Loading...
HomeMy WebLinkAboutFile Documents.1112 Waters Ave.0089.2017 (18).ARBK PERMIT#: BUILDING PERMIT APPLICATION CHECKLIST IRC: Single Family, Duplex & Townhome THE CITY OF ASPEN For Building and Permit Information, please refer to our website at: www.aspenpitkin.com JOB ADDRESS ///2 WPIThil(NI, ptitf j CO. PARCEL I.D. NUMBER 073 7 1 6 Z. C 60/ 2.- OWNER WI- aJ 9-r64( 4-0F, 1 DATE The following are requirements for various types of projects. Permits must include ALL of the items on this checklist or they will not be accepted. Incomplete permits will be turned away. Refer to the Single Family & Duplex Building Submittal Guide and guides from other referral departments for clarifications and descriptions on each item. ❑ Be prepared to pay submittal fees at permit submittal. Contact a permit coordinator for a fee estimate. ❑ Submit a flash drive or disc with a copy of all documents and drawings in pdf format. 8 1/2" x 1 1 rr Documents (see submittal guide for number of copies) Submittal New Addition Alteration/ Interior Demo Repair Requirements Construction Remodel only partial or Alteration complete Planning Approvals -VA( -V° Permit Application Form & Contact VX -V° -V❑ V° -sht V° Sheet Valuation Adjustment Affidavit Vg -/❑ V I:l V❑ & Construction Bid HOA Certification NO( V o V° V❑ V V❑ IRC Building VV._ V o V o ° Description Form Asbestos ❑ -V° Questionnaire ° ° Asbestos test and -V° V ❑ V ❑ V ° clearance reports °P� State Asbestos Demolition Approval VX- Notice Fireplace Registration Form & Manufacturer's -V A..,_ V o -/❑ V❑ installation instructions Energy Code V❑ V° -V❑ V° Compliance Non-Vented Roof -V Assembly Calcs V° V° U-Factor Fenestration Docs VX- V n V o 6/29/2014 Page 1 of 2 Received 5/15/17 Submittal New Addition Alteration/ Interior Demo Repair Requirements Construction Remodel only partial or Alteration complete RREMP documents V r -/❑ 1/o Line Grade Verification Form AM- -V o Verificatio V❑ V❑ V❑ -V❑ Structural I tegrity Soils Report -V) V o Smuggle4rfund Soil Rem Permit V u V II V o Signed Special Inspection and V IX J Testing Agreement Mechanical Docs VX V c V o V❑ Photos V❑ 1/0 1/0 1/0 Unit/Building relationship V L, V I J❑ n ❑ 24"x36" (2 COPIES) & 11"x17" (1 COPY) Plans Sheets must be in the following order. Existing plans required for all additions & alterations Submittal New Addition Alteration/ Interior Demo Repair Requirements Construction Remodel only partial or Alteration complete Cover Sheet V i . V❑ -/❑ V❑ Survey Vlif V❑ V❑ Excavation/ Earth V lac V❑ Retention Plans Site Plan VK V❑ V❑ V❑ -/❑ RREMP Plan -/K V❑ V❑ V o Area Sheet V LIC V❑ ,/❑ -/❑ Floor Plans Ahir V o V❑ -V o V❑ V❑ Roof Plan V V -/❑ V❑ Elevations -/eir V❑ 1/❑ V/❑ Sections V V o V❑ V❑ Details VV V❑ -/❑ -/❑ V❑ Fireplace Details -V ig V❑ V❑ V❑ Schedules Vvf -/❑ -/❑ ,/❑ Reflected Ceiling ,/ t V❑ -/❑ V❑ Plans Lighting Plans V DI d o -/❑ -/❑ Mechanical Plans V vi Structural Plans VvL V u -V❑ -/❑ V❑ Radon Plan -/et- V u 6/29/2014 Page 2 of 2 Received 5/15/17