HomeMy WebLinkAboutFile Documents.110 Coach Rd.0079.2018 (32).ARBK DATE:04/05/2018 MASTER PERMIT: PERMIT NUMBER:0079.2018.ARBK
•
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION THE CITY OF ASPEN
PROPERTY INFORMATION
,
ADDRESS 110+112 Coach Road,Aspen,CO 81611 UNIT# PARCEL ID# 273502303007
7 TRACT Stage Road PUD
LOT BLOCK OR SUBDIVISION 9
OWNER NAME Oyster Shores LLC CELL 970-925-3771 EMAIL vand@reesehenry.com
BEST CONTACT Zone 4 Architects, LLC/Jeff McCollum CELL 970-429-8470 EMAIL jmccollum@zone4architects.com
NAME
PROJECT DETAILS
WORKDESRKIIN DE IL New construction of single-family residence includinglower below grade),entry,and
IN DETAIL 9 Y gr ) y, upper levels New Construction of Accessory Dwelling Unit(AM)including lower storage and crawlspace(below grade)and entry level
PROJECT $7,876,250 Use of Building Class of Work Fixture Counts Equipment Checklist
VALUATION
❑ Commerical ❑■ New 0 Toilets,Bidets X Forced Air/Gravity Systems
WORKA 9,694.9 s.f. 0 Multi-Family `' Bathtub
WORK AREA 0Addition Wall,Suspended,or Unit Heaters
❑■ Single Family 0 Alteration Lavatory(Wash Basin) -�—
UNITSQ FT N/A ❑ Mixed-Use 0 Repair 5 Shower �GasLog
0 0 IFFR 3 Kitchen Sink(+Disposal) yc—Gas Appliancew
LOT SIZE Dishwasher _Appliance Vents
(SQ FT) 155,641 s.f. ❑ Tenant Finish Laundry Bar,Utility Sink Heat,Refrig,Cooling,or
DISTURBED Will there be El Demolition Clothes Washer Absorption Unit
EXTERIOR AREA 27,180 s.f. any roof/wall ❑ Change Order Floor SinkBoilers(includes vent)
penetrations? 0 b X Floor Drain X Air Handling Unit
NEW SQ FT House:7,498.5 sf.;ADU;998.7s.f. ❑� Yes Water Heater(Pan Req) XCooling Systems
1 4 #Gas Outlets
5Q FT OF ROOMS 165.2 s.f. ❑ No Water Treatment Ventilation Fans
WITH UTILITY WORK Other A Range Hood
#of Gas System Outlets
ZONE DISTRICT PD
4 Snowmelt System Sq Ft 3707.2 s.f.
i
N Project Valuation:Cost of project as defined in Valuation Affadavit. NOTICE: This permit becomes null and
Z Sq Ft of Work Area:Total square footage of area undergoing change or reconfiguration. void if work or construction authorized
Unit Sq Ft:Gross Square Footage,not FAR,of permitted unit. is not commenced within 180 days,or
~ Lot Size:Total surveyed square footage of property. if construction or work is suspended or
Y q g p p Y abandoned for a period of 180 days at
Z Disturbed Exterior Area:Square footage of lot affected by permit application. any time after work is commenced. „,
u_ New Sq Ft:Total added square footage for additions to net livable or net leasble space.
p Sq Ft of Rooms with Utility Work:Total square footage,not FAR,of all rooms with plumbing work. Re-
FOR CITY USE ONLY APPROVALS viewer
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Department Needse SOff Ap- proved
Permit Fee PC JB 4/3/18
Plan Check 62950.47 96846.88 Parks Impact Zoning x bn 4/5/19
32915.61 Zoning(50%) 10300.94 HPc
EngineeringSchool Ded.
