ASBESTOS REPORT
DATE
04/16/2018
CLIENT
520 E Hyman 2B
c/o Hansen Construction, Inc.
310 AABC
Aspen CO 81611
PROJECT PROPERTY ADDRESS
520 East Hyman Avenue, Suite#2B,Aspen, Colorado 81611
For orientation purposes, the front door faces south.
CLIENT BACKGROUND
The Client, Hansen Construction, Inc., hired HealthSafe Inspections, Inc. (hereinafter,
HealthSafe) to perform and asbestos inspection, bulk sampling of suspect building
materials and to write this report for the following addressed commercial suite: 520 East
Hyman Avenue, Suite#2B,Aspen, Colorado 81611. The slated remodel plan is to gut the
entire unit at a maximum or at a minimum gut the ceiling and the north, east and west
walls and leave the south wall—which has recently been installed as new. This inspection
includes either scenario for the event that the architect, GJ and owner decide to gut thRE 1 , E IVE D
1 05/22/2018
ASPEN
BUILDING DEPARTMENT
entire unit to the studs, subfloor and ceiling deck. No exterior materials are included in
this report; only the interior of the unit is included in this report.
Please note that this report is not intended for estimating purposes. Measurements
provided in this report are for the sole purpose of determining numbers of samples
required per suspect material. Contractors or subcontractors will have to do their own
surveys and inspections for their own estimating.
VISUAL INSPECTION & LABORATORY FINDINGS
An inspection was conducted by Jim Baker of HealthSafe on April 9, 2018 with Reid
Hansen. Suspect ACM/ACBM were identified and sampled. Those materials are the
following:
1. South Wall & Ceiling Drywall System Joint Compound: a homogeneous
miscellaneous seam taping compound requiring at minimum of at least two
samples ("...number of samples sufficient to determine" ...if asbestos is present
or not) [samples 1-2: 2B-S-WL-JC-1,2]. The PLM analytical estimated results:
NONE DETECTED.
2. South Wall & Ceiling Gypsum Wallboard/Drywall System: a homogeneous taped
and joint compounded drywall system(classified as a miscellaneous material as a
complete integral system) [samples 3: 2B-S-WL-J]; these composite layered taped
and joint compounded drywall materials are on the newly install south wall &bar
ceiling without an applied surfacing material/texture. The PLM analytical
estimated results: NONE DETECTED.
3. Skip-Trowel Surfacing Material/Texture: a homogeneous trowel-applied
surfacing material/texture [samples 4-8: 2B-ST-C/W-T-1,2,3,4,5]. This surfacing
material/texture is on an update portion of the bar ceiling and walls—some
covered over original orange peel texture. The estimated surface area is more than
1,000 sf, but less than 5,000 sf, requiring a minimum of at least five
surfacing/texture material samples. The PLM analytical estimated results: NONE
DETECTED.
4. Skip-Trowel Drywall System Joint Compound: a homogeneous miscellaneous
material requiring at least two samples [samples 9-10: 2B-ST C/W-JC-1,2]. The
PLM analytical estimated results: NONE DETECTED.
5. Skip-Trowel Gypsum Wallboard/Drywall System: a homogeneous taped and joint
compounded drywall system (classified as a miscellaneous material as a complete
integral system) [sample 11: 2B-ST J]; these composite drywall materials are on a
portion of the bar ceiling and walls. The PLM analytical estimated results: NONE
DETECTED.
6. Orange Peel Surfacing Material/Texture: a homogeneous trowel-applied
surfacing material/texture [samples 12-14, 16-17: 2B-OP-T-1,2,3,4,5]. This
surfacing material/texture is on the kitchen ceiling and walls. The estimated
surface area is more than 1,000 sf,but less than 5,000 sf, requiring a minimum of
at least five surfacing/texture material samples. The PLM analytical estimated
results: NONE DETECTED.
