Loading...
HomeMy WebLinkAboutFile Documents.608 W Hopkins Ave.0109.2018.ARBK Red Eagle ROOFING Roofing The Rockies Since 1975 P.O. Box 398 Basalt, Colorado 81621 Phone and Fax: 970-927-3100 Construction Management Plan For Roofing Permit Roof Plan Roof gravel removed, overlay-ed with class O . 'A'fire board before /J' new TPO membrane Water flow to is installed. existing drains Existing roof to remain. EPDM membrane to be removed.Install new class'A'fire board before new TPO membrane is installed. Roof Top Drainage Plan JM PVC 8"DETAIL STRIP \ 1 1/2"MN.WELD 1 MIN.WELD (CONTINUOUS) 1"(25 mm ¶(CONTINUOUS) )1 „„„,„„„„„ 3M PVC COATED METAL EDGE SEE NOTE 4 APPROPRIATE FASTENERS 6"(_57 trim)O,C,STAGGERED JM INS JLATION/COVER BOARD APPROVED DECK WOOD NAILER SECURELY NANCHORED TO DECK-RE:DETAIL P-FE-Vl METAL CLEAT GAUGE,FASTENER AND SPACING PER NRCA, SMACNA OR 3M REQUIREMENTS Edge Metal System To Remain the Same Design and Size L. 04/23/2018 ASPEN BUILDING DEPARTMENT Red Eagle ROOFING Roofing The Rockies Since 1975 P.O. Box 398 Basalt, Colorado 81621 Phone and Fax: 970-927-3100 12 Construction Management Plan For Roofing Permit 1. Dates of Construction are from Permit Issued Durations 20 days 2. Hours Of Construction 8 Am to 5 Pm Monday — Saturday 3. No Gutters Or Downspouts with this Project 4. No Snow Guards with this Project 5. No Right Away permit Required - No Work Around Build 6. No Work Near Trees or Landscaping 7. No Asbestos On this Project 8. Roof System Class A Fire Rated System 9. 1 Existing Layer of EPDM Roofing To Be Removed 10. All Insulation To Remain For R-Value 11. Drainage to be enhanced where possible- See roof Plan Single Ply CELLOFOAM I SINGLE PLY MEMBRANE Membrane ROOF ASSEMBLY ` - - Top Covering,__ —• __ _ EPS ---�� ^^^ ROOF DECK ^N Roof Design Existing Tapered Roof System to Remain RECEIVED 04/23/2018 ASPEN BUILDING DEPARTMENT