Loading...
HomeMy WebLinkAboutFile Documents.110 Coach Rd.0079.2018 (49).ARBK WELS Markup 110 Coach Rd RESPONSES FROM CONNECT 1 DESIGN PROVIDED BELOW. [1] IR-DBX Lot 7-L.2.03 (2) Reference ET Page: [1]• IR-DBX Lot 7-L.2.03 Please include the irrigation valves for each hydrozone, such as: (A3,A7,A8, etc.) ,,„„°r:s'; Author: rickma Wert.Precipitation Date: 2/4/2019 1:04:21 PM Valves added per hydrozone. See IR.0.01. °elf°' File Name: IRRIGATION_10-19-18.pdf Please Include Oe lydgatbn Hydro.. Plant valves for eBCll hydro... such rto(ABAT,AB,etc.) Tree Low Tree Medium Turf Sod C Planting Bed ww/covere otover TOTAL AVERAGE IRRIGATION WATER NE SIZED°SECGONS.°THE`UNSIZED PIPE`SHOULD"NOT BE CONFUSED WITI Page: [1] IR DBX Lot 7-L.2.03 TME DEFAULT PIPE SIZE NOTED I"THE LEGEND. Author: rickma Please add the language of WELS Section 4.3.2 (I&m)regarding disturbance under existing trees s. FOR INSTALL PAREZWIRES FROMCONTROL CCONTROLLERELOCATIONSE TOAEACH DEEAD—El Date: 2/4/2019 1:03:56 PM Notes Seenotes 2 & 3 OF MAINLINE, COIL 3 FEET OF WIRE IN VALVE BON. [YoteJ added. 1 L 1 V on I R.0.01. I"IS File Name: IRRIGATION_10-19-18.pdf Please add the language of) WELS Section4.3. (Iu munder disturbance under existing trees [2] C1D-DBX7-LANDSCAPE SHEETSET-LNTS (1) Page: [2] C1D-DBX7-LANDSCAPE SHEETSET-LNTS e„BBa„eTaBBBT„aTAeB„nTPAeTo.MASS SP_ECIP Author: rickma Revise to be consistent with ISTRUC„e1„r Date: 2/4/2019 1:01:26 PM WELS Section 4.2 e e.TME File Name: L_LANDSCAPE.pdf Revised note. See L.0.01 a ET NO o SHALLON,COST TO THE OWNER.THE COW-EV:OMR THE ENO r i nFILLER 1.0 Wte WEBS Section ...BAAL BART THE PROMO,.BOB BSA SEPAPATE COST OR PRE. MIN WFBINTNE CONSTRUCTION LIMIT LINE SHALL BE LEFT111401STURBED, MILO MBE BE,ECIBBTE WATERING BY THE LANDSCAPE C01,1740EBOR AS BEMIRED 111SYSien IS FULLY OPERATIONAL:Vitt UNTIL FINAL ACCEPTANCE BB . = NEI9L No • KEE, [slTOturvn[x�sgrni= By • uLnw BE REPLACED ag 7HE RESPONSIBLE Pgnary Ai THEIR OWN EggENSE.. • CONC. RECEIVED 02/14/2019 ASPEN BUILDING DEPARTMENT [2] IR-DBX Lot 7-L.2.04 (1) Page: [2] IR-DBX Lot 7-L.2.04 A lockable master valve is required as per WELS Section 5.1.3 Author: rickma 0 Date: 2/4/2019 10:55:18 AM Lockable master valve added. See note 3 on IR.2.01. File Name: IRRIGATION 10-19-18.pdf o��7��' A lockable master valve is q as per WELS ' / Section 5.1.3 c, l vin 0.20 [6] C1D-DBX7-LANDSCAPE SHEETSET-L.2.04 (3) til,N. Page: [6] Cl DDBX7-LANDSCAPE SHEETSET-L.2.04 Consider adding native forbs to the revegetation seed mix to promote more species diversity. REVEGETA Author: rickma \ z` Achnatherur Bromus mar Date: 2/4/2019 11:16:12 AM Seed mix has been revised to match the City of Aspen Seed List & Procedures' Elymuslano File Name: L_LANDSCAPE.pdf "Native Seed Areas Specific to Sage Brush Ecotype". See revised plant schedule on \\ Elymus tract onsider adding a ative fortis to the Festuc Nassella viri L.2.06. revegetation seed mix Pascopyrum \to promote more Pseudoroegi pecies diversity. ................. SOD-ECOI Page: [6] C1D-DBX7-LANDSCAPE SHEETSET-L.2.04 Isn't Ecoloturf a medium water use sod once established? _ Author: rickma 1 C Date: 2/4/2019 11:27:35 AM File Name: L_LANDSCAPE. df Revised to be a medium water use hydrozone. See L.2.06 p Isn't Eeoloturf a medium i:i*d water used? once � established? M `4 � ,r Page: [6] C1D-DBX7-LANDSCAPE SHEETSET-L.2.04 Why are P.virginiana, P.tremuloides, and P. ponderosa on "temporary tree drip-low" in Hydrozone 3? I 3 17. Author: rickma _=_f ,' )I r, '+ Date: 2/4/2019 11:27:41 AM Temporary removed from legend. Theseplants will likely � �6- File Name: L_LANDSCAPE.pdf p rY g .�/ , �t 2 ,'.' - be removed from irrigation after 3 year growing season oa establishment however. See L.2.06 , ..wo. RECEIVED 02/14/2019 ASPEN BUILDING DEPARTMENT