RECEIVED
2 05/22/2018
ASPEN
BUILDING DEPARTMENT
7. Orange Peel Drywall System Joint Compound: a homogeneous miscellaneous
material requiring at least two samples [samples 18-19: 2B-OP-JC-1,2]. The PLM
analytical estimated results: NONE DETECTED.
8. Orange Peel Gypsum Wallboard/Drywall System: a homogeneous taped and joint
compounded drywall system (classified as a miscellaneous material as a complete
integral system) [sample 20: 2B-OP-J]; these composite drywall materials are on
original kitchen ceiling and walls. The PLM analytical estimated results: NONE
DETECTED.
9. Plaster Surfacing Material/Texture: a homogeneous trowel-applied surfacing
material/texture [samples 21-23: 2B-PL-T 1,2,3]. This surfacing material/texture
is on the bar north and west walls. The estimated surface area is more than 160 sf,
but less than 1,000 sf, requiring a minimum of at least three surfacing/texture
material samples. The PLM analytical estimated results: NONE DETECTED.
10. Plaster Drywall System Joint Compound: a homogeneous miscellaneous material
requiring at least two samples [samples 24-25: 2B-PL-JC-1,2]. The PLM
analytical estimated results: NONE DETECTED.
11. Plaster Gypsum Wallboard/Drywall System: a homogeneous taped and joint
compounded drywall system [sample 26: 2B-PL-J]; these composite drywall
materials are on the north and west bar walls. The PLM analytical estimated
results: NONE DETECTED.
12. Kitchen Floor Non-Slip Epoxy: a homogeneous textured paint, a miscellaneous
material requiring at least two samples [samples 27-28: 2B-K-SV 1,2]. The PLM
analytical estimated results: NONE DETECTED.
There were no other additional suspect asbestos building materials to sample which were
slated to be removed and disposed of in the total interior gut.A total of 28 suspect
homogeneous ACM/ACBM bulk samples were collected and 28 samples were analyzed.
The bulk samples were analyzed by PLM by a NVLAP accredited laboratory in
accordance with Colorado State Regulation 8 for the presence of asbestos mineral fibers.
There is NO asbestos in all 28 samples analyzed.
See supporting Hayes Microbial Consulting, Inc. data report#18010949.
HEALTHSAFE CONCLUSIONS
There is NO asbestos in any of the suspect building materials slated to be impacted by the
interior gut and total remodel/renovation. NO asbestos abatement will be required.All
building materials needing to be removed or disturbed can be dealt with without the
concerns for asbestos fibers.All building waste and debris can be disposed of in any
landfill which accepts normal, non-hazardous building waste.
Sincerely Submitted,
Jim Baker
RECEIVED
3 05/22/2018
ASPEN
BUILDING DEPARTMENT
COLORADO & FEDERAL ASBESTOS REGULATIONS SUMMARY
Regulation No. 8 Part B—Asbestos of the Colorado Department of Public Health and
Environment(CDPHE),Air Quality Control Commission requires a State-certified
Asbestos Building Inspector to inspect and collect bulk samples of all suspect asbestos
containing materials (ACM) or suspect asbestos containing building materials (ACBM)
prior to their disturbance, removal or demolition and disposal. The suspect materials shall
be analyzed by a NVLAP accredited laboratory by polarized light microscopy(PLM)
using EPA 600 analytical method.A material which is estimated to contain more than 1%
asbestos is classified as ACM/ACBM and regulated by the State and Federal
governments.Any friable (able to crush or reduce to powder by finger pressure) asbestos
with trace amounts of asbestos fibers or less than 1%must be point-counted using EPA
400 analytical method to prove that it is indeed less than 1%; if not, it must be classified
as ACM/ACBM and shall be treated as a State and Federal regulated material.Any
friable asbestos containing material (greater than 1% asbestos concentration) or
ACM/ACBM that could be rendered friable during its removal or demolition and disposal
shall require an asbestos abatement by a certified asbestos abatement contractor to
remove and dispose of the material(s).
