation activity occurred.The airborne asbestos fiber
concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home.
The 1989"ban"on asbestos-containing materials is commonly misunderstood. In fact, in 1991 the U.S. Fifth Circuit Court of appeals
va:__ed much of the so-called "Asbestos Ban and Phaseout Rule"and remanded it to the EPA.Thus, much of the original 1989 EPA ban
or :-a U.S.manufacturing, importation, processing,or distribution in commerce of many asbestos-containing product categories was
se;a_l.de and DID NOT TAKE EFFECT.Therefore,ALL demolition,remodel or renovation projects must determine if disturbed material
ab .e the trigger levels contains asbestos.
ASBESTOS CHECKLIST
Yes
Residential: Will you be removing more than 32 sq ft, 50 linear feet (e.g., pipe insulation), or the volume
equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel-examples are drywall,
linoleum, ceiling tiles, roofing materials, etc.?
❑Ye-/■ •1
Comme ial: Will you be removing more than 160 sq ft, 260 linear feet (e.g., pipe insulation), or the volume
equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel -examples are drywall,
linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.?
If the answer is YES to any of the above,you will need an asbestos test before you can receive a building and/
or demolition permit.You will also need to provide plans indicating areas to be demolished and determine if a
CO state demolition license is required.A state certified asbestos inspector must do this test and the test report
must be submitted with the building permit application. If the building has asbestos, a state certified asbestos
abatement firm must remove it. After removal,the abatement firm must provide a letter to the Building Division
stating that all the asbestos has been removed and that the air is clean. This letter must be received BEFORE a
permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state.co.us/ap/
asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof of current
state certification.)
If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the
Aspen permit app. This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE:
A copy of this demolition permit app must be submitted with the initial building permit application. When the
CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our
permit.
-
I hereb -certify t bove information is true and complete.
0 ner Phone# CY g6 ?
Applicant (print namel �� Phone # O -Z76 7
Applicant Signatur Date -S--- O ��1S-
Please call the of s n viental Health Department at 920-5039 at any time if you have questions
about asbestos in , pretic g our test results, or other matters.
CITY OF AS ENAugust2017 130 S. GALENA ST ASPEN, CO 81611
RECEIVED
PERMIT NUMBER: ADDRESS:
COMMUNITY DEVELOPMENT DEPARTMENT kr-
ZONING COMPLIANCE VERIFICATION POLICY TIIECIIY OF ASPEN
Applicability: All development projects must comply with the City's zoning regulations, including height and
location, and are subject to periodic inspection during construction and a final inspection prior to project
completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen
shall verify height and/or location compliance through submission of a survey report.
Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one
foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance
through this method.
In addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/
duplex development or other projects where compliance may be in question. Independent of this policy, all
projects must comply with all applicable zoning limitations.
The Zoning Officer will inform the applicant during building permit review if verification will be required.
However, circumstances may require zoning compliance verification of a project which is already underway.
Timing: Height verification should be accomplished at a point of construction when enough roof structure is in
place to accurately measure the structure yet early enough in the process to still make changes if the structure
is too tall. Location verification should be accomplished at a point of construction when the final exterior of the
structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer
with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to
perform their own verification during construction to ensure the building is progressing to plan, including the
height and location of foundation forms prior to concrete pours.
Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a
structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The
City's Zoning Officer can assist in determining which elements of the structure should be measured and if natural
or finished grade should be used.
The report shall include the following information:
1-A brief cover letter with the building permit number, name of the project, name of the owner and general
contractor, with a written description of the measurement methods including date(s) of measurement.
2-For location verification: A plan drawing showing property boundaries, permitted setbacks, building envelope
(if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all
exterior veneer or other exterior treatments), and the location and dimension of each observed measurement.
3-For height verification: Elevation drawing(s) showing the natural or finished grade of the property, maximum
permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior
sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles,
or other veneer treatments orornamentation), and the location and dimension of each observed measurement.
Additional roof plans showing location of measurements may be necessary.
CITY OF ASPEN August2017 130 S. GALENA ST ASPEN, CO 81611
RECEIVED
-". ",Ur.lBER: ADDRESS:
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY THE CITY oFASPE,
L-Plars and elevations must include height or setback exemption items unique to the building, such as stair/
evator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items
unique to the project.
5-The report shall include a written description or drawing notes of the benchmarks or control points used to
establish property boundaries, setbacks, building location, building height,and grades for each measurement.
6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in
the approved building permit set.
7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who
conducted the field measurements certifying that the field measurements areaccurately represented.
Review and Acceptance of Report:The Zoning Officer shall review the report(s) and either confirm the project
conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets
the zoning limitations for the property or shall determine which elements of the project are not in compliance.
The Zoning Officer may request additional information to verify zoning compliance, which may include but is not
limited to additional survey work or a site visit.
All drawings of the survey report must correlate with representations in the approved building permit set for
acceptance. Modifications to field conditions or amendments to the building permit may be required.
A determination of non-compliance shall result in the issuance of a correction notice and possible work
stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the
construction process to minimize disruption to the construction schedule.
Acknowledgment:
I (contractor name iCe.vk/��' ' a- understand this policy. I agree that this project will
comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of
the approved building permi s. I underst4.nd that a Certificate of Occupancy will not be issued until this
project complies with al p ' able zoninglirnitations.
Contractor Signat e:
Date: S J 2.0f b
CITY OF ASPENauz.-T 130 S. GALENA ST ASPEN, CO 81611
ECEIVE'D