HomeMy WebLinkAboutFile Documents.121 S Galena St.0083.2018 (4).ACBK infCOMcheck Software Version COMcheck-Web
Envelope Compliance Certificate
l
Project Information
Energy Code: 2015 IECC
Project Title: 121 S GALENA OFFICE REMODEL
Location: Aspen, Colorado
Climate Zone: 7
Project Type: Alteration
Construction Site: Owner/Agent: Designer/Contractor:
121 S GALENA ST MIKE HAISFIELD rally dupps
ASPEN, Colorado 81611 GODIVA HOLDINGS LLC RALLY DUPPS ARCHITECT
435 W MAIN ST POB 3662
ASPEN, Colorado 81611 ASPEN, Colorado 81612
970-309-5507 720-481-7353
mhaisfield@gmail.com rallydupps@gmail.com
Building Area Floor Area
1-Office : Nonresidential 1540
Envelope Assemblies
Envelope TBD: No envelope assemblies specified
EIVED
Project Title: 121 5 GALENA OFFICE REMODEL Re11Et6:
uo/u9T1
Data filename: P�ptle/1 d 9f„0818
VV t5 ASPEN
BUILDING BUILDING DEPARTMENT
COMcheck Software Version COMcheck-Web
(ICI Interior Lighting Compliance Certificate
Project Information
Energy Code: 2015 IECC
Project Title: 121 S GALENA OFFICE REMODEL
Project Type: Alteration
Construction Site: Owner/Agent: Designer/Contractor:
121 S GALENA ST MIKE HAISFIELD rally dupps
ASPEN, Colorado 81611 GODIVA HOLDINGS LLC RALLY DUPPS ARCHITECT
435 W MAIN ST POB 3662
ASPEN, Colorado 81611 ASPEN, Colorado 81612
970-309-5507 720-481-7353
mhaisfield@gmail.com rallydupps@gmail.com
Allowed Interior Lighting Power
A B C D
Area Category Floor Area Allowed Allowed Watts
(ft2) Watts/ft2
1-Office
Total Allowed Watts= N/A
Area Category Exemption Qualifications
#Fixtures Total#Watts
Activity Area Pre-Alt. Repl./Added Pre-Alt. Post-Alt.
Office (1540 sq.ft.) 40 3 2400.000 2388.000
Exemption: Less than 10%fixture replacement.
Proposed Interior Lighting Power
A B C D E
Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D)
Fixture Fixture Watt.
Office(1540 sq.ft.): Exempt
LED:A: HALO CAN: LED A Lamp 12W: 1 3 24 72
LED: B: ROPE LED: LED A Lamp 12W: 1 1 12 12
Total Proposed Watts= N/A
Interior Lighting PASSES
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the
building plans, specifications, and other calculations submitted with this permit application.The proposed interior lighting
systems have been designed to meet the 2015 IECC requirements in COMcheck Version COMcheck-Web and to comply with any
applicable mandatory requirements listed in the Inspection Checklist.
iEwrigii
[fO8/23/2O18 .9
FORCat a iKiNiCE
-justnh ))
Project Title: 121 S GALENA OFFICE REMODEL Re o t6: / 9
Data filename: 081
he/ b
e/1,2/9fk 8
Zt55 ASPEN
BUILDING DEPARTMENT
COMcheck Software Version COMcheck-Web
ril Exterior Lighting Compliance Certificate
Project Information
Energy Code: 2015 IECC
Project Title: 121 S GALENA OFFICE REMODEL
Project Type: Alteration
Exterior Lighting Zone 0(Unspecified)
Construction Site: Owner/Agent: Designer/Contractor:
121 S GALENA ST MIKE HAISFIELD rally dupps
ASPEN, Colorado 81611 GODIVA HOLDINGS LLC RALLY DUPPS ARCHITECT
435 W MAIN ST POB 3662
ASPEN, Colorado 81611 ASPEN, Colorado 81612
970-309-5507 720-481-7353
mhaisfield@gmail.com rallydupps@gmail.com
Allowed Exterior Lighting Power
A B C D E
Area/Surface Category Quantity Allowed Tradable Allowed Watts
Watts/ Wattage (B X C)
Total Tradable Watts(a)= 0
Total Allowed Watts= 0
Total Allowed Supplemental Watts(b)= 500
(a)Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b)A supplemental allowance equal to 500 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces.
Proposed Exterior Lighting Power
Exterior Lighting TBD: Exterior lighting zone not specified (see project screen)
Project Title: 121 S GALENA OFFICE REMODEL Rend
glYgt)
Data filename: P�kag b
e/1,3/k�8
VV tCii ASPEN
BUILDING DEPARTMENT
COMcheck Software Version COMcheck-Web
ril Mechanical Compliance Certificate
Project Information
Energy Code: 2015 IECC
Project Title: 121 S GALENA OFFICE REMODEL
Location: Aspen, Colorado
Climate Zone: 7
Project Type: Alteration
Construction Site: Owner/Agent: Designer/Contractor:
121 S GALENA ST MIKE HAISFIELD rally dupps
ASPEN, Colorado 81611 GODIVA HOLDINGS LLC RALLY DUPPS ARCHITECT
435 W MAIN ST POB 3662
ASPEN, Colorado 81611 ASPEN, Colorado 81612
970-309-5507 720-481-7353
mhaisfield@gmail.com rallydupps@gmail.com
Mechanical Systems List
Quantity System Type&Description
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building
plans, specifications, and other calculations submitted with this permit application.The proposed mechanical systems have been
designed to meet the 2015 IECC requirements in COMcheck Version COMcheck-Web and to comply with any applicable
mandatory requirements listed in the Inspection Checklist.
