HomeMy WebLinkAboutFile Documents.520 W Hallam St.0150.2018 (4).ARBK DATE: b 514,0 MASTER PERMIT: PERMIT NUMBER: 0 50 . ?JO (6.• 4- k.
`3
•
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION THE CITY OFASIti\'
PROPERTY INFORMATION
,
PARCEL ID#
ADDRESS 520 W Hallam UNIT# 273512425005
LOT N and Lot 0 BLOCK 28 TRACT City&Townsite of Aspen
OR SUBDIVISION
OWNER NAME Lamer,Glen&Tracy L CELL 940-37q-6286 EMAIL Sr}*@S- c//ct.(fwisiy IDVI, :.:on.)
NAM �yv„ / Ai Eva r CELLq� -379— 539 p EMAIL am .Qcd��Ie.XYCI04-. om
B
ho,
•
PROJECT DETAILS
DESCRIPTION IL remove s- roof- t i 3�^^ icy , I n4 py m y
WORKPTION F �Ct r > Ir Ia w9r � � f �QSOLI ��fv Si j jk1Sk lIOV jf
VALOUR I —,, 232 qp ra � Use of Bui di g Class of Work nFixture ounts Equipment Checklist
SQ FT OF ❑ Commerical 0 New Toilets,Bidets Forced Air/Gravity Systems
WQRKAREA 3050 — D Multi-Family ❑ Addition Bathtub —
Single Family 0 Alteration Lavatory(Wash Basin) Wall,Suspended,or Unit Heaters
pp Shower
—Gas Log
UNITSQFT 0❑ Mixed Use ❑0RFFR it
Kitchen Sink(+Disposal) Gas Appliancew
LOT SIZE* 6 0a? ❑ Tenant Finish Dishwasher —Appliance Vents
Laundry Bar,Utility Sink Heat,Refrig,Cooling,or
DISTURBED Will there be ❑ Demolition Clothes Washer Absorption Unit
EXTERIOR AREA any roof/wall 0 Change Order Floor Sink _Boilers(includes vent)
penetrations? ❑ __Floor Drain Air Handling Unit
NEW SQ FT , Yes —Water Heater(Pan Req) Cooling Systems
_#Gas Outlets
SQFTOFROOMS NO —Other Range Ventilation Fans
WITH UTILITY WORK Other Range Hood
nn " #of Gas System Outlets
ZONE DISTRICT I` Snowmelt System Sq Ft
H Project Valuation:Cost of project as defined in Valuation Affadavit. NOTICE: This permit becomes null and
0 Sq Ft of Work Area:Total square footage of area undergoing change or reconfiguration. void if work or construction authorized
I— Unit Sq Ft:Gross Square Footage,not FAR,of permitted unit. is not commenced within 180 days,or
if construction or work is suspended or
Lot Size:Total surveyed square footage of property. abandoned for a period of 180 days at
Disturbed Exterior Area:Square footage of lot affected by permit application. any time after work is commenced.
w New Sq Ft:Total added square footage for additions to net livable or net leasble space.
p Sq Ft of Rooms with Utility Work:Total square footage,not FAR,of all rooms with plumbing work.
