HomeMy WebLinkAboutFile Documents.610 S West End St.0198.2018 (3).ARBK CONSTRUCTION MANAGEMENT PLAN
for
GANT B102
610 S. WEST END ST.
i.
iit
lr .h.e.rF . � f_ r •,...." `.r :t ter+— �,
- - -
PREPARED BY:
HUFKER DESIGN STUDIO
JULY 3RD, 2018
HUFKER
DESIGN
STUDIO
Page 2 of 3
2.2 This Construction Management Plan is being submitted for the site located at 610 S West End
St. in the City of Aspen. The project is located in the R-15 zoning district. The remodel is located in
the first floor of building B at The Gant.
, ,or LI'I Ir I t
rimiiir
3.
,
ii
..,4&.,•,-' 41 , ,,,,. ,
Ii1M
(rvir-, A\ 4 -\ di) A*
...vi. •'`-‘,
.c.4),
III:
`....
410 ',
Ille
eig
A
• , ii
I
I # bf
j
1 * 1 , i Ill (0\1 ,.
-- �
iis IA •Ii, , _
* , 1, - le-011-7-14.1, 1: iik4It /
ilia ,
illit * 11111 41 (
-% it 44 1,,, Apt I
Unit 8102—The Gant
2.3 The scope of the project is a 975 square foot interior remodel.
5.3 The contractor will request parking spots for subcontractors as required.
5.4 The staging area will be located in a parking spot outside the unit and will be coordinate with
the Gant.
5.5 The city right-of-way will not be affected by this project.
5.7 The contractor will coordinate a dumpster location with The Gant.
6.0 The contractor will follow all traffic control requirements as defined by the City of Aspen. All
deliveries will use the main entry to the driveway.
Page 3 of 3
7.0 Sidewalks will not be affected by this project.
11.0 Noise suppression will not be required as the project location is inside an existing building.