HomeMy WebLinkAboutFile Documents.110 Coach Rd.0159.2019 (5).ARBK ROARING FORK ENGINEERING 592 Highway 133 • Carbondale, CO 81623 • 970.340.4130 • www.rfeng.biz Lot 7 Stage Rd. — As-built Memo To: Hailey Guglielmo City of Aspen Engineering Senior Project Manager 130 S Galena Street Aspen, CO 81611 970-309-0771 From: Tyler Stevens, PE Project Engineer 592 Highway 133 Carbondale CO, 81623 Ph: 970-379-2687 Fax: 866-876- 5873 cc: Danny Stewart Date: 12/10/2021 Re: Lot 7 Double Bar-X Ranch, Stage Rd. -0079.12018.PRBK During the as-built process for Lot 7 Stage Rd. in the Double Bar-X Ranch, it came to our attention that two pipes that were meant to daylight into swales leading to the drywell were piped directly to the drywell instead. Below are snips of the design and as- built drawings showing the difference. As-built hard piped connection Nek,, I77/1.62 PI/.RAy..- `� S1241t7771.34' I _ min. 147 23.D CHAMBER ' mph INLET n VEL rZj ��AS-built hard piped`P,' 7< RAf=77812°' -connection cr y;, •4• II6"SR'=7778.96 +[ fi[¢^S 777: J , 7778.99' i"PVC 3SrF ♦ SOD ` E� GRAY'FI. ):r Page 1 of 2 ig ROARING FORK IIP ENGINEERING Site changes in grade due to new trees limited the depth of the swales resulting in covering the pipes. The slopes of the pipes are now steeper than the design so capacity isn't an issue. The designed pipe slopes were 2% while the as-built slopes are 10.2% and 4.2%. The BMP for this area was always intended to be the drywell and swales were not considered official BMPs but just additional treatment utilizing the treatment train approach. This as-built conditions still meets all City of Aspen's requirements for the BMP storage and piping capacities. We deem this as-built condition functional and adequate. Thanks for your time, Tyler Stevens Page 2 of 2