Re-
FOR CITY USE ONLY APPROVALS viewer
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Departmentr Needse Sign- Approved
Plan Check I•-1 6)... 0 Permit Fee a;- 00
PC X V Parks Impact Zoning l4 sv 5/3 0/
3 0/-8
Engineering Zoning(50%) HPC
g g School Ded. Building k sv 5/3 0/ 18
(50%)CMP
Zoning(50%) Fire
3�1 ., P TDM Impact
l/ Engineering
Energy Code REMP Ped.Amenity CMP
PH 5/31/_3
Water
CMP(50%) 31^1, i t Plan Check(Hourly) Housing Cash in Lieu Stormwater
Parks Review (60, O 0 Zoning Sanitation
(Hourly) Stormwater
Env. Health
Utility Review Engineering City Use Tax Parks X Dr 5/30/18
(Hourly)
i5iii
qo Landscape
GIS County Use Tax
EfficiencxQ
Approved`M 6/1/18
Lot Area Deed Restricted To Issue
M Census Code #of Dwellings Plans Location Issuance k r /v
CITY OF ASPEN December 2017 + ry���• ��
130 S. GALENA ST I ASPEN, CO111 ,18
ASPEN
BUILDING DEPARTMENT
ADDRESS: PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET '
THE CITY OF ASPEN
FOR PLAN REVIEW QUESTIONS •_JJ--
Name A yy1te 4e) 4 P,r Phone cro -31? ®® c1.r$ E-mail(;4fihJ�vx,ak'J r ';,
FOR INSPECTION QUESTIONS �``
Name i i7 'l —�� • _� L! Phoneq�O -3 -8398 E-mai101Y1 .Q11e�C� d '
OWNER
Name G-I e v + Tract1 L •1-0,Yv1 er Phone q}D-3i9-628.6 Cell Phone
Addres 3137E1 In Lee lane {-40o �1
City 0sf n State TX ZIP ��G3
A-dmdes sSIeVe 5 40- 1_ _O'St_K ! ). COvn
OWNER'S AUTHORIZED AGENT
Name Phone Cell Phone
Mailing
Address City State ZIP
E-mail
Address
APPLICATION BEST CONTACT r�
Name Aye. c 4II)(n •er- Phone 9-�o -3/9-8398 Cell P • e
Mailing �0 �>t Sroo
Address ^ ,,�` City *Basalt t State t^O ZIP C�1 bZ
Address a.IM), aIexa iidey c cLIQX renf• Co ►r-
ARCHITECT OR DESIGNER OF RECORD
Name Phone Cell Phone
Mailing
Address City State ZIP
E-mail
Address
CIVIL ENGINEER OF RECORD
Name Phone Cell Phone
Mailing
Address City State ZIP
E-mail
Address
STRUCTUAL ENGINEER OF RECORD
Name Phone Cell Phone
Mailing
Address City State ZIP
E-mail
Address
GENERAL CONTRACTOR7. �t
Name AT.�_! /_ 0/r� / 10 - Phone 930 - 2 *- 36 49- Cell Phone V1.- ���//
Add e� Po City r^�, CO ZIP ett3Z I
C7���-�``,�,, //�� �` ��c.�-�� State
Add esswm • .k V1a --Ems"Gts bf'i' , (�4tn
INSPECTIONS: The General Contractor must schedule inspections online.
Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so.
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the
structure and/or pro' ct is built in compliance with all applicable codes.
Contractor
Signature / / Date
❑ Check i ou area tested o er bul er Ingle-a ily homes only).You must take a test and complete the owner/bui (IA
(CITY E ONLY)Owner builder approved by:
pp Date: Affidavit on e
( CITY OF ASPENAugust2o17 130 S. GALENA ST I ASPEN, CO %5Y611/ )18
ASPEN
BUILDING DEPARTMENT
ADDRESS: PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
SCOPE OF WORK CHECKLIST THE CITY OFASPEN
LAND USE QUESTIONS
If you check any of the boxes below,please consult with the Planner of the Day(planneroftheday@gmail.com) before submitting your
permit application.
Does your permit involve any of the following?
• Part of an approved COA Land Use Review Work involves Landmark Parcel or Historic District
❑ Work affects net leasable, net livable, or ❑ Located in 100-year flood plain or within 100' of high
non-unit space water mark
▪ Work involves lot splitting or combining a lot Work involves changes in occupancy to structure
Et Work involves exterior of structure Changes to elevator or stair configuration
▪ Changing the number of residential units ❑ Changes to the use of existing structure or space
❑ Changes to number or location of
onsite parking
ADDITIONAL SCOPE OF WORK QUESTIONS
Does your permit involve any of the following?
ElExterior lighting added or changed Work involves exterior wall penetrations
ElWork involves roof penetrations Work involves digging or excavation
❑ Work adds, removes, or changes Work involves restaurant or food service
plumbing fixtures
ElDisturbs 1,000 sq ft or more of soil within ❑ Affects parking spaces/meters, loading zones, or alleys
12 months
ElWork occurs in public right of way 1:1Adding structures or systems over utility lines
ElWork affects trees or occurs within the Work within City Mall boundaries
dripline of a tree
CITY OF ASPENAugustz017 130 S. GALENA ST I ASPEN, COLk6AAr 18
ASPErr
BUILDING DEPARTMENT
ADDRESS: PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
ASBESTOS VERIFICATION AND CHECKLIST THE CITY OF ASPEN
ASBESTOS INFORMATION
Asbestos is a known human carcinogen and is an airborne hazard. Once airborne,asbestos fibers can stay suspended in the air for days,
weeks,or even months before settling out of the air.The fibers can easily become airborne again from a minor disturbance like turning
on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos
hazards that could expose people to asbestos in the future,long after the renovation activity occurred.The airborne asbestos fiber
concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home.
