Loading...
HomeMy WebLinkAboutFile Documents.121 S Galena St.0083.2018 (4).ACBK infCOMcheck Software Version COMcheck-Web Envelope Compliance Certificate l Project Information Energy Code: 2015 IECC Project Title: 121 S GALENA OFFICE REMODEL Location: Aspen, Colorado Climate Zone: 7 Project Type: Alteration Construction Site: Owner/Agent: Designer/Contractor: 121 S GALENA ST MIKE HAISFIELD rally dupps ASPEN, Colorado 81611 GODIVA HOLDINGS LLC RALLY DUPPS ARCHITECT 435 W MAIN ST POB 3662 ASPEN, Colorado 81611 ASPEN, Colorado 81612 970-309-5507 720-481-7353 mhaisfield@gmail.com rallydupps@gmail.com Building Area Floor Area 1-Office : Nonresidential 1540 Envelope Assemblies Envelope TBD: No envelope assemblies specified EIVED Project Title: 121 5 GALENA OFFICE REMODEL Re11Et6: uo/u9T1 Data filename: P�ptle/1 d 9f„0818 VV t5 ASPEN BUILDING BUILDING DEPARTMENT COMcheck Software Version COMcheck-Web (ICI Interior Lighting Compliance Certificate Project Information Energy Code: 2015 IECC Project Title: 121 S GALENA OFFICE REMODEL Project Type: Alteration Construction Site: Owner/Agent: Designer/Contractor: 121 S GALENA ST MIKE HAISFIELD rally dupps ASPEN, Colorado 81611 GODIVA HOLDINGS LLC RALLY DUPPS ARCHITECT 435 W MAIN ST POB 3662 ASPEN, Colorado 81611 ASPEN, Colorado 81612 970-309-5507 720-481-7353 mhaisfield@gmail.com rallydupps@gmail.com Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 1-Office Total Allowed Watts= N/A Area Category Exemption Qualifications #Fixtures Total#Watts Activity Area Pre-Alt. Repl./Added Pre-Alt. Post-Alt. Office (1540 sq.ft.) 40 3 2400.000 2388.000 Exemption: Less than 10%fixture replacement. Proposed Interior Lighting Power A B C D E Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixture Watt. Office(1540 sq.ft.): Exempt LED:A: HALO CAN: LED A Lamp 12W: 1 3 24 72 LED: B: ROPE LED: LED A Lamp 12W: 1 1 12 12 Total Proposed Watts= N/A Interior Lighting PASSES Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version COMcheck-Web and to comply with any applicable mandatory requirements listed in the Inspection Checklist. iEwrigii [fO8/23/2O18 .9 FORCat a iKiNiCE -justnh )) Project Title: 121 S GALENA OFFICE REMODEL Re o t6: / 9 Data filename: 081 he/ b e/1,2/9fk 8 Zt55 ASPEN BUILDING DEPARTMENT COMcheck Software Version COMcheck-Web ril Exterior Lighting Compliance Certificate Project Information Energy Code: 2015 IECC Project Title: 121 S GALENA OFFICE REMODEL Project Type: Alteration Exterior Lighting Zone 0(Unspecified) Construction Site: Owner/Agent: Designer/Contractor: 121 S GALENA ST MIKE HAISFIELD rally dupps ASPEN, Colorado 81611 GODIVA HOLDINGS LLC RALLY DUPPS ARCHITECT 435 W MAIN ST POB 3662 ASPEN, Colorado 81611 ASPEN, Colorado 81612 970-309-5507 720-481-7353 mhaisfield@gmail.com rallydupps@gmail.com Allowed Exterior Lighting Power A B C D E Area/Surface Category Quantity Allowed Tradable Allowed Watts Watts/ Wattage (B X C) Total Tradable Watts(a)= 0 Total Allowed Watts= 0 Total Allowed Supplemental Watts(b)= 500 (a)Wattage tradeoffs are only allowed between tradable areas/surfaces. (b)A supplemental allowance equal to 500 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Proposed Exterior Lighting Power Exterior Lighting TBD: Exterior lighting zone not specified (see project screen) Project Title: 121 S GALENA OFFICE REMODEL Rend glYgt) Data filename: P�kag b e/1,3/k�8 VV tCii ASPEN BUILDING DEPARTMENT COMcheck Software Version COMcheck-Web ril Mechanical Compliance Certificate Project Information Energy Code: 2015 IECC Project Title: 121 S GALENA OFFICE REMODEL Location: Aspen, Colorado Climate Zone: 7 Project Type: Alteration Construction Site: Owner/Agent: Designer/Contractor: 121 S GALENA ST MIKE HAISFIELD rally dupps ASPEN, Colorado 81611 GODIVA HOLDINGS LLC RALLY DUPPS ARCHITECT 435 W MAIN ST POB 3662 ASPEN, Colorado 81611 ASPEN, Colorado 81612 970-309-5507 720-481-7353 mhaisfield@gmail.com rallydupps@gmail.com Mechanical Systems List Quantity System Type&Description Mechanical Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the 2015 