A Colorado State (CDPHE) issued asbestos abatement permit is required for the
following trigger levels of ACM/ACBM:
1. Residential buildings of four or fewer units--if more than 32 square feet of any
surface coverage (e.g., gypsum wallboard or drywall and associated applied surfacing
materials/textures, acoustic sprays,joint compounds,plaster, etc.), 50 feet of asbestos
covered or asbestos insulated pipe or any material which would fill a 55-gallon drum is
going to be disturbed, removed or disposed of, an asbestos abatement permit is required.
2. Residential complexes with more than four residential units, public access areas to a
residential building, commercial and retail buildings,public and civic buildings,
industrial buildings--if more than 160 square feet of surfacing materials, 260 linear feet
or more than 35 cubic feet(NESHAP) or 55-gallon drum(CDPHE) of suspect
ACM/ACBM is going to be disturbed, removed or disposed of, an asbestos abatement
permit is required under NESHAP and by the CDPHE. See note below on OSHA.
The regulations require an absolute minimum of 3 samples (EPA suggests 9)per
homogenous suspect surfacing and TSI materials and an absolute minimum of 2 samples
of homogenous miscellaneous materials or any number of"samples sufficient to
determine whether a material is ACM" (Reg8.IV.D.3). More samples are required based
on surface area or volume. These are minimums; the asbestos building inspector has the
field responsibility to determine homogenous materials and the number of samples to
collect per material; more than the minimum number of samples may be necessary at the
discretion of the inspector.An assessment of friability and functional space conditions of
the materials are also the inspector's field responsibilities.
RECEIVED
4 05/22/2018
ASPEN
BUILDING DEPARTMENT
OSHA compliance is required for all employers and employees no matter the
quantity of asbestos present with strict regulations regarding 10 sf or more of TSI or
friable surfacing materials, and therefore it does not matter what the quantity or
State trigger levels are: all suspect ACM/ACBM shall be inspected and tested for
asbestos prior to their disturbance, removal and disposal for worker protection and
safety. See EPA 40 CFR 763.121 Worker Protection Rule, OSHA 29 CFR 1910.134
Respirator Protection Standard, OSHA 29 CFR 1910.1001 General Industry Standard and
OSHA 29 CFR 1926.1101 Construction Standard regulations when dealing with asbestos
hazards.
Note: County or City regulations may be more stringent.
RECEIVED
5 05/22/2018
ASPEN
BUILDING DEPARTMENT
HMC #18010949
HAYES
MICROBIAL CONSULTING
3005 East Boundary Terrace,#F
Midlothian,VA 23112, USA
804.562.3435 Fax: 804.447.5562
contact@hayesmicrobial.com
http://hayesmicrobial.com/
Analysis Report prepared for
HealthSafe Inspections
390 Apple Drive
Basalt, CO. 81621
Phone: 970-920-2100
Job Name: 520 E Hyman #2B c/o Hansen Construction
520 E. Hyman
Aspen, CO 81611
Date Sampled: 04-09-2018
Date Analyzed: 04-11-2018
Report Date: 04-12-2018
EPA Laboratory ID#VA01419
4HeaIth
Services
Connecticut Department
of Public Health RECEIVE!)
NVLAP Lab Code: 500096-0 Asbestos License: 300435 License:#PH-0198 0 5/2 2/2 018
AS Wy of 6
BUILDING DEPARTMENT
4111D HAYES
MICROBIAL CONSULTING
3005 East Boundary Terrace,#F
Midlothian,VA 23112, USA HMC #18010949
804.562.3435 Fax:804.447.5562
HealthSafe Inspections
390 Apple Drive
Basalt, CO 81621
April 12, 2018
Client Job Number:
Client Job Name: 520 E Hyman#2B c/o Hansen Construction
520 E. Hyman
Aspen, CO 81611
Dear HealthSafe Inspections,
We would like to thank you for trusting Hayes Microbial for your analytical needs. On April 10, 2018 we received 27 samples by FedEx for the job
referenced above. 27 samples were received in good condition.
