Loading...
HomeMy WebLinkAboutFile Documents.36 Ute Pl.0019.2017 (18).ARBU �Rp��pp 4 PSON SOILS AND FOUNDATION INVESTIGATION ADDITION TO 36 UTE PLACE ASPEN, COLORADO DEC 0 1 2005 AbrtI BUILDING DEPARTMENT Prepared For: ZONE 4 ARCHITECTURE P.O. Box 2508 Aspen, CO 81612 Attention: Mr. Keith Howie Project No. GS04654-120 November 22, 2005 Received 234 Center Drive I Glenwood Springs, Colorado 81601 2/27/17 Telephone: 970-945-2809 Fax: 970-945-7411 I TABLE OF CONTENTS SCOPE 1 SUMMARY OF CONCLUSIONS 1 SITE CONDITIONS 1 PROPOSED CONSTRUCTION 2 SUBSURFACE CONDITIONS 2 SITE EARTHWORK 3 Excavations 3 Structural Fill 4 Backfill 4 FOUNDATION 4 FLOOR SYSTEM AND SLABS-ON-GRADE 5 BELOW-GRADE CONSTRUCTION 6 SUBSURFACE DRAINAGE 6 SURFACE DRAINAGE 7 LIMITATIONS 8 FIGURE 1 -APPROXIMATE LOCATION OF EXPLORATORY PIT FIGURE 2 —SUMMARY LOG OF EXPLORATORY PIT FIGURE 3 — EXTERIOR FOUNDATION WALL DRAIN Rece iVApARCHITECTURE LACE ADDITION 2/27/C CT N0.G\2.Rep-120 L S''G 04654.0 0 011 2 012.Repo rts2L04654 120 R1.doc SCOPE This report presents the results of our soils and foundation investigation for the addition to 36 Ute Place in Aspen, Colorado. We conducted this investigation to evaluate the subsurface conditions at the site and provide geotechnical recommendations for the planned construction. Our report was prepared from data developed from our field exploration, laboratory testing, engineering analysis, and from our experience with similar conditions. The recommendations contained in the report were developed based on the currently planned construction. We should be informed if actual construction will differ significantly from the descriptions herein. A summary of our conclusions is presented below. SUMMARY OF CONCLUSIONS 1. Subsurface conditions encountered in our exploratory pit consisted of about 2 feet of sandy clay "topsoil" underlain by clayey to silty gravel, cobbles and boulders to the maximum explored depth of 6 feet below existing ground surface.Ground water was not found in the exploratory pit 2. We recommend constructing the addition on footing foundations supported by the undisturbed, natural gravel soil. Design and construction criteria for footings are presented in the report. 3. We judge potential differential settlement of slab-on-grade construction supported by the undisturbed, natural gravel will be low. Additional discussion is in the report. 4. Surface drainage should be designed to provide for rapid removal of surface water away from the building. A foundation drain should be installed around below-grade areas. SITE CONDITIONS The site is located at 36 Ute Place near the base of Aspen Mountain in Aspen, Colorado. Single-family residences are south and east of the subject lot. The Ute ZONE 4 RCHITECTURE 1 LACE Receil(RIIJ TNO.GSO4i6540N20 2/27 r74654.0001120\2.ReportslG504654120 R1.doc fi Cemetery is to the southeast. The existing residence at 36 Ute Place is a two-story, wood-frame building with an attached garage at the east side. A walkout basement is below most of the building. A crawl space is below the east part of the main level fifloor. The garage floor is a slab-on-grade near the main floor elevation. A patio and landscaping are in the area of the planned addition. a _ Interior finish material and drywall in the building had been stripped as part of remodeling at the time of our site visit. The building is constructed on footing foundations. Foundation walls are constructed with concrete masonry units. Slab- on-grade floors are in the basement and garage. Our observations indicate the foundations, foundation walls, and slabs-on-grade have performed well. Wet conditions are present in the south part of the crawl space. The moisture appears to be due to seepage of exterior surface runoff. - i PLANNED CONSTRUCTION Remodeling of the existing residence was in progress at the time of our _ investigation. A two-story,wood-frame addition is planned adjacent to the southeast part of the building. The main level of the addition will match the main level of the existing residence. Footing foundations are planned for the addition. Bottom of footings are planned about 4 feet below existing ground surface. We were informed that the main floor of the addition would be structurally supported with a crawl space - below. If actual construction will differ significantly from the descriptions above,we !. should be informed so that we can check that our recommendations are appropriate. SUBSURFACE CONDITIONS Subsurface conditions in the area of the planned addition were investigated by observing excavation of an exploratory pit(TP-1) at the approximate location shown on Figure 1. Exploratory excavation operations were directed by our geotechnical ZONE 4 ARCHITECTURE 2 Recei T LACE ADDITION , T NO.GSO4654.120 2/27riG7654.000512052.ReportslGSO4654 120 R I.doc `T • 1 ...::::::„:„.:::::.,..;:.,.„,„:„:„.,,,,:„:„.