Building x BM 12/31/18
Zoning(50%) 10300.94 CMP(50%) 5186.83 TDM Impact Fire x BM 12/31/18
Engineering x mh 2/26/19
Energy 14527.03 Ped.Amenity
Code REMP CMP x tk 2/14/19
Plan Check Water x sw 4/3/19
CMP(50%) 5186.83 Housing Cash in Lieu Stormwater x sw 4/3/19
0
(Hourly)
Zoning Sanitation x PM 5/7/18
Parks Review 815.39 (Hourly) Stormwater Env. Health
Utility Review Engineering City Use Tax 81650.63 Parks x Dr 3/15/19
(Hourly) Landscape
County Use Tax X RM 2.21.19
GIs 500 19690.63 Efficiency
Approved
Lot Area Deed Restricted To Issue
434 Census Code # of Dwellings Plans Location Issuance '
( CITY OF ASPENDecember2o17 130 S. GALENA ST CC ASPEN, " dil
110+112 Coach Road
ADDRESS: PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET THE CITY OF ASPEN
FOR PLAN REVIEW QUESTIONS
Name Zone 4 Architects LLC/Jeff McCollum Phone -, -• E-mail jmcco urn • zoneA arc I ec S.com
FOR INSPECTION QUESTIONS
Name Hansen Construction/Blake Hansen Phone • E-mail • ansen . ansencons .com
OWNER
•ys er ores on ac: 'e er van•ome en pecia V anager
Name Phone Cell Phone
Mddresailings c/o Peter Van Domelen; 400 E. Main Street, Suite #2 City Aspen
State CO
ZIP 81611
A
E-mail Address vand@reesehenry.com
OWNER'S AUTHORIZED AGENT
Name Oyster Shores LLC/Contact:Peter Van Domelen Phone Cell Phone
Aaareg c/o Peter Van Domelen; 400 E. Main Street, Suite #2 City Aspen State CO ZIP 81611
E-mail Address vand@reesehenry.com
APPLICATION BEST CONTACT
Name Zone 4 Architects LLC/Contact:Jeff McCollum Phone -• Cell Phone
Mailing PO Box 2508 Aspen State CO ZIP 81612
Address City
E-mail Address jmccollum@zone4architects.com
ARCHITECT OR DESIGNER OF RECORD
Zone 4 Architects LLC/Contact:Jeff McCollum
NamePhone Cell Phone
Mailing PO Box 2508 Aspen State CO ZIP 81612
Address City
E-mail Address jmccollum@zone4architects.com
CIVIL ENGINEER OF RECORD
Name Roaring Fork Engineering/Contact:Tyler Stevens
Phone V V Cell Phone
Mailing 592 Highway 133 City Carbondale State CO ZIP 81623
Address
E-mail Address tylers@rfeng.biz
STRUCTUAL ENGINEER OF RECORD
Name Evolve Structural Design Phone V-V Cell Phone
Mailing 1040 Main Street Carbondale CO 81623
Address City State ZIP
E-mail Address steve@evolvestruct.com
GENERAL CONTRACTOR
Name Hansen Construction/Contact:Blake Hansen Phone • g • Cell Phone
Mailing 310 Aspen Business Center City Aspen State CO ZIP 81611
Address
E-mail Address bhansen@hansenconst.com
INSPECTIONS: The General Contractor must schedule inspections online.
Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so.
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the
structure and/or project is built in compliance with all applicable codes.
Contractor Blake Hansen 3-23-18
Signature Date
❑ Check if you are a tested owner builder(single-family homes only).You must take a test and complete the owner/ to di g'affi �17i1C�
(CITY USE ONLY) Owner builder approved by: Date: Affidavit on file
( CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CC igighe)
,a,i Liy
BUILDING DEPARTMENT
ADDRESS: 110+112 Coach Road PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
SCOPE OF WORK CHECKLIST THE GrYorAsrEN
LAND USE QUESTIONS
If you check any of the boxes below, please consult with the Planner of the Day(planneroftheday@gmail.com) before submitting your
permit application.
Does your permit involve any of the following?
ElPart of an approved COA Land Use Review ❑ Work involves Landmark Parcel or Historic District
❑ Work affects net leasable, net livable, or ❑ Located in 100-year flood plain or within 100' of high
non-unit space water mark
❑ Work involves lot splitting or combining a lot ❑ Work involves changes in occupancy to structure
❑ Work involves exterior of structure Changes to elevator or stair configuration
ElChanging the number of residential units Changes to the use of existing structure or space
❑ Changes to number or location of
onsite parking
ADDITIONAL SCOPE OF WORK QUESTIONS
Does your permit involve any of the following?