The results in this analysis pertain only to this job, collected on the stated date and should not be used in the interpretation of any other job. This report
may not be duplicated, except in full, without the written consent of Hayes Microbial Consulting, LLC.
This laboratory bears no responsibility for sample collection activities, analytical method limitations, or your use of the test results. Interpretation and
use of test results are your responsibility. Any reference to health effects or interpretation of mold levels is strictly the opinion of Hayes Microbial
Consulting. In no event, shall Hayes Microbial Consulting or any of its employees be liable for lost profits or any special, incidental or consequential
damages arising out of your use of the test results.
411141 *64---.
Steve Hayes, BSMT(ASCP)
Laboratory Director
Hayes Microbial Consulting, LLC RECEIVE[
05/22/2018
AS of 6
BUILDING DEPARTMENT
HA Y E S HealthSafe Inspections EPA 600/R-93, M-4/82-020 (PLM)
41111D MICROBIAL CONSULTING 390 Apple Drive
3005 East Boundary Terrace,#F Basalt, CO 81621
Midlothian,VA 23112, USA Phone: 970-920-2100 HMC #18010949
804.562.3435 Fax:804.447.5562
Job Number: Job Name: 520 E Hyman#2B c/o Hansen Construction Date Collected: 04/09/2018
Collected by: Jim Baker 520 E. Hyman Date Received: 04/10/2018
Email: healthsafeinspections@gmail.com Aspen, CO 81611 Date Reported: 04/12/2018
# Sample Name Description Asbestos Fibers Other Fibers Non-Fibers
1 1 2B S WL JC-1 Joint Compound/White (None Detected) (None Detected) 100 %
2 2 2B S WL JC-2 Joint Compound/White (None Detected) (None Detected) 100 %
12% Cellulose fibers
3 3 2B S WL J Drywall/Gray/Brown (None Detected) 88%
Layer 2 2B S WL J Joint Compound/White (None Detected) (None Detected) 100 %
4 4 2B ST CW T-1 Texture/White (None Detected) (None Detected) 100 %
Notes: Thin Layer of Paint Observed.
2% Cellulose fibers
5 5 2B ST CW T-2 Texture/White (None Detected) 98%
6 6 2B ST CW T-3 Texture/White (None Detected) (None Detected) 100 %
7 7 2B ST CW T-4 Texture/White (None Detected) (None Detected) 100 %
8 8 2B ST CW T-5 Texture/White (None Detected) (None Detected) 100 %
9 9 2B ST JC-1 Joint Compound/White (None Detected) (None Detected) 100%
RECEIVED
424( n 05/22/2018
Signature: Date: 04/11/2018 Reviewed by: Date: 04/12/2018
A�aof6
BUILDING DEPARTMENT
HA Y E S HealthSafe Inspections EPA 600/R-93, M-4/82-020 (PLM)
41111D MICROBIAL CONSULTING 390 Apple Drive
3005 East Boundary Terrace,#F Basalt, CO 81621
Midlothian,VA 23112, USA Phone: 970-920-2100 HMC #18010949
804.562.3435 Fax:804.447.5562
Job Number: Job Name: 520 E Hyman#2B c/o Hansen Construction Date Collected: 04/09/2018
Collected by: Jim Baker 520 E. Hyman Date Received: 04/10/2018
Email: healthsafeinspections@gmail.com Aspen, CO 81611 Date Reported: 04/12/2018
# Sample Name Description Asbestos Fibers Other Fibers Non-Fibers
10 10 2B ST JC-2 Joint Compound/White (None Detected) (None Detected) 100 %
12 % Cellulose fibers
11 11 2B ST J Drywall/Gray/Brown (None Detected) 88%
Layer 2 2B ST J Joint Compound/White (None Detected) (None Detected) 100 %
5% Cellulose fibers
12 12 2B OP T-1 Texture/White (None Detected) 95%
