Loading...
HomeMy WebLinkAboutFile Documents.610 S West End St.0198.2018 (4).ARBK AIC CONSTRUCTION MANAGEMENT Please Refer questions to THE CITY OF ASPEN PLAN CHECKLIST the Engineering Dept. NAME OF PROJECT: Gant Unit B-102 (970-920-5080) NOTES: 1.0 General (OFFICE USE ONLY) ❑ Total SF of soil disturbance/SF of building Demo 975 SF (interior) ❑ Table of Contents 2.0 Project Introduction ❑ 2.1 Total project disturbance area? n/a ❑ 2.2 Project vicinity map (Sheet #3) 2.3 Description that includes: ❑ Background information ❑ Proposed development type 3.0 Project Documentation ❑ 3.1 Describe permit types, list permit #'s and Residential remodel permit Include copies of all permits ❑ 3.2 Indicate project notification per CMP Manual ❑ 3.3 Project Sign is constructed and posted o (When construction exceeds 30 days) 3.4 Contact list included for: ❑ Owner (See Permit Contact Sheet) ❑ Contractor u Site supervisor ❑ Safety officer u Traffic officer ❑ Erosion control representative 4.0 Project Implementation (specify/include items below) ❑ 4.1 Dates of construction Sep. 6th - Dec. 1st. ❑ 4.2 Hours of construction 8:30 am - 5:00 pm ❑ 4.3 Construction schedule ❑ 4.5 Describe project fencing n/a ❑ 4.6 Site map for tree protection fencing/tree n/a drip lines (as applicable) ❑ 4.7 Parks Issues — driplines, permits, demo n/a 5.0 Project Management ❑ 5.1 Complete Parking Management form (Appendix B) ❑ 5.2 Read Emergency vehicle access and include a copy of ordinance 35 ❑ 5.4 Map showing location of: • Staging ❑ Trailer ❑ Materials ▪ Waste management Recycling — specify exact plan 6.0 Traffic Control ❑ 6.2 Project haul routes ❑ 6.3 Weight and size limitations of vehicles ❑ 6.4 Construction vehicles activities defined 6.4 Specify delivery vehicle: ❑ Maximum number of deliveries at a time ❑ Hours of deliveries ❑ Exceptions to delivery schedule 6.5 Include Traffic Control Plan — Prepared by a Certified Traffic Control Supervisor that includes a minimum of: ❑ Site Access locations ❑ Street/site signage and barricades for traffic and pedestrian control ❑ Traffic control related to peak traffic hours and special events ❑ Traffic flagging areas and hours 8.0 Sediment and Erosion Control ❑ 8.1 Storm Water Pollution Prevention Plan n/a 8.1 Plan Includes: ❑ Erosion control measures ❑ Mud track location ❑ Tire washing location ❑ Concrete wash location 9.0 Fugitive Dust Control ❑ 9.1 Complete a fugitive dust control plan n/a Plan includes: i Sediment tracking techniques 1 Water Truck i 24-hour contact 10.0 Emissions ❑ 10.1 Assure proper vehicle maintenance Li 10.2 Opacity — no darker than 40% 11.0 Noise Suppression ❑ 11.1 Include a signed noise suppression plan ❑ 11.2 Specify noise equipment/methods used per CMP Manual REVIEWED BY: DATE: