HomeMy WebLinkAboutFile Documents.36 Ute Pl.0019.2017 (6).ARBU ,
PERMIT#:
BUILDING PERMIT APPLICATION CHECKLIST
litii
!RC: Single Family, Duplex & Townhome
THE CITY OF ASPEN
i
For Building and Permit Information,please refer to our website at: i
www.aspenpitkin.com
JOB ADDRESS * 7 1 V1.Apcto PARCEL I.D. NUMBER 17 '1 tg 4— I
` i
OWNER .�L ,\l DATE OS ' ri i i 1
1
i,
The following are requirements for various types of projects. Permits must include ALL of the items
on this checklist or they will not be accepted. Incomplete permits will be turned away. Refer to
the Single Family & Duplex Building Submittal Guide and guides from other referral departments for
clarifications and descriptions on each item.
D Be prepared to pay submittal fees at permit submittal. Contact a permit coordinator for a fee estimate.
D Submit a flash drive or disc with a copy of all documents and drawings in pdf format.
3
8 1/2" x 11" Docume - se- -ub 'ttal guide for number of copies) j
Submittal New Addition ,Iteration Interior Demo Repair
Requirements Construction I Remod- only partial or
Alteration complete
Planning Approvals -V❑ -V❑ " \e,,,,D V❑ V❑ -V❑ 1(
11
Permit Application
Form &Contact d° -V❑ id, -s/❑ -V❑ -V❑
Sheet
i
Valuation �r
Adjustment Affidavit V o V❑ -V❑ V❑ U
& Construction Bid li.
HOA Certification ° -V° ❑ ✓❑ -V❑ }/❑ f{l
IRC Building ij�
Description Form ° ° ��' ° ii
Asbestos i
Questionnaire ° ° V° V° i
Asbestos test and V° El ° ❑ ❑V
clearance reports i
ili
State Asbestos
Demolition Approval V❑ 11
Notice i
Fireplace N
Registration Form & 1(
Manufacturer's -V❑ V❑ ✓❑
11
installation k
instructions I;;
Energy Code V° V a J°
Compliance ° [
Non Vented Roof -V❑ -V° M El
Assembly Caics !�
tor
Fenes
Fenestration Docs -V❑ -V❑ R
.('°- -tu\i2 re -
,„
6/29/2014 Page 1 of 2il
I
I
Received
2/27/17
Submittal New Addition Alteration/ Interior Demo Repair
Requirements Construction Remodel only partial or
Alteration complete
RREMP documents -❑ V❑
Line Grade
Verification Form V❑ V❑
Verification of
❑Structural Integrity
Soils Report V❑ ✓❑ _ -
Smuggler Superfund .
Soil Removal Permit -/❑ -/❑ V❑
Signed Special fi
Inspection and
Testing Agreement ❑ V❑ U V y V❑
Mechanical Docs - V❑ 1/❑ V❑ 1/❑
Photos Vu Vu V❑ -❑
Unit/Building .
I
relationship V❑ V❑ V❑ V❑ V❑
24"x36" (2 COPIES) & 11"x17" (1 COPY) Plans
Sheets must be in the following order. Existing plans required for all additions &alterations
Submittal New `Addition Alteration/ Interior Demo Repair i
Requirements Construction Remodel only partial or
Alteration complete
Cover Sheet V❑ V u. V u V❑ g
Survey -1/4/❑ "/❑ 1/❑
Excavation/ Earth -/❑ V a
Retention Plans
Site Plan Vu 7/❑ 1/0 V❑ V❑
RREMP Plan Vu -❑ V❑ V❑ €
Area Sheet -V 0 1/❑ 1/❑ V i 1 z
Floor Plans • -/❑ V❑ -/❑ ✓n 1/0 1/0
Roof Plan • Vu 1/❑ V❑ l
Elevations -/D 7/❑ V❑ V❑ `
Sections V❑ V❑ -❑ 1/❑ • ly
Details -/❑ V❑ V❑ V❑ V❑ i
Fireplace Details V❑ V❑ V❑ V❑ t
Schedules V❑ V❑ -'I V❑
Reflected Ceiling V❑ V❑ V❑ J •
Plans
Lighting Plans V❑ V❑ V❑ V o Ii
Mechanical Plans -V❑ — r4
Structural Plans ✓❑ V❑ V❑ V❑ ❑ i
Radon Plan }/❑ V❑
- 1,
' - ?I
i
1
I
i
F
6/29/2014 Page 2 of 2 ili
il
Received
2/27/17
k
i