HomeMy WebLinkAboutFile Documents.1112 Waters Ave.0089.2017 (10).ARBK 0089-2017-ARBK_BuildingComments_1
2015 REScheck_05-15-17_signed.pdf(2)
Page: 1
- N - File Name: 2015 REScheck_05-15-17_signed.pdf REScheck sh R50 cavity
Subject: PlanCheck insulation ' oofs. Plans show
- - _ Author: nickt R47. C rdinate.
�-•TEfftg_..,e ._ _... Color: ■
1 MECHANICAL + ARCH - RE: update
"B 1.REScheck_11-29-17_stamped-signed.rck" +
"A501"
Project 1112 Waters Ave Page: 1
REScheck must ss by at least
File Name: 2015 REScheck 05-15-17 signed.pdf
REScheck moat pass _ _
mi ° byMleasl2bbeller 2% better t code(Ordinance
.ha=�da,ordnan=a Subject: PlanCheck
Author: nickt 40, 201
::,.;zm"` Color: ■
=ara,r am®.eE..RMA: tr<rx s 2 MECHANICAL - RE: updated
rtoltI111Yt,,, "B1.REScheck_11-29-17_stamped-signed.rck"
;1 :7. l,'S,,,,.,...°.... .�.,�. -'---- Currently 4.2% better than code.
Pnvelnoe Assemblies
P Permit set 05.05.17.pdf(31)
Page:A001
File Name: P Permit set 05.05.17.pdf Provide the original copy of an
Subject: PlanCheck approved state demo ' se.
Author: nickt
Provide the original copy of an approved state Color: ■
demo license.
3 GENERAL CONTRACTOR - Provide docu tation as
requested by time of Permit Issuance.
Page: Pl Confirm that the exte ' steps at
_ _ �i
File Name: P Permit set 05.05.17.pdf
01
Subject:
PlanCheck the hot tub conta' my 3 risers
_: _ as noted on t civils. If 4 risers,
Author: nickt
Color: • a handrail be required.
exterior 4 ARCHITECT - There are 3 risers, last riser ead shown is a
Maosteps aonly
hot tub contain only3 j
_—_ ris noted on Me /
______---=EFlteaa�.a material change @ grade.
required
l II be ��,
regetrea.
RE: A101
Page:A104 At door 111 B i e garage,
0 10 File Name: P Permit set 05.05.17.pdf
\\1 � provide the fight from landings
eA �� Subject: PlanCheck p p
91 -.gyp%! Author: nickt to to of eshold. Provide to
f� 'i' Color: • of con ete at perimeter. Civils
�' sho exterior patio grade as
`� 5 b ' g equivalent to arch 100'.
o- - ARCHITECT - Information Added.
0Eiii a°�- RE: A104
RECEIVED
12/07/17
ASPEN
BUILDING DEPARTMENT
Page:A105
° File Name: P Permit set 05.05.17.pdf Provide the finish levation of
�_ _ Subject: PlanCheck the deck at the or landings.
o- Alp, Author: nickt 1/8" per foot r' ing from 110' 11
° �/'0 ,, _ — Color: ■ 1/8"seems a it will end up
higher th the interior finish
��►_1e z A ' � 6 floor. Pr ide threshold heights
a \`�1rp'�v . as
'0 M 4 w+i, I =i ARCHITECT - Deck drain slope accounted r.
T —0 " RE: A105
Page:A301
File Name: P Permit set 05.05.17.pdf Indicate in your sections and
Indicate in your sections and details how you will Subject:Air sealing general note details how you will accomplish
accomplish the air sealing requirements of 2015 IECC Author: nickt the air sealing requirements of
table R0g2.6.1.1.Intlirate the mntinu'Ty of the air beteer
and where it s located throughout the building.Note 2015 IECC table R402.4.1.1.
whit comporequireeinclde intheairparriersucha Color: •
which components are Included in the air barrier such as
spray foam,gypsam,M1e°aewrap.anm°r eaedor Indicate the continuity of the air
insulation.You may have all of the above but you need to
i one continuous barrier and slick to it.It needs to 7 ARCHITECT - Removed "Batt barrier and where it is located
fallow the thermal Lanier.The better to it.Iyou ds to e.
the easier it be for the contractor and inspector to be throughout the build'.. ote
essful.TM1is to new 2015 code requirement in lieu
otabl°war door teat. Insulation" option on wall assemblies.
p locations that req ' e caulking,
Spray foam provides continuous air sealing,taping, • c. Note which
barrier. RE: 2/A502, 5/A502. components . e included in the
air barrier s,ch as spray foam,
gypsum, .usewrap, and/or
Included diagram of air barrier + note exterior' sulation.You may
on sections: have a of the above but you
RE: 2/A301 need . pick one continuous
bard,r and stick to it. It needs to
foil. the thermal barrier. The
be er detail you provide,the
e• ier it will be for the contractor
:nd inspector to be successful.
This is a new 2015 code
requirement in lieu of a blower
door test.
-. j r, a i Page:A302
PI mhi File Name: P Permit set 05.05.17.pdf Detail oh ition
III 1g4 Subject: PlanCheck showingan the v insulatiorhagcon value
El N
F ��...� _ Author: nickt (matching the RES eck)and
�+ .w.® the continuity of e thermal
I Color: ■,...•
envelope and r barrier.
piiiIIII72-7" Mil
__ 4 n_w� 8 ARCHITECT - Detail added.
oar.
11l RE: 5/A503
(1 , Page:A302 2/A503 doe of match the
2IA503 dcea n°, II File Name: P Permit set 05.05.17.pdf
shomatcwh the
on 1/A302.n II Subject: PlanCheck conditi hown on 1/A302.
Provide another detail s Pro ' e another detail that does.
that does. I Author: nickt
l re a Color: •
m r 9 ARCHITECT - Detail added.
Wi 1108•0�_ RE: 6/A503
R�F_
1.11
LIVING
RECEIVED
12/07/17
ASPEN
BUILDING DEPARTMENT
Page:A302 Detail the rim ' ' t intersection of
DROPPED CEILING,RE:RCP File Name: P Permit set 05.05.17.pdf the exteri all. Show continuity
PANTRY Subject: PlanCheck
Detail the rim joist of the I envelope and air
intersection of the Author: nickt
exterior wall.Show
continuity of thermal Color: •
b er.
envelope and air
barrier. PM
10 ARCHITECT - Detail Added.
DROPPED CEILING,RE:RCP ",��/ RE: I/A503
I Page:A303
File Name: P Permit set 05.05.17.pdf Should this detail lout be for
GRADE OFFSET Should this detail 2/A503?
callout be for 2/A503? Subject: PlanCheck
o=__ Author: nickt
-- . .. .m.- . ._ Color: ■
Tic
p1 11 ARCHITECT - Corrected.
IIII - WI RE: 2/A503
ITS,RE STRU•I
I I i _ Page:A303
I '� I File Name: P Permit set 05.05.17.pdf Revise section 2/A30. to match
— ,I�� Subject: PlanCheck the structural dra gs, showing
---x. M .._ Author: nickt the micropile w. . Demonstrate
",;',a_MI how
Color: • how you will • ovide foundation
------ g __ dampproo' g in accordance am_
12 ARCHITECT - Detail Added. with 20 : IRC R406. Show the
RE: 10/A503 conti•4 ity of the thermal
�Ga,aae a.„ e elope and air barrier.Any
0 aroaLNonna,cti •ap in the thermal envelope
must be accounted for in
REScheck.
1 Page:A501
RYo.ALF File Name: P Permit set 05.05.17.pdf Provide docu ation that the
Subject: Class A Roof roof assem is Class A. This is
Author: nickt typically her an ESR or UL
Provide documentation that the roof report evise you roof detail to
assembly is Class A.This is typically either Color: •
an ESR or UL report.Revise you roof ma the report. (Ordinance 40,
detail to match the report.(Ordinance 40,
2016) 13 ARCHITECT - Updated assembly R1 2 6)
FLAT ROOF WITH METAL RE: 3/A501. SEE Exhibit
"B13.1-ESR-2053" for Versashield
evaluation report.
— �o� I Page:A503 Provide an as bly detail of
d•an• •m„y File Name: P Permit set 05.05.17.pdf
detail offloor Foon Subject: PlanCheck floor F6 on 01.
Asot.
MI:� Author: nickt
PEn�" a Color: ■
14 ARCHITECT - Corrected to indicate F4.
1`� _.II_rii m_ Dr... I Z" RE: 1/A503
►� 141 Dare: BM
—�11_ Aar
RECEIVED
12/07/17
ASPEN
BUILDING DEPARTMENT
2 SHADE POCKET Page:A503
AE' File Name: P Permit set 05.05.17.pdf Provide assembly detail of
Subject: PlanCheck floor F on A501.
A501.
Author: nickt
m� „� Color: ■
19 I
2 15 ARCHITECT - Corrected to indicate F3.
=tom "L� "— RE: 1/A503
FIESEk
• Page:A503
File Name: P Permit set 05.05.17.pdf Show all insulati and air
p sealing on 1/ 03.
Subject: PlanCheck
Author: nickt
Color: ■
show all lingon1/Anand 16 ARCHITECT - Corrected.
air sealing on 1/AS03.
NTERIOR TRANSITION RE: 1/A503 + 2/A301
Page:A504 Indicate air se g on 5/A504.
®HEAD(d�LIFT&SLIDE File Name: P Permit set 05.05.17.pdf
`J Subject: PlanCheck
Author: nickt
- . m Color: ■
-- �, 17 ARCHITECT - Corrected.
RE: 5/A504 + 2/A301
Sill aIIsrxsIInF U,
Page:A602 The email from Dyn mic
File Name: P Permit set 05.05.17.pdf
Subject: PlanCheck Windows suggest that some of
Author: nickt your windows m be site built.
Color: • Verify that the are factory
— assembled d will have NFRC
18 DYNAMIC WINDOWS/DOORS - labels on em stating U-factor
or prov' e a CMA certificate or
Documentation Provided. ASH E calculations
RE: B18.Dynamic Email de nstrating the U-factor.
Page:A602
File Name: P Permit set 05.05.17.pdf Note the skylight aterials,
Note the skylight materials, Subject: Skylight including the t ' kness of the
including the thickness of the interlayer. 2 5 IRC R308.6
interlayer.2015 IRC R308.6 Author: nickt
requires a minimum 0.03" Color: • requires inimum 0.03"
polyvinylbutryal interlayer,unless
polyvin utryal interlayer,
the skylight is 16sgft or less and is
less floor, he lit above theinterior 19 VELUX - Documentation Provided unle the skylight is 16sgft or
floor,then it may have a 0.015"pvb
interlayer.Provide a detail of the le and is less than 12'above
curb(minimum height 4"). RE: B19.1 FCM... + B19.2 FCM... e interior floor, then it may
ARCHITECT - Detail Added. have a 0.015" pvb interlayer.
RE: 7/A505 Provide a detail of the curb
(minimum height 4").
RECEIVED
12/07/17
ASPEN
BUILDING DEPARTMENT
.; d „ /,i Page: C-103
- File Name: P Permit set 05.05.17.pdf Detail the permea a snowmelt.
Subject: PlanCheck Show thickness insulation and
_„ Author: nickt
detail how it ' be made 30%
���� Color: • open (perm ble).The area
r'\" weighted erage must be R-10
minim ,which typically
20 CIVIL - Corrected, this project no longer requ' s at least 3"of R5/inch
contains pervious snowmelted surfaces. in ation. If holes are made,
RE: C103 at size and spacing? If gaps,
what size?
u I I Page: EL101 A minimum of 7 /°of all lamps
/ File Name: P Permit set 05.05.17.pdf
Subject: 75% high efficacy lamps installed in per anent light
Author: nickt fixtures must e high efficacy in
A minimum of75%of all lamps dwelling u 's. Note this
installed in permanent light fixtures (color: •
must be high efficacy in dwelling require nt on the plans. (2015
units.Note this(2015IECCR404.1 C4n 05 21 ELECTRICAL — Note added. IECC 04.1 &C405.1
e
plans.(2015 IECC R404.1&C405.1) )
RE: updated EL101 for note + E001 for
efficacy calculations totaling 94%.
Aspen,Colorado Page: GRADE-1
File Name: P Permit set 05.05.17.pdf Structurals show t icropile
Subject: PlanCheck wall as perm nt; revise.
Author: nickt
Temporary Microplle Wail• Color: •
22 STRUCTURAL - Corrected to temporary micropiles:
roAii
RE: S101 + 9/S203
rary Micropile Wall-Cover GRADES.Temporary Micro'
ary Micropile Well-Location GRADE-5.Temporary Micro'
a TamPparyMpmp,awaneugrpaamaaa Page: GRADE-4
, File Name: P Permit set 05.05.17.pdf Permanen icropiles must be
--- •�P °------------ �.••••,�...•w�.m Subject: PlanCheck design with a minimum safety
Author: nickt factor f 2 (2015 IBC
" Color: ■ 18 .3.3.1.7).
a°zlp,aee
23 STRUCTURAL - Corrected to temporary icroplies:
RE: S 101 + 9/S203
4.0 Spadel Provlaipro
Page: L501
File Name: P Permit set 05.05.17.pdf Area weighted average of R10
IIIIIIIII .° - Subject: PlanCheck insulation requir d under
11111111l �#1 "" m Author: nickt pervious sno elt-this will
loll" W�. require at le st R-15. See other
;; s: Color: ■ q
.-_ 3 i comment.
a• - "- N 24 LANDSCAPE + CIVIL - This project no longer c tains pervious
g, snowmelted surfaces.
RE: L501 + C103
RECEIVED
12/07/17
ASPEN
BUILDING DEPARTMENT
Page: M101
File Name: P Permit set 05.05.17.pdf Underground ductwor must
__�—
Subject: PlanCheck comply with 2015 I 603.8,
" 11„ .� Author: nickt including the folio ng:
� Color: •■ -Ducts must hav: a protective
\ F ;� a is coating or be c. pletely
\— 0W' i encased in 2" r concrete.
� , 25 MECHANICAL - Included in Plan
\ " r 'h ° T== = Notes, SEE: updated M101 Ducts must r-ca.
at 1/8" per foot
p minimum spe to a point
° provided . ith access. Show and
demon- rate all of this on the
plans
-D s outside the thermal
- elope must be insulated to
--6 (2015 IECC 403.3.1).
Page: M102
l' Iih, File Name: P Permit set 05.05.17.pdf Show the dryer ct routing,
p Subject: PlanCheck
length, an ent termination.
'PIMA
Author: nickt
'I ! �C�I — I� .°.:° Color: •
MINIMS 26 ARCHITECT - Included on A107 + A202
11110. I MECHANICAL - Included in Plan Notes, SEE : M101
n
$,4 Pa
Filege:Name:M103 P Permit set 05.05.17.pdf Mec ical plans show 1154
Subject: PlanCheck sq snowmelt.This doesn't
` Author: nickt tch A-102. Please make them
11, SNOWNELT ZONE SCHEDULE olor: ■ atch.