Project Title: 121 5 GALENA OFFICE REMODEL Rend
glYgt)
Data filename: P�ote/1 sf/k�8
vv tCii ASPEN
BUILDING DEPARTMENT
COMcheck Software Version COMcheck-Web
Inspection Checklist
Energy Code: 2015 IECC
ril
Requirements: 0.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
# Plan Review Complies? Comments/Assumptions
& Req.ID
C103.2 Plans, specifications, and/or EComplies
[PR4]1 calculations provide all information Does Not
with which compliance can be
determined for the interior lighting ❑Not Observable
and electrical systems and equipment ❑Not Applicable
and document where exceptions to
the standard are claimed. Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts,transformers and
control devices.
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) p��
Project Title: 121 S GALENA OFFICE REMODEL Re o aF tGENF'): /
Data filename: page/1 Sqf2�8
vv tCii ASPENb/
BUILDING DEPARTMENT
Section
# Rough-In Electrical Inspection Complies? Comments/Assumptions
& Req.ID
C405.2.1 ;Lighting controls installed to uniformly ❑Complies
[EL15]1 I reduce the lighting load by at least ❑Does Not i
1 50%.
[Not Observable
, ENot Applicable 1
C405.2.1 ;Occupancy sensors installed in ❑Complies 1
[EL18]1 i required spaces. ❑Does Not
[Not Observable
ENot Applicable
C405.2.1, Independent lighting controls installed I❑Complies
C405.2.2. per approved lighting plans and all 10Does Not
3 manual controls readily accessible and III
Not Observable
[EL23]2 visible to occupants.
ENot Applicable 1
C405.2.2. Automatic controls to shut off all ;❑Complies
1 ,building lighting installed in all ❑Does Not
[EL22]2 ;buildings. ❑Not Observable
❑Not Applicable
01 .3 Daylight zones provided with ❑Complies
individual controls that control the ❑Does Not
lights independent of general area
lighting. ❑Not Observable
,❑Not Applicable
C405.2.3, I Primary sidelighted areas are Complies
C405.2.3. equipped with required lighting ❑Does Not
1, controls.
C405.2.3. ❑Not Observable
2 ❑Not Applicable
[EL20]1
C405.2.3, Enclosed spaces with daylight area ;❑Complies
C405.2.3. under skylights and rooftop monitors ❑Does Not
1, are equipped with required lighting
C405.2.3. ;controls. ENot Observable
3 1 ❑Not Applicable
[EL21]1
C405.2.4 Separate lighting control devices for EComplies
[EL4]1 specific uses installed per approved Does Not
lighting plans.
ENot Observable
j ENot Applicable
C405.2.4 Additional interior lighting power '❑Complies
[EL8]1 allowed for special functions per the ❑Does Not
approved lighting plans and is
automatically controlled and ['Not Observable
separated from general lighting. ENot Applicable
i
C405.3 Exit signs do not exceed 5 watts per ❑Complies
[EL6]1 face. ❑Does Not
❑Not Observable
ENot Applicable
Additional Comments/Assumptions:
!High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) CEIVFD
Project Title: 121 S GALENA OFFICE REMODEL ReolEr : /
Data filename: Vt3 P V 1,b6/k 08,. 8
ASPENV1
BUILDING DEPARTMENT
Section
# Final Inspection Complies? Comments/Assumptions
& Req.ID
C303.3, ;Furnished O&M instructions for ❑Complies
C408.2.5. systems and equipment to the ❑Does Not
2 building owner or designated
[F117]3 representative. [Not Observable
❑Not Applicable
C405.4.1 Interior installed lamp and fixture ❑Complies See the Interior Lighting fixture schedule for values.
[F118]1 lighting power is consistent with what ❑Does Not
is shown on the approved lighting
plans, demonstrating proposed watts ['Not Observable
are less than or equal to allowed ❑Not Applicable
watts.
C408.2.5. :Furnished as-built drawings for ❑Complies
1 :electric power systems within 90 days ❑Does Not
[FI16]3 of system acceptance.
[Not Observable
ENot Applicable
C408.3 1 Lighting systems have been tested to ❑Complies
[F133]1 ensure proper calibration, adjustment, ❑Does Not
programming, and operation. [Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) � f D
Project Title: 121 5 GALENA OFFICE REMODEL Re o1l t�: g/19
Data filename: oapt3e/1&gf208,. 8
ASPEN
BUILDING DEPARTMENT
Project Title: 121 S GALENA OFFICE REMODEL ReREt 15,IYf D
Data filename: ote/1,b8/k 0818
VV tCii ASPEN
BUILDING DEPARTMENT