HomeMy WebLinkAboutFile Documents.121 S Galena St.0083.2018 (2).ACBK RALLY I DUPPS
EMIEEM
POB 3662
Aspen, CO 81612
Phone 720 481 7353
August 27, 2018
RE: Responses to Building Comments 1 sent by Justin Hahn re: 121 S Galena St
Permit # 0083-2018-ACBK
Responses;
Comment #1
All doors are now 32" clear measured from the face of the door with the door at
90 deg per IBC 1010.1.1. Please ref. drawing 3/A1.01
Comment #2
The notes have been revised and the reference to the sink has been removed.
The clear space for the dishwasher has been moved to show the door in the
open position. Please ref. drawing 3/A1.01
Comment #3
The requested dimension has been added to the shower. Please ref. drawing
3/A1.01
Comment #4
A side sink elevation that demonstrates proper knee and toe clearance has been
added. Please ref. drawing 3/A1.01
Comment #5
The grab bars have been moved to just under 36" high. Please ref. drawing
3/A1.01
Comment #6
The scale notation has been revised to 1/2"=11-0". Please ref. drawing A1.02.
Comment #7
The sink location has been revised to 15" centerline from sink to wall. Please
ref. drawing 3/A1.01
Please let me know if there is anything else I can provide.
All the best,
Rally Dupps RECEIVED
08/27 /18
ASPEN
BUILDING DEPARTMENT