Construction Management Plan For Roofing Permit
Roof Plan
Roof gravel removed,
overlay-ed with class O .
'A'fire board before /J'
new TPO membrane Water flow to
is installed. existing drains
Existing roof to remain.
EPDM membrane to
be removed.Install
new class'A'fire
board before new
TPO membrane is
installed.
Roof Top Drainage Plan
JM PVC 8"DETAIL STRIP \
1 1/2"MN.WELD 1 MIN.WELD
(CONTINUOUS) 1"(25 mm ¶(CONTINUOUS)
)1
„„„,„„„„„
3M PVC COATED
METAL EDGE
SEE NOTE 4 APPROPRIATE FASTENERS
6"(_57 trim)O,C,STAGGERED
JM INS JLATION/COVER BOARD
APPROVED DECK
WOOD NAILER SECURELY
NANCHORED TO DECK-RE:DETAIL P-FE-Vl
METAL CLEAT GAUGE,FASTENER
AND SPACING PER NRCA,
SMACNA OR 3M REQUIREMENTS
Edge Metal System To Remain the Same Design and Size
L.
04/23/2018
ASPEN
BUILDING DEPARTMENT
Red Eagle
ROOFING
Roofing The Rockies Since 1975
P.O. Box 398 Basalt, Colorado 81621
Phone and Fax: 970-927-3100
12
Construction Management Plan For Roofing Permit
1. Dates of Construction are from Permit Issued Durations 20 days
2. Hours Of Construction 8 Am to 5 Pm Monday — Saturday
3. No Gutters Or Downspouts with this Project
4. No Snow Guards with this Project
5. No Right Away permit Required - No Work Around Build
6. No Work Near Trees or Landscaping
7. No Asbestos On this Project
8. Roof System Class A Fire Rated System
9. 1 Existing Layer of EPDM Roofing To Be Removed
10. All Insulation To Remain For R-Value
11. Drainage to be enhanced where possible- See roof Plan
Single Ply CELLOFOAM I SINGLE PLY MEMBRANE
Membrane ROOF ASSEMBLY
` - - Top Covering,__
—• __ _
EPS ---��
^^^ ROOF DECK ^N
Roof Design Existing Tapered Roof System to Remain