„:„....:„..,,, 7 .. , ... .... engineer:.who logged the soils encountered in the borings and obtained samples for :' testing in our laboratory. Graphic logs of the soils found...i,n,,our.exploratory borings x shown 0 n Fi ure2. areg encountered in o : ted • of about 2 Subsurface conditionsurexplorato't `'pit'corisis ' • feet of sandy clay"topsoil" underlain by clayey to:silty:::g:ra•vel.,:cobbles:and boulders • to the maximum explored depth of 6 feet below:::existing:.:ground surface. Our • • observations during exploratory excavation indicated:the.gravel:;was:.dense. Ground .11 water.was not encountered in the exploratory pit. EARTHWORK :t 3' .. ns ava do w;:�: -Exc - f>h • ns;:::an:d utilities..::at.':th:is We anticipate excavations for foundatio site can be accomplished usingconventional, heav duty excavation a ui ment .;Care must be p Y" . : Y.: a p :' ;:::• taken to avoid undermining the existing building. Excavation sides wilt. need to be ' sloped or braced to meet local, state and federal safety regulations We believe the .:.:::.. natural gravel soil will classify as a Type C:soil:based on O.SHA-standards governing excavations. Temporary slopes deeper than5.:feetshould.be.no steeperthan 1.5 to 1 (horizontal to vertical) in Type C soils. ,The:•.•contractor should identify the soils encountered in excavations and refer to:OSHA standards to;;deterni:ne appropriate slopes. : • We do not anticipate excavations for foundations or uti:lf;ities will penetrate the •ground water table. However, excavation:s.:shou.ld:.beoped ta:::a.;::positive gravity :. outfall or to a temporary sump where water from;;preci ptation canbe::removed by excavations'should be-slog ed as,•much as pumping. Ground surfaces surrounding,. �.,,:.....:...... �i o the excavations:,:::>::; <::; _ :':::;:.. practical to direct runoff away fromgi,,, ,,:.,..:,:,,,, ..:: :'ry'i: ;�:.. • i 4r` 3RZO ARCHITECTURE ecei16PLACEADDITION . : .. .• PROJECT NO.GSO4654-120 . .:: z „ -„ € . 2/27/4 4654.0004'2042.Reports5GS04654 120 RI.doc ..:. . ...... : .: .. J 3 .:I 3 i Structural Fill 4 Structural fill may also be required below the planned patio slabs. Structural fill can consist of the on-site gravel soils provided they are free of rocks larger than 3- inches in diameter, organics and debris. If import soils are desired for use as structural fill,a sample should be submitted to our office for approval prior to hauling. We suggest an AASHTO Class 6 aggregate base course or similar soil. Structural fill should be placed in loose lifts of 10 inches thick or less, moisture-treated to within 2 percent of optimum moisture content, and compacted to at least 98 percent of 1 standard Proctor(ASTM D 698) maximum dry density. Our representative should be 1 called to check the density and moisture content of structural fill. Backfill Proper placement and compaction of backfill adjacent to foundation walls is 0 important to reduce infiltration of surface water and consolidation of backfill soil. Backfilf should consist of the on-site soils or similar soils free of organics,debris and rocks larger than 6 inches in diameter. Backfill should be placed in loose lifts of 10 inches thick or less,moisture-treated to within 2 percent of optimum moisture content and compacted to at least 95 percent of standard Proctor(ASTM D 698)maximum dry density. We recommend that density and moisture content of backfill be checked _ during placement. FOUNDATION We recommend constructing the addition on footing foundations supported by the undisturbed, natural gravel soil. Our representative should observe the completed - foundation excavation to confirm that the exposed soils are as anticipated and suitable for support of the designed footings, We expect footings designed according to the criteria below will experience maximum total settlements of about 1 TECTURE RGe3 PT. I . - 4 6CNAE ADDITION 2/2 14740O011G2O4R6e5p4ort1s2lG504654 120 R1.doc I Y inch. This settlement will be mostly differential with respect to the existing building. Footings should be designed and constructed according to the criteria below. 1 1 1. The footing foundations should be supported by the undisturbed, natural gravel soil. Soils loosened during the forming process for the footings should be removed or re-compacted prior to placing concrete 1 2. Footings should be designed for a maximum soil bearing pressure of - 4,000 psf. 5 3. Continuous wall footings should have a minimum width of at least 16 inches. Foundations for isolated columns should have minimum dimensions of 24 inches by 24 inches. Larger sizes may be required, depending upon foundation loads. 1 4. Grade beams and foundation walls should be well reinforced, top and bottom, to span undisclosed loose or soft soil pockets. We recommend reinforcement sufficient to span an unsupported distance of at least 12 feet. Reinforcement should be designed by the structural engineer. 1 1 1 5. The soils under exterior footings should be protected from freezing.We recommend the bottom of footings be constructed at a depth of at least 48 inches below finished exterior grades. The Aspen building 11 department should be consulted to verify the required frost protection depth. j 1 1 FLOOR SYSTEM AND SLABS-ON-GRADE 4 We understand that no new interior slabs-on-grade are planned for the project. A new patio will be constructed adjacent to the addition. Based on our field and laboratory test data and our experience,we judge slab-on-grade construction can be supported by the undisturbed, natural gravel with low risk of differential movement and associated damage. Structural fill below the patio slab should be placed and compacted as outlined in the Structural Fill section. Exterior patio slabs should be isolated from the building. These slabs should r be well reinforced to