3% Cellulose fibers
13 13 2B OP T-2 Texture/White (None Detected) 97%
3% Cellulose fibers
14 14 2B OP T-3 Texture/White (None Detected) 97
5% Cellulose fibers
15 16 2B OP T-4 Texture/White (None Detected) 95%
5% Cellulose fibers
16 17 2B OP T-5 Texture/White (None Detected) 95%
3% Cellulose fibers
17 18 2B OP JC-1 Joint Compound/White (None Detected) 97%
3% Cellulose fibers
18 19 2B OP JC-2 Joint Compound/White (None Detected) 97%
12% Cellulose fibers
19 20 2B OP-J Drywall/White (None Detected) RECEIVED
424( n 05/22/2018
Signature: Date: 04/11/2018 Reviewed by: Date: 04/12/2018
ASPAof6
BUILDING DEPARTMENT
HA Y E S HealthSafe Inspections EPA 600/R-93, M-4/82-020 (PLM)
41111D MICROBIAL CONSULTING 390 Apple Drive
3005 East Boundary Terrace,#F Basalt, CO 81621
Midlothian,VA 23112, USA Phone: 970-920-2100 HMC #18010949
804.562.3435 Fax:804.447.5562
Job Number: Job Name: 520 E Hyman#2B c/o Hansen Construction Date Collected: 04/09/2018
Collected by: Jim Baker 520 E. Hyman Date Received: 04/10/2018
Email: healthsafeinspections@gmail.com Aspen, CO 81611 Date Reported: 04/12/2018
# Sample Name Description Asbestos Fibers Other Fibers Non-Fibers
Layer 2 2B OP-J Joint Compound/White (None Detected) (None Detected) 100 %
20 21 2B PL T-1 Texture/White (None Detected) (None Detected) 100 %
Notes: Layer of Paint Observed.
5% Cellulose fibers
21 22 2B PL T-2 Texture/White/Red (None Detected) 95 %
10% Cellulose fibers
22 23 2B PL T-3 Texture/White/Red (None Detected) 90%
23 24 2B PL JC-1 Joint Compound/White (None Detected) (None Detected) 100 %
24 25 2B PL JC2 Joint Compound/White (None Detected) (None Detected) 100 %
12 % Cellulose fibers
25 26 2B PL J Drywall/Gray/Brown (None Detected) 88
Layer 2 2B PL J Joint Compound/White (None Detected) (None Detected) 100 %
26 27 2B K SV-2 Cementitious/Gray (None Detected) (None Detected) 100 %
27 28 2B K SV-1 Cementitious/Gray (None Detected) (None Detected) 100%
RECEIVED
424( n 05/22/2018
Signature: Date: 04/11/2018 Reviewed by: Date: 04/12/2018
A�aof6
BUILDING DEPARTMENT
4111DHA Y E S HealthSafe Inspections Asbestos - Additional Information
MICROBIAL CONSULTING 390 Apple Drive
3005 East Boundary Terrace,#F Basalt, CO 81621
Midlothian,VA 23112, USA Phone: 970-920-2100 HMC #18010949
804.562.3435 Fax:804.447.5562
All samples were received in acceptable condition unless otherwise noted on the report. The Report must not be used by the client to claim product certification, approval, or
endorsement by:Al HA, NIST, NVLAP NY ELAP, or any agency.The results relate only to the items tested. The results include an inherent uncertainty of measurement associated with
estimating percentages by polarized light microscopy. Measurement uncertainty data can be provided when requested. None detected: Below the detected reporting limit of 1% unless
point counting is performed, then the detected, reporting limit is .25%. Per NY ELAP198.6 (NOB) TEM is the only reliable method to declare an NOB material as Non-Asbestos
Containing. Hayes Microbial Consulting reserves the right to dispose of all samples after a period of 60 days in compliance with state and federal guidelines.
