Loading...
HomeMy WebLinkAboutFile Documents.520 W Hallam St.0150.2018 (4).ARBK DATE: b 514,0 MASTER PERMIT: PERMIT NUMBER: 0 50 . ?JO (6.• 4- k. `3 • COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION THE CITY OFASIti\' PROPERTY INFORMATION , PARCEL ID# ADDRESS 520 W Hallam UNIT# 273512425005 LOT N and Lot 0 BLOCK 28 TRACT City&Townsite of Aspen OR SUBDIVISION OWNER NAME Lamer,Glen&Tracy L CELL 940-37q-6286 EMAIL Sr}*@S- c//ct.(fwisiy IDVI, :.:on.) NAM �yv„ / Ai Eva r CELLq� -379— 539 p EMAIL am .Qcd��Ie.XYCI04-. om B ho, • PROJECT DETAILS DESCRIPTION IL remove s- roof- t i 3�^^ icy , I n4 py m y WORKPTION F �Ct r > Ir Ia w9r � � f �QSOLI ��fv Si j jk1Sk lIOV jf VALOUR I —,, 232 qp ra � Use of Bui di g Class of Work nFixture ounts Equipment Checklist SQ FT OF ❑ Commerical 0 New Toilets,Bidets Forced Air/Gravity Systems WQRKAREA 3050 — D Multi-Family ❑ Addition Bathtub — Single Family 0 Alteration Lavatory(Wash Basin) Wall,Suspended,or Unit Heaters pp Shower —Gas Log UNITSQFT 0❑ Mixed Use ❑0RFFR it Kitchen Sink(+Disposal) Gas Appliancew LOT SIZE* 6 0a? ❑ Tenant Finish Dishwasher —Appliance Vents Laundry Bar,Utility Sink Heat,Refrig,Cooling,or DISTURBED Will there be ❑ Demolition Clothes Washer Absorption Unit EXTERIOR AREA any roof/wall 0 Change Order Floor Sink _Boilers(includes vent) penetrations? ❑ __Floor Drain Air Handling Unit NEW SQ FT , Yes —Water Heater(Pan Req) Cooling Systems _#Gas Outlets SQFTOFROOMS NO —Other Range Ventilation Fans WITH UTILITY WORK Other Range Hood nn " #of Gas System Outlets ZONE DISTRICT I` Snowmelt System Sq Ft H Project Valuation:Cost of project as defined in Valuation Affadavit. NOTICE: This permit becomes null and 0 Sq Ft of Work Area:Total square footage of area undergoing change or reconfiguration. void if work or construction authorized I— Unit Sq Ft:Gross Square Footage,not FAR,of permitted unit. is not commenced within 180 days,or if construction or work is suspended or Lot Size:Total surveyed square footage of property. abandoned for a period of 180 days at Disturbed Exterior Area:Square footage of lot affected by permit application. any time after work is commenced. w New Sq Ft:Total added square footage for additions to net livable or net leasble space. p Sq Ft of Rooms with Utility Work:Total square footage,not FAR,of all rooms with plumbing work. Re- FOR CITY USE ONLY APPROVALS viewer SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Departmentr Needse Sign- Approved Plan Check I•-1 6)... 0 Permit Fee a;- 00 PC X V Parks Impact Zoning l4 sv 5/3 0/ 3 0/-8 Engineering Zoning(50%) HPC g g School Ded. Building k sv 5/3 0/ 18 (50%)CMP Zoning(50%) Fire 3�1 ., P TDM Impact l/ Engineering Energy Code REMP Ped.Amenity CMP PH 5/31/_3 Water CMP(50%) 31^1, i t Plan Check(Hourly) Housing Cash in Lieu Stormwater Parks Review (60, O 0 Zoning Sanitation (Hourly) Stormwater Env. Health Utility Review Engineering City Use Tax Parks X Dr 5/30/18 (Hourly) i5iii qo Landscape GIS County Use Tax EfficiencxQ Approved`M 6/1/18 Lot Area Deed Restricted To Issue M Census Code #of Dwellings Plans Location Issuance k r /v CITY OF ASPEN December 2017 + ry���• �� 130 S. GALENA ST I ASPEN, CO111 ,18 ASPEN BUILDING DEPARTMENT ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT CONTACT SHEET ' THE CITY OF ASPEN FOR PLAN REVIEW QUESTIONS •_JJ-- Name A yy1te 4e) 4 P,r Phone cro -31? ®® c1.r$ E-mail(;4fihJ�vx,ak'J r ';, FOR INSPECTION QUESTIONS �`` Name i i7 'l —�� • _� L! Phoneq�O -3 -8398 E-mai101Y1 .Q11e�C� d ' OWNER Name G-I e v + Tract1 L •1-0,Yv1 er Phone q}D-3i9-628.6 Cell Phone Addres 3137E1 In Lee lane {-40o �1 City 0sf n State TX ZIP ��G3 A-dmdes sSIeVe 5 40- 1_ _O'St_K ! ). COvn OWNER'S AUTHORIZED AGENT Name Phone Cell Phone Mailing Address City State ZIP E-mail Address APPLICATION BEST CONTACT r� Name Aye. c 4II)(n •er- Phone 9-�o -3/9-8398 Cell P • e Mailing �0 �>t Sroo Address ^ ,,�` City *Basalt t State t^O ZIP C�1 bZ Address a.IM), aIexa iidey c cLIQX renf• Co ►r- ARCHITECT OR DESIGNER OF RECORD Name Phone Cell Phone Mailing Address City State ZIP E-mail Address CIVIL ENGINEER OF RECORD Name Phone Cell Phone Mailing Address City State ZIP E-mail Address STRUCTUAL ENGINEER OF RECORD Name Phone Cell Phone Mailing Address City State ZIP E-mail Address GENERAL CONTRACTOR7. �t Name AT.