• Exterior lighting added or changed ❑ Work involves exterior wall penetrations
❑ Work involves roof penetrations ❑ Work involves digging or excavation
Work adds, removes, or changes ❑ Work involves restaurant or food service
plumbing fixtures
❑ Disturbs 1,000 sq ft or more of soil within ❑ Affects parking spaces/meters, loading zones, or alleys
12 months
❑ Work occurs in public right of way ❑ Adding structures or systems over utility lines
❑ Work affects trees or occurs within the ❑ Work within City Mall boundaries
dripline of a tree
•
RECTA/ELI)
( CITY OF ASPEN
_August 130 S. GALENA ST I ASPEN, CC /E649_112)
,a
BUILDING DEPARTMENT
PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DESCRIPTION FORM - IRC & IBC THE GrYOFASPEN
BUILDING CODE INFORMATION
❑■ 2015 IRC ❑ 2015 IBC ❑ 2015 IEBC 0 Other (Please Explain)
Code Editions (As Adopted and Amended) (As Adopted and Amended) (As Adopted
and Amended)
Fire Sprinkler System I Existing? M°No I Required? M°Neos I Type ❑ NFPA 13 ❑ NFPA 13 R ❑ NFPA 13 D
Type Of Construction ❑ VA ■❑ VB❑ IV ❑ IIIA ❑ IIIB ❑ IIA ❑ IIB ❑ IA ❑ IB Fire Alarms Installed ❑ Yes❑ No
Required Special Inspections ❑■ High-Strength Bolting ■❑ Epoxy Anchors ■❑ Structual Steel Welding
❑ Permanent Micropiles ❑ Sprayed Fire-Resistants 0 Other
Energy Code Compliance 0 Prescriptive Table 0 Other
El RESCheck UA Alternative ❑ COMCheck UA Alternative
Exterior Energy Use Total Approved On-Site Snowmelt 3707.3 s.f. Spa 120 s.f. Pool
(Existing + New)
Building Type/ I ❑ A ❑ B ❑ F ❑ E ❑ R_ I ❑■ One Family ❑ Two Family
Occupancy Group g ❑ B (A<50) ❑ H_ ❑M ❑ S_ R
C ❑ I ❑ U C ❑ Townhouse
UNIT DESCRIPTION AS PROPOSED
Gross Area of Building: 12,008.9 s.f. Gross Area of Unit: •
ADU BUILDING DESCRIPTION
Occupant Load:
Is there an ADU? I] Yes
❑ No
# Stories Above Grade 2 # Stories Below Grade 1 # Living Rooms 1
Attached Garage Detached Garage Carport # Kitchens
Parking Spaces 3 Parking Spaces Parking Spaces # Full Baths
1
# Bedrooms 4 # Full Baths 1 Deck Area 338.3 # 3/4 Baths
# 3/4 Baths 3 # 1/2 Baths 3 # Bed Baths
# Bedrooms �
# Kitchens 1 #Wood Fireplaces 0 #Other Rooms (List)Storage, Laundry
# Gas Appliances 2 # Gas Logs 1
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement Mechanical, Laundry, Bedrooms (3), Bathrooms(3),Walk-In Closets(3), Powder Rooms(2), Kitchenette, Family Room
Main Level Garage, Mudroom, Office, Wine, Powder, Pantry, Kitchen, Dining, Living Room
2nd Floor Master Bedroom, Master Bathroom, Master Dressing
3rd Floor
Additional ADU: Storage, Living Room, Kitchen, Laundry, Bedroom, Bathroom, Closet
RFCEIVEa
Reviewed By: Bonnie Muhigirwa Date: 12/31/18
( CITY OF ASPEN January2018 130 S. GALENA ST I ASPEN, CC /g169.112)
BUILDING DEPARTMENT
1
ADDRESS: PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
HOMEOWNER ASSOCIATION COMPLIANCE FORM THE CrnorATE\
•
All applications for a building permit within the City of Aspen are required to include a certification of compliance
with applicable covenants and homeowner association policies. The certification must be signed by the property
owner or attorney representing the property owner. The following certification shall accompany the application
for a permit.
ADDRESS 110 + 112 Coach Road UNIT# PARCEL ID# 273502303007
I, the property owner, certify as follows: (pick one)
❑ This property is not subject to a homeowners association or other form of private covenant.
