HomeMy WebLinkAboutFile Documents.36 Ute Pl.0019.2017 (11).ARBU Fitzgerald Landscaping, Inc.
PO Box423 Vah Estimate
iTiG(RinDAspen Colorado 81612 Date Estimate#
L fl n DS C I P 1 Il G 9709203005
infofitzgeraldlandscaping.com 2/16/2017 2301
www.fitzgeraldlandscaping.com
Name/Address
10/36 Ute Place
Aspen,Colorado 81611
Attn: Danielle Nussmeier
RCLA Planting Plans
Description Qty Rate Total
Mobilization I 460.00 460.00
Trees-4'Min Montgomery Spruce to be planted street side- 8 950.00 7,600.00
Includes all Labor and Materials
Trees-7'Min Montgomery Spruce to be planted street side- I 1,250.00 1,250.00
Includes all Labor and Materials(Based on current availability)
Trees- 18'Min Colorado Spruce to be planted street side-Includes 1 4,350.00 4,350.00
all Labor and Materials(This involves the use of a tree spade to
plant the Spruce. If it is determined that the tree spade is not
feasible,then a change order will be submitted for planting the tree.)
Delivery of Materials I 250.00 250.00
Clean up of entire Site I 460.00 460.00
Dump Fee 1 150.00 150.00
Project Manager for Entire Phase 1 400.00 400.00
Note:
If it is determined that there is a excess of roots in the way of
planting additional labor hours will be billed on a Time and
Materials Basis.
Sod that needs to be replaced will be billed on a Time and Materials
Basis.
50%deposit required upon acceptance of estimate and balance upon completion.
Total $14,920.00
Received
2/27/17