�_! /_ 0/r� / 10 - Phone 930 - 2 *- 36 49- Cell Phone V1.- ���// Add e� Po City r^�, CO ZIP ett3Z I C7���-�``,�,, //�� �` ��c.�-�� State Add esswm • .k V1a --Ems"Gts bf'i' , (�4tn INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the structure and/or pro' ct is built in compliance with all applicable codes. Contractor Signature / / Date ❑ Check i ou area tested o er bul er Ingle-a ily homes only).You must take a test and complete the owner/bui (IA (CITY E ONLY)Owner builder approved by: pp Date: Affidavit on e ( CITY OF ASPENAugust2o17 130 S. GALENA ST I ASPEN, CO %5Y611/ )18 ASPEN BUILDING DEPARTMENT ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT SCOPE OF WORK CHECKLIST THE CITY OFASPEN LAND USE QUESTIONS If you check any of the boxes below,please consult with the Planner of the Day(planneroftheday@gmail.com) before submitting your permit application. Does your permit involve any of the following? • Part of an approved COA Land Use Review Work involves Landmark Parcel or Historic District ❑ Work affects net leasable, net livable, or ❑ Located in 100-year flood plain or within 100' of high non-unit space water mark ▪ Work involves lot splitting or combining a lot Work involves changes in occupancy to structure Et Work involves exterior of structure Changes to elevator or stair configuration ▪ Changing the number of residential units ❑ Changes to the use of existing structure or space ❑ Changes to number or location of onsite parking ADDITIONAL SCOPE OF WORK QUESTIONS Does your permit involve any of the following? ElExterior lighting added or changed Work involves exterior wall penetrations ElWork involves roof penetrations Work involves digging or excavation ❑ Work adds, removes, or changes Work involves restaurant or food service plumbing fixtures ElDisturbs 1,000 sq ft or more of soil within ❑ Affects parking spaces/meters, loading zones, or alleys 12 months ElWork occurs in public right of way 1:1Adding structures or systems over utility lines ElWork affects trees or occurs within the Work within City Mall boundaries dripline of a tree CITY OF ASPENAugustz017 130 S. GALENA ST I ASPEN, COLk6AAr 18 ASPErr BUILDING DEPARTMENT ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT ASBESTOS VERIFICATION AND CHECKLIST THE CITY OF ASPEN ASBESTOS INFORMATION Asbestos is a known human carcinogen and is an airborne hazard. Once airborne,asbestos fibers can stay suspended in the air for days, weeks,or even months before settling out of the air.The fibers can easily become airborne again from a minor disturbance like turning on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos hazards that could expose people to asbestos in the future,long after the renovation activity occurred.The airborne asbestos fiber concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home. The 1989"ban"on asbestos-containing materials is commonly misunderstood. In fact,in 1991 the U.S. Fifth Circuit Court of appeals vacated much of the so-called "Asbestos Ban and Phaseout Rule"and remanded it to the EPA.Thus,much of the original 1989 EPA ban on the U.S. manufacturing,importation,processing,or distribution in commerce of many asbestos-containing product categories was set aside and DID NOT TAKE EFFECT.Therefore,ALL demolition, remodel or renovation projects must determine if disturbed material above the trigger levels contains asbestos. ASBESTOS CHECKLIST ❑Yes[N,No Residertial: Will you be removing more than 32 sq ft, 50 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel-examples are drywall, linoleum, ceiling tiles, roofing materials, etc.? ❑Yes No Comm rcial:Will you be