MD ..—. rto : i�r.'Fa �K2i'I'P. : iUpo
C
ij w - _ r : ': w;i 27 MECHANICAL - Corrected, SEE: M103 + M104
JI
Page: M104
File Name: P Permit set 05.05.17.pdf Revise the mechanical plans to
Subject: PlanCheck show all intakes and ex s.
Author: nickt Dimension distan rom
Revise the mechanical plans to show Color: • openings an operty lines.
all intakes and exhausts.Dimension
distances from openings and
property lines. 28 ARCHITECT - RE: Z115 + A/Elevations
MECHANICAL - RE: M104
--rr - - _ ,- Page: M105
File Name: P Permit set 05.05.17.pdf Provide makeup air r the
u ¢ kitchen hood exh st.Your note
Subject: PlanCheck
�r p,g„ ��„�rw,:,�„„:=7.7 Qi Author: nickt states it is inter cked with FC 4
Q' Color: • but there is FC-4 in the
schedule plans.Also, FC-1 is
t7G0FiFt i -
29 MECHANICAL Corrected RE: M105 not sho in the plans.
no rc4.1 the
.d.
•sr
II
RECEIVED
12/07/17
ASPEN
BUILDING DEPARTMENT
Page: M105
File Name: P Permit set 05.05.17.pdf Revise the mechani plan to
Subject: mech design temps list the winter and - mmer
Author: nickt indoor and outdo,,r design
Color: • temperatures. i st fit within the
following parar eters:
30 MECHANICAL - Included, RE: M101 -Winter indo• temp may not be
above 72 d:. F (2015 IECC
R302.1)
-Winter i .00r temp may not be
fIrt"-\ below .: deg F (2015 IRC
R303 .) -Summer indoor temp
may of be below 75 deg F
(2S. 5 IECC R302.1)
- mmer outdoor design temp:
deg F(Ordinance 40, 2016)
-Winter outdoor design temp: •2015
deg F(Ordinance 40, 2016)
Page: M105
File Name: P Permit set 05.05.17.pdf Provide a narra ' describing
Subject: PlanCheck the sequen f operation of the
Author: nickt various C systems.
Color: ■
31 MECHANICAL - Included, RE: M105
reurr°�o,.r„r m,,..a •ra, wr,,.r,rr Page: M105
File Name: P Permit set 05.05.17.pdf Provide a balanced who house
Subject: Balanced Whole House Ventilation mechanical ventilatio• ystem
w,°`roP Ttl1e1"°°" P6F1•^ `�•' complying with Or, ance 40,
Author: nickt
_;°^�• Color: • 2016. Show th- •cation of all
eaa equipment a•: intakes and
32 MECHANICAL - Included, RE: M101
exhausts. dicate the rate of air
supplie. .nd exhausted. Show
your •.Iculations using this
e..ation:
in vent rate=((0.01 x floor
area)+ [7.5 x(#bedrooms+ 1)])
x 0.75
'arm m°bars label ''LVLLL(IamiaaredV ear Lumbar)are to haveabenrting capacity Page: S100
emo thick.f AS E6 psi.. File Name: P Permit set 05.05.17.pdf Revise structural spets to
modulus APA turd-Floor,APA rated at]A"ox.,tongue and groove,Exposure I.
8"Uir.sheaNiag,APAra d402g.Expoarel Subject: Special Inspection Program include a specia spection
Author: nickt program as re ired by the
Revise structural sheets to Include a special special inspe ion agreement.
inspection program as required by the special Color: •
inspection agreement.List all items that require List all items at require special
special inspection and whether they require periodic
PBS°°n°ocsudingthepermaent opiles. 5 33 STRUCTURAL - Included, SEE general
ntinuousin including tioninmanedan erwith2 inspection d whether they
notes on: S100 + notes on relevant require pe odic or continuous
inspecti in accordance with
sheets stating items that require special 2015 C 1705, including the
Inspection. permanent micropiles.
RECEIVED
12/07/17
ASPEN
BUILDING DEPARTMENT