HomeMy WebLinkAboutFile Documents.1112 Waters Ave.0089.2017 (18).ARBK PERMIT#:
BUILDING PERMIT APPLICATION CHECKLIST
IRC: Single Family, Duplex & Townhome
THE CITY OF ASPEN
For Building and Permit Information, please refer to our website at:
www.aspenpitkin.com
JOB ADDRESS ///2 WPIThil(NI, ptitf
j CO. PARCEL I.D. NUMBER 073 7 1 6 Z. C 60/ 2.-
OWNER WI- aJ 9-r64( 4-0F, 1 DATE
The following are requirements for various types of projects. Permits must include ALL of the items
on this checklist or they will not be accepted. Incomplete permits will be turned away. Refer to
the Single Family & Duplex Building Submittal Guide and guides from other referral departments for
clarifications and descriptions on each item.
❑ Be prepared to pay submittal fees at permit submittal. Contact a permit coordinator for a fee estimate.
❑ Submit a flash drive or disc with a copy of all documents and drawings in pdf format.
8 1/2" x 1 1 rr Documents (see submittal guide for number of copies)
Submittal New Addition Alteration/ Interior Demo Repair
Requirements Construction Remodel only partial or
Alteration complete
Planning Approvals -VA( -V°
Permit Application
Form & Contact VX -V° -V❑ V° -sht V°
Sheet
Valuation
Adjustment Affidavit Vg -/❑ V I:l V❑
& Construction Bid
HOA Certification NO( V o V° V❑ V V❑
IRC Building VV._ V o V o °
Description Form
Asbestos ❑ -V°
Questionnaire ° °
Asbestos test and -V° V ❑ V ❑ V °
clearance reports °P�
State Asbestos
Demolition Approval VX-
Notice
Fireplace
Registration Form &
Manufacturer's -V A..,_ V o -/❑ V❑
installation
instructions
Energy Code V❑ V° -V❑ V°
Compliance
Non-Vented Roof -V
Assembly Calcs V° V°
U-Factor
Fenestration Docs VX- V n V o
6/29/2014 Page 1 of 2
Received
5/15/17
Submittal New Addition Alteration/ Interior Demo Repair
Requirements Construction Remodel only partial or
Alteration complete
RREMP documents V r -/❑ 1/o
Line Grade
Verification Form AM- -V o
Verificatio V❑ V❑ V❑ -V❑
Structural I tegrity
Soils Report -V) V o
Smuggle4rfund
Soil Rem Permit V u V II V o
Signed Special
Inspection and V IX J
Testing Agreement
Mechanical Docs VX V c V o V❑
Photos V❑ 1/0 1/0 1/0
Unit/Building
relationship V L, V I J❑ n ❑
24"x36" (2 COPIES) & 11"x17" (1 COPY) Plans
Sheets must be in the following order. Existing plans required for all additions & alterations
Submittal New Addition Alteration/ Interior Demo Repair
Requirements Construction Remodel only partial or
Alteration complete
Cover Sheet V i . V❑ -/❑ V❑
Survey Vlif V❑ V❑
Excavation/ Earth V lac V❑
Retention Plans
Site Plan VK V❑ V❑ V❑ -/❑
RREMP Plan -/K V❑ V❑ V o
Area Sheet V LIC V❑ ,/❑ -/❑
Floor Plans Ahir V o V❑ -V o V❑ V❑
Roof Plan V V -/❑ V❑
Elevations -/eir V❑ 1/❑ V/❑
Sections V V o V❑ V❑
Details VV V❑ -/❑ -/❑ V❑
Fireplace Details -V ig V❑ V❑ V❑
Schedules Vvf -/❑ -/❑ ,/❑
Reflected Ceiling ,/ t V❑ -/❑ V❑
Plans
Lighting Plans V DI d o -/❑ -/❑
Mechanical Plans V vi
Structural Plans VvL V u -V❑ -/❑ V❑
Radon Plan -/et- V u
6/29/2014 Page 2 of 2
Received
5/15/17