HomeMy WebLinkAboutFile Documents.110 Coach Rd.0079.2018 (34).ARBK 2015 IECC RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM
CITY OF ASPEN VERSION 11..E UPDATED DECEMBER 13, 2017
PROJECT ADDRESS: 110 Coach Road,Aspen, CO 81611
Parcel ID#: 273502303007 Permit Number:
CONTACT INFORMATION :
Owner:
Name: OYSTER SHORES,LLC City: ASPEN
Address: 400 E MAIN ST,Suite#2 State: CO
Email: vand@reesehenry.com Zip Code: 81611
Phone: 970-925-3771 Cell Phone:
Owner's Representative:
Name: ZONE 4 ARCHITECTS,LLC(Contact:Jeff McCollum) City: ASPEN
Address: PO Box 2508 State: CO
Email: jmccollum@zone4architects.com Zip Code: 81612
Phone: 970-429-8470 Cell Phone:
A. RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM
Sheets showing snowmelt, pool,spa,and solar/GSHP information: A102,A304a+B
Do you have snowmelt or a spa that has been exempted by the buiding official? 0 Yes(enter sqft below on the exempt row) OO No
Hydro Snowmelt Electric Snowmelt Pool Spa
Existing
To be Demoed
Existing to Remain 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft
New(non-exempt) 3387.30 sqft 80.00 sqft
New(exempt)
Total New 3387.30 sqft 0.00 sqft 0.00 sqft 80.00 sqft
Total on site_ 3387.30 sqft 0.00 sqft 0.00 sqft 80.00 sqft
Total Snowmelt on site_ 3387.30 sqft
Boiler Efficiency 95.0% I 100% 75.0% 95.0%
Mitigation Payment $121,229.68 $ - $ 14,821.05
Total Payment for Mitigation: $ 136,050.74
B. ON-SITE RENEWABLE CREDITS
Supplemental System _ REMP Credit
Use PV Worksheet Photovoltaic System $ 136,061.03
Use Thermal Worksheet Hot Water Panels $Use GSHP Cert Ground Source Heat Pump $ -
Other Approved System $ -
Total Mitigation Credits: $ 136,061.03
Onsite Renewable Offsets: How many Kilo Watts of PV(solar electric)would I need? 19.82
or How many square feet of SHW(solar hot water)would I need? 605.61
R-REMP Payment: $ -
Amount Previously Paid on This Permit:
TOTAL R-REMP PAYMENT: $ -
Refund(includes minus$750): $C. PREPARED BY: Date: 10.05.2018
Print Name: Zone 4 Architects,LLC
Signature: Zone 4 Architects,LLC
Phone&EMail: 970-429-8470/jmccollum@zone4architects.com
REVIEWED: Date: RECEIVED)
10/30/2018
ASPEN
BUILDING DEPARTMENT