removing more than 160 sq ft, 260 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel-examples are drywall, linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.? If the answer is YES to any of the above,you will need an asbestos test before you can receive a building and/ or demolition permit. You will also need to provide plans indicating areas to be demolished and determine if a CO state demolition license is required. A state certified asbestos inspector must do this test and the test report must be submitted with the building permit application. If the building has asbestos, a state certified asbestos abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building Department stating that all the asbestos has been removed and that the air is clean. This letter must be received BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state. co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof of current state certification.) If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the Aspen permit app. This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE: A copy of this demolition permit app must be submitted with the initial building permit application. When the CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our permit. I hereby certify that the above information is true and complete. Owner Phone # Applicant (print name) e 1CI&Ader es(g/\-� Cd Phone# 91-U-3N-5396 Applicant Signature `, ��_ ^� Date /a-( i Please call the City o p: Enviro ental Health Department at 920-5039 at any time if you have rrIVE about asbestos, intere ng your t results, or other matters. ( CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CO glieflf 318 ASPEN BUILDING DEPARTMENT ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT VALUATION AFFADAVIT ASPEN THE CITY OF AFFIDAVIT POLICY All applications for a building permit within the City of Aspen are required to include a certification of compliance with building permit valuation requirements. The certification must be signed by the property owner or authorized representative. The following certification shall accompany the application for a permit. I, the property owner or authorized agent, understand and certify as follows: City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and International Building Code (IBC) with certain amendments. These codes define building valuation as follows: R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems, including materials and labor. 109.3 Building permit valuations.The applicant for a permit shall provide an estimated permit value at time of application. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in the opinion of the building official,the valuation is underestimated on the application,the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. City policy indicates that permit valuation includes materials and labor for the structure and mechanical, electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction such as equipment rental and contractor fees. Finish materials such as paint, floor coverings,tile, cabinets and counter tops are included in the permit valuation total. Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development mitigation fees, trash removal, and cleaning are not included. I certify that the permit valuation entered on the permit application for this property complies with the above valuation requirements. I understand that this document is a public document. Owner Signature: Date: Owner Printed Name: or, Authorized Agent Signature: Date: f/a/// Sr— Authorized Agent Printed Name: tin" r Q etdr— RECEIVE CITY OF ASPEN _August130 S. GALENA ST I ASPEN, CO 8148215it 018 ASPEN BUILDING DEPARTMENT w . r-� A L c._.r kV; %11 COMttir? LNITY DEVELOPMENT DEPARTMENT • HOMEOWNER ASSOCIATION COMPLIANC E FORM - _ -rr 11; [I?t: ..il r ,. ! - - i r . .. :_ . :.J_tid. ' r • ( CITY OF ASPEN.: __ . ..:� RECEIVED 130 S. GALENA ST I ASPEN . CO SI /2O18 ASPEN BUILDING DEPARTMENT