RECEIVED
424( n 05/22/2018
Signature: Z Date: 04/11/2018 Reviewed by: Date: 04/12/2018
ASPA 6of6
BUILDING DEPARTMENT
ilit1'1♦/♦1♦•♦'. .•1'♦�♦�.1'1�. \�� .•♦'v.v.1♦ /• � ••1'♦•♦�1�.�. •..�.�.�.�• �� i♦.�.�.'1. ,1(♦.�.�.'1.j• �ii .i♦'��;1'1�j• •11•:♦'1j•.V . iilaa;;;
1/j♦i1;• .•0�♦♦1♦l/.1:.•, ..��:♦1�1♦1�1//•%;:. �.♦1♦1�1/♦�11/I op.. .A1♦/♦♦♦/♦1/♦ 1 vO♦�1♦1♦4:400)• :\11/1�1�/,/♦0;v♦11♦/�1�1♦I//oi,;; �i►1♦j1�1♦/♦lf/ltiop y\111/♦♦♦ r.::i
� :•�11/II�//�/i.�q\\111N///1/•11�//��.,�.\\1�111/1/1/I11//i��•:\V111/1♦/li1/11V/i/e��\\\111♦♦f11♦/jl•//1�..��\�\1jH♦IIII•/jl//rid.•^���\11111//11.•111//,y`�\\I�1/♦+l/l/lij/•j�..�•\\\11N♦1/♦II/ld//�/...��\11N1�����•1
''•illeo•l1/�/;A, J\11111♦III,IIII ilk.., \\111 0,IIIIIli,//�A�\\11111//11j/IIIfl;//AJ\11111/♦1/1•1111/11/'AJ�\11111♦1/11/0,,,•AJ\\ t,...H0411,1 J�\111111♦..0,11!",:r A�\��111�1/11+jI11,/�i4111 ,-'4zt.••/
.•• •!!i%/,^\l•`.?��411�1�111•�!,��r�r1\ '�1�141i//11/�,(•,,,/\\ y�i/�1�/Pli�!�'y'/^\\�``'\�`�11//11/p,,.�y^\ -.,`��11,11/11j/ ,,5,,�/\\\,.,\�II�IIII/,r,,i,r�'^`1\.•���1411�I�/Id,Si�/,/1\\,s�,�,.,y11111�i!A.yr�/1\ `�.��.t'
i�<.rrr/� Id,�,,y,r,I1`�\\>•,;.�.��;!''"�rI/�`R\•.';�:.�!r,"",rIM\\\. y;;ll,.,,rr/\\i\\.,:'!;t.`iiS`S'�'✓r \\\\ 4'4`iid,1���r, N\ ' �� �r n�\ ' S1''i r n\ ► •
.i�i,.,yr��.��\•'',:�.,,L;„�r✓ram\\\,�',:;�:"rrrr�N\\•;:.,. : r,rr�\\♦\ %t;•'r;%'rrrr��•�\\ :'�;:' irrr��\`\\.�.:,..`,t`a'�rfr,^��\\\ �.��;�.: ri+ir��\\\\�nss�;:'ii�iN:ir:
\\ 5;1!Z.••10. .•:�r r�:>�N\ ,:h/✓1,1:: ,1 :?!i /1: �Nl y/ilii I.:_N♦ ::�/i•I� �\\\ ,, //ir:::�N� •:/ :111..<,
%:� � _==tom':.
•e' %; >i) F COS _ I•
4, ,,,_,.4,1r.:4„,,,,1:, *
4 ,4..,, /8 7 6A)! .s.,-;itz117.i.17...str.e.V.,1,
Colorado Department = %;%
•i= = -- of Public Health _ =%=•
i) and Environment ".- •=�f aV
_= -' ASBESTOS c� `tit
- •" CERTIFICATION* ` ��`�
as =-
% � This certifies that t<<
Jim Baker
.•:`i���:5 ice! _-_ -ems=.•i
o..
r.e4,1` .... Certification No.. 13437 uz.
