Loading...
HomeMy WebLinkAboutFile Documents.520 W Hallam St.0150.2018 (7).ARBK CG4RL/SLE WIP 300HT High-Temperature Protection Self-Adhering ME7aC. f�1tCIOL/CTS Roofing Underlayment =ME WIP 300HT is a high-tensile-strength rubberized asphalt underlayment specifically designed to withstand temperatures up to 250°F(121°C).Ideal for use under metal including copper,zinc and WI P 300HT C0R-TEND(consult technical department for installation instructions),WIP 300HT can also be used under synthetic tiles and asphalt shingles.This strong,skid-resistant membrane is available IMAM ICE mon:moil NIGH-TEMPERATUREPROIECTION I in either black or white and provides superior protection from water penetration caused by wind-driven rain and ice dams. Features and Benefits S nk>f 16AV, Protects the roof structure from water seepage caused by ice ° UL Classified dams and wind-driven rains Resists temperatures up to 250°F without degradation of ° ICC-ES ESR#2206 the adhesive ° 2009 International Building Code"' Seals around roofing nails,staples and screws State of Florida Approved Product FSA#FL6782 ° Bonds directly to the roof substrate for fast and easy installation Meets ASTM D1970 without the need for additional adhesives Split-release film provides easier,faster installation Storage Resists cracking,drying and rotting,providing long-term WIP 300HT roofing underlayment rolls should be stored on end,under cover and in areas where the temperature is between 40°and 100°F waterproofing performance and low lifecycle cost • Concealed waterproofing system will not detract from the (4.4°and 38°C).Do not double stack pallets. architectural aesthetics of the primary roofing system • Exposed rubberized asphalt bead along the membrane edge WtnnL ensures watertightness of lap seams Carlisle WIP products are backed by Carlisle's industry-leading warranty. Visit our website for warranty details. r Ridge Line f Rakef~dge - Skylights •''t„ x iii"h , �� Flashing - Dormers _. , 111 i I, :. , if:. _ _ _ . _ - -- .,, k = Low-Slope ---- Eaves *TAIT MEM • ASPEN • BUILDING DEPARTMENT G4RL/SLE WIP 300HT High-Temperature Protection Self-Adhering METgL �A�DUCTs Roofing Underlayment Installation Metal Roof Underlayment Under water shedding metal roof systems or low slope metal roofs with WIP 300HT underlayment is applied when the roof deck is dry and the substrate temperature is 40°F(4.4°C)or higher.At temperatures a minimum�/z"slope,start at the low point and apply WIP 300HT over the full surface of the roof deck.Review the metal roofing manufacturer's below 40°F,nailing or priming should be used to temporarily hold the instructions for limitations and precautions.Beginning at the eaves,apply membrane in place while adhesion develops.WIP 300HT is designed to be covered with the primary roofing system and should not be exposed underlayment from the low point to the high point of the roof,running the to sunlight for more than 60 days.White underlayment offers exposure roll horizontally. time of 120 days. sl iliilt "atiOilS Moisture Substrate must be free of any moisture.If moisture is present,it may " WIP 300HT should be installed when air,roof deck and inhibit adhesion. membrane temperatures are at or above 40°F(4.4°C). WIP 300HT should not be left exposed to sunlight for more than New Construction 60 days for black membrane or 120 days for white membrane. Prepare the roof deck by removing all loose objects,dirt,dust and debris. ° WIP 300HT membrane should not be folded over the roof edge unless protected by a gutter or other flashing materials. Re-roofing ° The primary roof system must be ventilated to prevent excessive Remove all old materials from the roof deck in the area to be covered with WIP 300HT underlayment.Replace water-damaged sheathing and sweep moisture build-up in the interior structure. roof deck thoroughly. ° Use caution during the installation of the membrane as it may become slippery when wet or covered with frost. Priming ° WIP 300HT must not to be used in contact with flexible PVC material. Priming is not required on clean,dry wood or metal surfaces but concrete masonry,exterior gypsum board and polyisocyanurate insulation should be primed using the appropriate primer or adhesive.Adhesives such as PRODUCT SPECIFICATIONS CCW-702 and CAV-GRIP`'are appropriate and required when temperatures PH N: r, are below 40°F Black/White Engineered Polyolefin Surface 'Composite Film with Factory-applied Valleys, Hips& Ridges Anti-skid Coating Cut WIP 300HT roofing underlayment into manageable lengths.Align over Membrane Rubberized Asphalt the center of the valley,hip or ridge.Remove release film.Press the middle PRODUCT CHARACTERISTICtaRA°TERtartc feet RESULTS of the membrane first before working toward the edges.For open valleys, Roll Length feet 66 cover WIP 300HT roofing underlayment with metal valley liners, Roll Size Roil Size lbs 55 sq/ft 198 Eaves& Rake; Roll Width inches 36 Cut WIP 300 HT underlayment into 10-15'pieces.Remove 2-3'of release TYPICAL PERFORMANCE PROPERTIES ATEST STM D1970 RESULTS 1 film and align the edge of the membrane,sticky side down,so it overhangs Thickness ASTM D1970 40 mils the drip edge by 343"(10 mm).Continue to remove release film and press as Adhesion to Plywood at 75`F ASTM D1970 Low Temperature Flexibility ASTM D1970 35l F you move across the roof.Use a hand roller and/or hand pressure to press 21lbs/ft into place.Overlap end laps a minimum of 6".WIP roofing underlayment Lap Seam Adhesion at 76`F ASTM D1970 bs/ft should reach a point 2'inside the interior wall line.Local codes may require Slip Resistance Around Nail ASTM D1970 Pass additional courses.If additional courses are required,the top lap must be at Slip Resistance 'ASTM D1970 Pass least 3'/z Thermal Stability ASTM D1970 Pass Moisture Vapor Permeance ASTM D1970 0.02 perms Drip EdgesWater Absorption ASTM D1970 0.5% At the rake edge,apply WIP 300HT underlayment first and place drip edge Tensile Strength Machine Direction 'ASTM D412 250 psi on top.At the eave,apply drip edge first and place WIP underlayment on top Tensile Strength Transverse Direction ASTM D412 1390 psi of the drip edge so that it overhangs drip edge by 3/a"(10 mm). Elongation at Break Machine Direction ASTM D412 250°/0 Elongation at Break Transverse Direction ASTM D412 170% For standard installation details,follow the WIP detail drawings.For PACKAGING INFORMATION REnon-standard installation instructions,contact your local Carlisle Boxes(rolls)per pallet CEII/EDResidential representative. 05/25/2018 ASPEN BUILDING DEPARTMENT