IECC requirements in COMcheck Version COMcheck-Web and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Project Title: 121 5 GALENA OFFICE REMODEL Rend glYgt) Data filename: P�ote/1 sf/k�8 vv tCii ASPEN BUILDING DEPARTMENT COMcheck Software Version COMcheck-Web Inspection Checklist Energy Code: 2015 IECC ril Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Req.ID C103.2 Plans, specifications, and/or EComplies [PR4]1 calculations provide all information Does Not with which compliance can be determined for the interior lighting ❑Not Observable and electrical systems and equipment ❑Not Applicable and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts,transformers and control devices. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) p�� Project Title: 121 S GALENA OFFICE REMODEL Re o aF tGENF'): / Data filename: page/1 Sqf2�8 vv tCii ASPENb/ BUILDING DEPARTMENT Section # Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID C405.2.1 ;Lighting controls installed to uniformly ❑Complies [EL15]1 I reduce the lighting load by at least ❑Does Not i 1 50%. [Not Observable , ENot Applicable 1 C405.2.1 ;Occupancy sensors installed in ❑Complies 1 [EL18]1 i required spaces. ❑Does Not [Not Observable ENot Applicable C405.2.1, Independent lighting controls installed I❑Complies C405.2.2. per approved lighting plans and all 10Does Not 3 manual controls readily accessible and III Not Observable [EL23]2 visible to occupants. ENot Applicable 1 C405.2.2. Automatic controls to shut off all ;❑Complies 1 ,building lighting installed in all ❑Does Not [EL22]2 ;buildings. ❑Not Observable ❑Not Applicable 01 .3 Daylight zones provided with ❑Complies individual controls that control the ❑Does Not lights independent of general area lighting. ❑Not Observable ,❑Not Applicable C405.2.3, I Primary sidelighted areas are Complies C405.2.3. equipped with required lighting ❑Does Not 1, controls. C405.2.3. ❑Not Observable 2 ❑Not Applicable [EL20]1 C405.2.3, Enclosed spaces with daylight area ;❑Complies C405.2.3. under skylights and rooftop monitors ❑Does Not 1, are equipped with required lighting C405.2.3. ;controls. ENot Observable 3 1 ❑Not Applicable [EL21]1 C405.2.4 Separate lighting control devices for EComplies [EL4]1 specific uses installed per approved Does Not lighting plans. ENot Observable j ENot Applicable C405.2.4 Additional interior lighting power '❑Complies [EL8]1 allowed for special functions per the ❑Does Not approved lighting plans and is automatically controlled and ['Not Observable separated from general lighting. ENot Applicable i C405.3 Exit signs do not exceed 5 watts per ❑Complies [EL6]1 face. ❑Does Not ❑Not Observable ENot Applicable Additional Comments/Assumptions: !High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) CEIVFD Project Title: 121 S GALENA OFFICE REMODEL ReolEr : / Data filename: Vt3 P V 1,b6/k 08,. 8 ASPENV1 BUILDING DEPARTMENT Section # Final Inspection Complies? Comments/Assumptions & Req.ID C303.3, ;Furnished O&M instructions for ❑Complies C408.2.5. systems and equipment to the ❑Does Not 2 building owner or designated [F117]3 representative. [Not Observable ❑Not Applicable C405.4.1 Interior installed lamp and fixture ❑Complies See the Interior Lighting fixture schedule for values. [F118]1 lighting power is consistent with what ❑Does Not is shown on the approved lighting plans, demonstrating proposed watts ['Not Observable are less than or equal to allowed ❑Not Applicable watts. C408.2.5. :Furnished as-built drawings for ❑Complies 1 :electric power systems within 90 days ❑Does Not [FI16]3 of system acceptance. [Not Observable ENot Applicable C408.3 1 Lighting systems have been tested to ❑Complies [F133]1 ensure proper calibration, adjustment, ❑Does Not programming, and operation. [Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) � f D Project Title: 121 5 GALENA OFFICE REMODEL Re o1l t�: g/19 Data filename: oapt3e/1&gf208,. 8 ASPEN BUILDING DEPARTMENT Project Title: 121 S GALENA OFFICE REMODEL ReREt 15,IYf D Data filename: ote/1,b8/k 0818 VV tCii ASPEN BUILDING DEPARTMENT