Loading...
HomeMy WebLinkAboutFile Documents.110 Coach Rd.0079.2018 (29).ARBK ASPEN LINE GRADE VERIFICATION FORM Verification of Building Location by Building Contractor For Building and Permit Information,please refer to our website at: THE CITY OF ASPEN http://www.aspenpitkin.com/depts/41/ Exemption A City verification of building location is not needed when the project creates less the 200 square feet of new floor area. PART A: Complete and Submit as part of the Building Permit Application o Building/Job Address or Location: 110+112 Coach Road,Aspen,CO,81611 o Your Name (Person Completing Part A): Jeff McCollum o Your Company: Zone 4 Architects LLC o Plans must show horizontal dimensions that 'tie' the building to the property boundary. Are building ties shown? (circle one) 44150 'No' o An elevation benchmark needs to be established on the site by a licensed surveyor and shown on the plans. What is the elevation of this benchmark? 7766.82' o If the garage is located within I feet of the roadway or sidewalk,provide spot elevation on the on the roadway or sidewalk. Is a spot elevation shown? `No' `N/A' o Provide the equation comparing site(surveyed) elevation to structure/architectural plan elevation: (i.e., 100' first floor elev=7962.50') Architectural 100'-0"=Site Elevation 7780.0' PART B: Complete prior to first Foundation Inspection, by a licensed surveyor or an individual prequalified by the City o Do field measured building ties to property match building ties shown on the plan? (circle one): `Yes' `No' o Surveyor needs to confirm that one spot on the top of the foundation wall is at the same elevation shown on the approved building plans. o What is the field measured elevation of top of foundation wall relative to the site bench mark? o According to the building plans,what was the design elevation for the same place on the foundation wall? o Was the elevation of the building adjusted in field? (circle one): `Yes' `No' o If yes,why? The undersigned qualified individual certifies that the information in Part B is accurate- Signature: Date: _ Printed Name: Contact ph. # : Company: RECEIVED Webpage: http://www.aspenpitkin.com/pdfs/depts/41/linegradeverificationform.pdf Rev. 14 A 2 O 1 H ASPEN BUILDING DEPARTMENT