:; -.: y" has met the requirements of 25-7-507, C.R.S. and Air Quality Control . ,,�s'-_
:::` _ = Commission Regulation No. 8 Part B, and is hereby certified by the ;004.1-1-1.-1-s-ifst...f.
� state of Colorado in the following discipline:
,,0 = � Building Inspector*
p.s...T.,.......6.tsf.., ))
Issued: March 28, 2018
„..1.1.4,:i.:44.'
':wr-' - Expires: April 22, 2019 „� =`
iztv
�•
» -
y;,=s ,,,
t ,..,...... ...:........4
), *This certificate is valid only with the possession of a
.!,' current Division-approved training course certification >').0>>;
l`�\\\=:;1.. �i) in the discipline specified above. A orized APCD Representative ':�%= .:.
:•-.� �) SEAL ' • �:
=P42,''•` .. 1 rtifif iir i�natra�n ra n�rP�finite trali �iMAHMiini�nic�i�'a i►1i D::11^i'�'r iin1. i�nitni{ i ni'r OP ' • '
,ice,,,!
< eC)
1;,•�
��� :,:i4 I//e:M::::* p\01* I�/ ,i1'.:i`\i•*11%% It111:•/ :/b� \.•\\�//°% ,.r �\ gif"i •l �i\4•4 >I/' ?,` \► q_
cii:�101%k\/ � ,i01.1�1,4 �A\I / 441,.♦ .!,\\ie;,;i"I�.�I.I.I.4.,*.f//�vil.11`1.i1lkiA.V/,f,�i"I0711l�1,,'4, \/II��:i"Ij`i�1�.`i��ii, i�I//oy"Ij//`i`1$;',,g,. ••�.'
;•.:�.=+1i1�1\y�y�%///11/1i/t/+/♦i4\I\\r/%f/111�i1+1+11+1i\�iw:��//Ij�11/1i/1//1♦1i1�y���/%/IIII1111111111111\\\\`Yl////�//11111//+11/1�1\�\�Vjj�//�/II///II/I+♦111\��``Y�//�//�/IIII/1/1+1♦,I�\��``Yl O S/Z Z/Z O 1 H
.•1N�►+1\►. .d1/II/I♦1+�1111 1/1%•,I.,,, ♦+111\► r,o IIIN♦11♦111 •d////1111♦1111\►. ,4 INN♦11111\. l♦/II �I/ ►111N •i///1 44sq.11\►
•.!NI•♦♦�♦41 r 11111�1•►..' .I 1 /♦.1 ♦x I I ♦ 1/+1 :•• +:i t ♦♦i .. 1/I ♦1•. .•/•IIII /
•♦1♦♦�1♦1i' •♦♦♦♦♦1V/141'•^tilly♦♦j♦ttes • \ •10 jrlj/j♦1♦♦ .. ..1104.00..♦1 .4%•Aj�♦♦ttp, •if...tot1•♦�•�,^i�♦/1♦.....&:,„ ..... �i'�
BUILDING DEPARTMENT
a i t, 'V'•J ✓ ' , 7.7ii ...li• t#, , +-.._ 0..\ '•.:'R�'.rll i . L .s• '' N A 'c7� i�'..‘♦a...►1 :,1__% 1 �i' 1n k..;... h V�'�'PSSYC k..
a .ow 4 .ax i ►►.* <// ••/� d%I_�. �'" 7. x /� . r, i.%. / ♦ r►•,. • ti ' +. h/.► .i.%y. . -
-� .•,,.•Irh I � %, �': •'11�'1'r y�r '�' , •1.1�1., .%/,' �n :�� ,.It/�l. 1.� '' � ,\�" .e.. ,� A 'y �r ,,1,% 4 . •�J.i.
� � iWla1��•i. dNV<!• '..1�::,1+ Ci►Of�•. V,•'.i�Ai. '•.0'•,i. y1�::a�Ii .'}O�r,.. . .hi41�'�1�'i..'/,v�...i ..;yl+ �i.. a•�.�Osr� '. .i4� �P IA):.
.iji;•:%1*.• L •�. J!), In;:if f :r.• III: 1111.•../'. .:!L.•ayi.}'/..../►:. �•...p!',Xs dd...i. •!••. Ilki i A..•.►••. .:r- !14':i .../. ..&0 .:;‘,.:t ..'%1.4:..r ./..:!FtiO.,,„P:-:,;:•.:;,:, %';g:1.4.1';!'', -A
•1/- M ZIES;� 18:. I
V -
- 1 1 1 �1 -
J.
wt.; t:f„.. ,,,,,:' ,,,,,„, , d.:,,..,2„, ..�i7,h,..i,(.�?.1, :,11,, . i;t,: :t ,5 1J,,, ,,,1, d. •.,,1:1 ,li 1.t ', V. rl , t_f = t I - 40
^C
y / v V
G t .';
cwol
a2 !.
Sri
~
•ry% .
)
Z2 c, ° o .l�
U a '`
r a
en
col
( •'�'�r V] U N i ; 'ii
pg..-1.,...-2.,;t2. :..- = '0.'.'e." "•-).)
7:: ...va. si
-O •c * �� V c�Ci
sg, z,.....tki?-....i, -,:.• 441- ,
, L E
tr, )„
,s .,07,:s:,,....,.:,,, ii
, n.,..,.., = a) i 4D C) ••••?:•:•...„..-_.t*:.
. � „B U-= :://iio Q �' �J O O F"• tl
113 �td.LS sgt., "0 Gi) O O ........................
bA cd "
A •. s O O •
=
c).) . _:: ;f:,..,,,er,t",),:.
. S
14't WI'
•� 4 .i #ir. Na>kC•.SIC(1� 1Ai$>+< {+;. x t.(l�.7 la �a.14i} . $$ c ( i8rk.. <lt t1r't @ '/SfS"-1 . Teti 3y t�t6Ri t lai 0 .1 yg{
.�� . fit n.. .. •.•.. �
,R• /IJ�} t ,45.?241 �J r
'♦` 1, ottor
!�1 ; 41/ W T q 1, W A �y t .mac r
�'R •:•.1 •i! ,e '•i:' i%i''nir :;;�!• b:•::1 ,. .0', '1i:lrq;c: :•y TT<i"• .•L,1•., ..:4[[[••• .r. i. Y
i.� ..3:ri1� •...y. ,..• . ., ';; ••..'`,'�.`• "�'. .=;.4. •:.,�,�,.:!• •"A.?.,?.4.r •tsy� .•... .1i.;;r;.;.r ..,a•..3e Tip'.';ya ..s •��- 'tp:;:!;•,? '.:�J:•?e, !••'441')gi', 'D'o.z.Ii12 4'iiis*" ,:y,, 'SI•r�yl'' t: I�. 'tll•Ihe''..• '',/.ill's.'41' '4 / : '''111))g0'N' •Vet''::,'/4'•1.1': '°
(. II///. .0.00'. ��;_::.�A'r4.' •�20 �:.;,4:, '':7— _ N, /%I 4i4 :;','d�Iryr ,�1�' ,,.,i'. .//' ��P. r••NI'/ -TxF lo,
Lam. �..�ILG'�J.4,.�$,, s�.i'�•1r��:•\• •.I/, �•i��.!.�.:►. .����••�. 4,.1;P..�• .:;,h.�si%...AA.• 4..!e14.• �. •./, ....'O... N.� • 4 T ��\
BUILDING DE'ARTMENT