The 1989"ban"on asbestos-containing materials is commonly misunderstood. In fact,in 1991 the U.S. Fifth Circuit Court of appeals
vacated much of the so-called "Asbestos Ban and Phaseout Rule"and remanded it to the EPA.Thus,much of the original 1989 EPA ban
on the U.S. manufacturing,importation,processing,or distribution in commerce of many asbestos-containing product categories was
set aside and DID NOT TAKE EFFECT.Therefore,ALL demolition, remodel or renovation projects must determine if disturbed material
above the trigger levels contains asbestos.
ASBESTOS CHECKLIST
❑Yes[N,No
Residertial: Will you be removing more than 32 sq ft, 50 linear feet (e.g., pipe insulation), or the volume
equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel-examples are drywall,
linoleum, ceiling tiles, roofing materials, etc.?
❑Yes No
Comm rcial:Will you be removing more than 160 sq ft, 260 linear feet (e.g., pipe insulation), or the volume
equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel-examples are drywall,
linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.?
If the answer is YES to any of the above,you will need an asbestos test before you can receive a building and/
or demolition permit. You will also need to provide plans indicating areas to be demolished and determine if a
CO state demolition license is required. A state certified asbestos inspector must do this test and the test report
must be submitted with the building permit application. If the building has asbestos, a state certified asbestos
abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building
Department stating that all the asbestos has been removed and that the air is clean. This letter must be received
BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state.
co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof
of current state certification.)
If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the
Aspen permit app. This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE:
A copy of this demolition permit app must be submitted with the initial building permit application. When the
CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our
permit.
I hereby certify that the above information is true and complete.
Owner Phone #
Applicant (print name) e 1CI&Ader es(g/\-� Cd Phone# 91-U-3N-5396
Applicant Signature `, ��_ ^� Date /a-( i
Please call the City o p: Enviro ental Health Department at 920-5039 at any time if you have rrIVE
about asbestos, intere ng your t results, or other matters.
( CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CO glieflf 318
ASPEN
BUILDING DEPARTMENT
ADDRESS: PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
VALUATION AFFADAVIT ASPEN
THE CITY OF
AFFIDAVIT POLICY
All applications for a building permit within the City of Aspen are required to include a certification of
compliance with building permit valuation requirements. The certification must be signed by the property
owner or authorized representative. The following certification shall accompany the application for a permit.
I, the property owner or authorized agent, understand and certify as follows:
City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and
International Building Code (IBC) with certain amendments. These codes define building valuation as follows:
R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a
permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems,
including materials and labor.
109.3 Building permit valuations.The applicant for a permit shall provide an estimated permit value at time
of application. Permit valuations shall include total value of work, including materials and labor, for which the
permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in
the opinion of the building official,the valuation is underestimated on the application,the permit shall be
denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final
building permit valuation shall be set by the building official.
City policy indicates that permit valuation includes materials and labor for the structure and mechanical,
electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as
audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction
such as equipment rental and contractor fees. Finish materials such as paint, floor coverings,tile, cabinets and
counter tops are included in the permit valuation total.
Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development
mitigation fees, trash removal, and cleaning are not included.
I certify that the permit valuation entered on the permit application for this property complies with the above
valuation requirements. I understand that this document is a public document.
Owner Signature: Date:
Owner Printed Name:
or,
Authorized Agent Signature: Date: f/a/// Sr—
Authorized Agent Printed Name: tin" r Q etdr—
RECEIVE
CITY OF ASPEN
_August130 S. GALENA ST I ASPEN, CO 8148215it 018
ASPEN
BUILDING DEPARTMENT
w . r-� A L c._.r kV; %11
COMttir? LNITY DEVELOPMENT DEPARTMENT •
HOMEOWNER ASSOCIATION COMPLIANC
E FORM
- _ -rr 11; [I?t: ..il r ,. ! - -
i r . .. :_ . :.J_tid.
'
r
•
( CITY OF ASPEN.: __ . ..:� RECEIVED
130 S. GALENA ST I ASPEN . CO SI /2O18
ASPEN
BUILDING DEPARTMENT