Loading...
HomeMy WebLinkAboutFile Documents.36 Ute Pl.0019.2017 (11).ARBU Fitzgerald Landscaping, Inc. PO Box423 Vah Estimate iTiG(RinDAspen Colorado 81612 Date Estimate# L fl n DS C I P 1 Il G 9709203005 infofitzgeraldlandscaping.com 2/16/2017 2301 www.fitzgeraldlandscaping.com Name/Address 10/36 Ute Place Aspen,Colorado 81611 Attn: Danielle Nussmeier RCLA Planting Plans Description Qty Rate Total Mobilization I 460.00 460.00 Trees-4'Min Montgomery Spruce to be planted street side- 8 950.00 7,600.00 Includes all Labor and Materials Trees-7'Min Montgomery Spruce to be planted street side- I 1,250.00 1,250.00 Includes all Labor and Materials(Based on current availability) Trees- 18'Min Colorado Spruce to be planted street side-Includes 1 4,350.00 4,350.00 all Labor and Materials(This involves the use of a tree spade to plant the Spruce. If it is determined that the tree spade is not feasible,then a change order will be submitted for planting the tree.) Delivery of Materials I 250.00 250.00 Clean up of entire Site I 460.00 460.00 Dump Fee 1 150.00 150.00 Project Manager for Entire Phase 1 400.00 400.00 Note: If it is determined that there is a excess of roots in the way of planting additional labor hours will be billed on a Time and Materials Basis. Sod that needs to be replaced will be billed on a Time and Materials Basis. 50%deposit required upon acceptance of estimate and balance upon completion. Total $14,920.00 Received 2/27/17