❑ This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit do not require approval by the homeowners association or covenant
beneficiary.
El This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit have been approved by the homeowners association or covenant beneficiary.
I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning, or effect
of private covenants or homeowner association rules or bylaws. I understand that this document is a public
document.
Owner Signature Date
Owner Printed Name
OR
Owner's Attorney Signature Date
Owner's Attorney Printed Name
ECFI Elf;
( CITY OF ASPEN January2018 130 S. GALENA ST I ASPEN, CCigighe)
BUILDING DEPARTMENT
ADDRESS: PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
ASBESTOS VERIFICATION AND CHECKLIST THE Cif Y OF ASPEN
ASBESTOS INFORMATION
Asbestos is a known human carcinogen and is an airborne hazard.Once airborne,asbestos fibers can stay suspended in the air for days,
weeks, or even months before settling out of the air.The fibers can easily become airborne again from a minor disturbance like turning
on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos
hazards that could expose people to asbestos in the future, long after the renovation activity occurred.The airborne asbestos fiber
concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home.
The 1989"ban"on asbestos-containing materials is commonly misunderstood. In fact, in 1991 the U.S. Fifth Circuit Court of appeals
vacated much of the so-called "Asbestos Ban and Phaseout Rule"and remanded it to the EPA.Thus, much of the original 1989 EPA ban
on the U.S. manufacturing, importation, processing,or distribution in commerce of many asbestos-containing product categories was
set aside and DID NOT TAKE EFFECT.Therefore,ALL demolition, remodel or renovation projects must determine if disturbed material
above the trigger levels contains asbestos.
ASBESTOS CHECKLIST
❑Yes IDNo
Residential: Will you be removing more than 32 sq ft, 50 linear feet (e.g., pipe insulation), or the volume
equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel -examples are drywall,
linoleum, ceiling tiles, roofing materials, etc.?
❑Yes❑ No
Commercial: Will you be removing more than 160 sq ft, 260 linear feet (e.g., pipe insulation), or the volume
equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel -examples are drywall,
linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.?
If the answer is YES to any of the above, you will need an asbestos test before you can receive a building and/
or demolition permit. You will also need to provide plans indicating areas to be demolished and determine if a
CO state demolition license is required. A state certified asbestos inspector must do this test and the test report
must be submitted with the building permit application. If the building has asbestos, a state certified asbestos
abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building
Department stating that all the asbestos has been removed and that the air is clean. This letter must be received
BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state.
co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof
of current state certification.)
If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the
Aspen permit app. This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE:
A copy of this demolition permit app must be submitted with the initial building permit application. When the
CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our
permit.
I hereby certify that the above information is true and complete.
Oyster Shores LLC/Peter Van Domelen(Special Manager) 970-925-3771
Owner Phone #
Zone 4 Architects LLC I by Jeff McCollum 970-429-8470
Applicant (print name) Phone #
Digitally signed by Jeffrey D.McCollum
DN:cn=Jeffrey D.McCollum,o=Zone 4 Architects,LLC,ou, O 3/21 /18
Applicant Signature Date:201803211144909-0fi00sccm c=US Date //��►►
Please call the City of Aspen Environmental Health Department at 920-5039 at any time if you h ��sgED
about asbestos, interpreting your test results, or other matters.
CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CC
110 + 112 Coach Road
ADDRESS: PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
VALUATION AFFADAVIT THE C,,orASPE
AFFIDAVIT POLICY
All applications for a building permit within the City of Aspen are required to include a certification of
compliance with building permit valuation requirements. The certification must be signed by the property
owner or authorized representative. The following certification shall accompany the application for a permit.
I, the property owner or authorized agent, understand and certify as follows:
City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and
International Building Code (IBC) with certain amendments. These codes define building valuation as follows:
R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a
permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems,
including materials and labor.
109.3 Building permit valuations. The applicant for a permit shall provide an estimated permit value at time
of application. Permit valuations shall include total value of work, including materials and labor, for which the
permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in
the opinion of the building official, the valuation is underestimated on the application,the permit shall be
denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final
building permit valuation shall be set by the building official.
City policy indicates that permit valuation includes materials and labor for the structure and mechanical,
electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as
audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction
such as equipment rental and contractor fees. Finish materials such as paint, floor coverings, tile, cabinets and
counter tops are included in the permit valuation total.
Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development
mitigation fees, trash removal, and cleaning are not included.
I certify that the permit valuation entered on the permit application for this property complies with the above
valuation requirements. I understand that this document is a public document.
Owner Signature: Date:
Oyster Shores LLC/Peter Van Domelen(Special Manager)
Owner Printed Name:
or,
Oigitaliy signed by Blake Hansen
Blake Hansen ON _e.B_bbaaaea�baase O= eeaa,eem,
Hansen ConsVuclion.OU=200 ERR, 3-23-18
Authorized Agent Signature: Date2019 03 23 1e05'690e00 Date:
Authorized Agent Printed Name: Blake Hansen
RECEIVE(I)
( CITY OF ASPENAugust2o17 130 S. GALENA ST I ASPEN, CC /E649_112)
BUILDING DEPARTMENT
ADDRESS: 110+112 Coach Road PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY THE CITY OF ASPEN
Applicability: All development projects must comply with the City's zoning regulations, including height and
location, and are subject to periodic inspection during construction and a final inspection prior to project
completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen
shall verify height and/or location compliance through submission of a survey report.
Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one
foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance
through this method.
In addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/
duplex development or other projects where compliance may be in question. Independent of this policy, all
projects must comply with all applicable zoning limitations.
The Zoning Officer will inform the applicant during building permit review if verification will be required.
However, circumstances may require zoning compliance verification of a project which is already underway.
Timing: Height verification should be accomplished at a point of construction when enough roof structure is in
place to accurately measure the structure yet early enough in the process to still make changes if the structure
is too tall. Location verification should be accomplished at a point of construction when the final exterior of the
structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer
with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to
perform their own verification during construction to ensure the building is progressing to plan, including the
height and location of foundation forms prior to concrete pours.
Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a
structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The
City's Zoning Officer can assist in determining which elements of the structure should be measured and if natural
or finished grade should be used.
The report shall include the following information:
1-A brief cover letter with the building permit number, name of the project, name of the owner and general
contractor, with a written description of the measurement methods including date(s) of measurement.
2-For location verification: A plan drawing showing property boundaries, permitted setbacks, building envelope
(if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all
exterior veneer or other exterior treatments), and the location and dimension of each observed measurement.
3-For height verification: Elevation drawing(s) showing the natural or finished grade of the property, maximum
permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior
sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles,
or other veneer treatments orornamentation), and the location and dimension of each observed pea, f �r�t � r Additional roof plans showing location of measurements may be necessary. � a "
CITY OF ASPEN August2o17 130 S. GALENA ST I ASPEN, Cd
i$�dg9.keJ
PERMIT NUMBER: ADDRESS:
110 + 112 Coach Road
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY THE CIFYOFASPEN
4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/
elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items
unique to the project.
5-The report shall include a written description or drawing notes of the benchmarks or control points used to
establish property boundaries, setbacks, building location, building height,and grades for each measurement.
6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in
the approved building permit set.
7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who
conducted the field measurements certifying that the field measurements areaccurately represented.
Review and Acceptance of Report: The Zoning Officer shall review the report(s) and either confirm the project
conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets
the zoning limitations for the property or shall determine which elements of the project are not in compliance.
The Zoning Officer may request additional information to verify zoning compliance, which may include but is not
limited to additional survey work or a site visit.
All drawings of the survey report must correlate with representations in the approved building permit set for
acceptance. Modifications to field conditions or amendments to the building permit may be required.
A determination of non-compliance shall result in the issuance of a correction notice and possible work
stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the
construction process to minimize disruption to the construction schedule.
Acknowledgment:
Hansen Construction/ By Blake Hansen
I (contractor name) understand this policy. I agree that this project will
comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of
the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this
project complies with all applicable zoning limitations.
Digitally signed by Blake Hansen
BlakeHansen DN C=US E=bhansen@hansenconst com,O=Hansen
Signature:
OU=200 ERR,CN=Blake Hansen
Contractor Signature: Date 2018.03.23 16 03 41-06'00'
Date: 3-23-18
RECEIVE,
( CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, Cd/8SIgake)
Li4
BUILDING DEPARTMENT