function as independent units. Frequent control joints should be I 1 1 ZONE 4 ARCHITECTURE 5 .3 T LACE ADDITION ieRece i 'T N0.OS04654-120 //� S:GSS04654A00112012.Reports4GS04654120 R1.doc 2/2 /T1 1 ■ 1 F provided, in accordance with American Concrete Institute(ACI) recommendations, to reduce problems associated with shrinkage and curling. BELOW-GRADE CONSTRUCTION Foundation walls which extend below-grade should be designed for lateral earth pressures where backfill is not present to about the same extent on both sides of the wall. Many factors affect the values of the design lateral earth pressure. These factors include, but are not limited to, the type, compaction,slope and drainage of the backfill, and the rigidity of the wall against rotation and deflection. For a very rigid wall where negligible or very little deflection will occur, an "at-rest" lateral earth pressure should be used in design. For walls which can deflect or rotate 0.5 to 1 percent of wall height(depending upon the backfill types), lower"active" lateral earth pressures are appropriate. Our experience indicates typical basement walls can deflect or rotate slightly under normal design loads, and that this deflection results in satisfactory wall performance. Thus, the earth pressures on the walls will likely be between the "active" and "at-rest" conditions. We recommend design of below-grade walls using an equivalent fluid density of at least 45 pcf for this site. Backfill placed adjacent to foundation wall exteriors should be in accordance with the recommendations in the Backfill section.The above equivalent density does not include allowances for sloping backfill, surcharges or hydrostatic pressures. The recommended equivalent density assumes deflection; some minor cracking of walls may occur. If very little wall deflection is desired, a higher equivalent fluid density may be appropriate for design. SUBSURFACE DRAINAGE Water from precipitation, snow melt and surface irrigation of landscaping frequently flows through relatively permeable backfill placed adjacent to a building ZONE 4 ARCHITECTURE 5 T P CE Rece 0.GSO4654-ADDITION120 7%1 4654.000112012 Reports1GS04654 120 R1.doc 2/2 V and collects on the surface of relatively undisturbed soils at the bottom of the excavation. This can cause wetting of foundation soils, hydrostatic pressures on I foundation walls, and moist conditions in below-grade areas after construction. To• mitigate these concerns, we recommend provision of a foundation drain around below-grade areas. The foundation drain should consist of a 4-inch diameter, perforated or slotted PVC pipe encased in free draining gravel. The drain should lead to a positive gravity outfall or to a sump pit where water can be removed by pumping. A typical foundation drain detail is shown on Figure 3. Crawl spaces should be provided with ventilation to maintain acceptable humidity levels. It may be appropriate to install a ventilation system that is controlled by a humidistat. � I SURFACE DRAINAGE 1 II Surface drainage is critical to the performance of foundations, floor slabs and concrete flatwork. We recommend the following precautions be observed: Ic 1. The ground surface surrounding the exterior of the building should be sloped to convey surface water away from the building. In landscaped areas, we recommend providing a slope of at least 6 inches in the first 5 feet away from the building. 2. Backfill adjacent to foundation wall exteriors should be moistened to within 2 percent of optimum moisture content and compacted to at least 95 percent of standard Proctor (ASTM D 698) maximum dry density. 1 3. The building should be provided with gutters and downspouts. Roof downspouts and drains should discharge well beyond the limits of all backfill. Splash blocks and downspout extensions should be provided at all discharge points. Water from roof and surface runoff should not be introduced to the foundation drain system. ZONNEe�E]4 ARCHITECTURE 7 Reti O F_ �EGS046544-r120 /27715p,p00412042.Reporls1GS04654 120 R1.doc LJ I/ 7 1 T 4. Landscaping should be carefully designed to minimize irrigation. Plants used near foundation walls should be limited to those with low moisture requirements; irrigated grass or other landscaping requiring comparatively large amounts of irrigation should not be located within 5 feet of the foundation. Sprinklers should be at least 5 feet from building foundations and directed away from the building. Irrigation should be limited to the minimum amount sufficient to maintain vegetation; the application of additional water will increase the likelihood of slab and foundation movements. 5. Impervious plastic membranes should not be used to cover the ground surface immediately surrounding the buildings. These membranes tend to trap moisture and prevent normal evaporation from occurring. Geotextile fabrics can be used to control weed growth and allow some evaporation to occur. LIMITATIONS Our exploratory pit was located to obtain a reasonably accurate picture of the subsurface. Variations in the subsurface conditions not indicated by the exploratory pit will occur. Our representative should be called to observe the completed foundation excavation to ensure that the subsoils are as anticipated from our field investigation. This investigation was conducted in a manner consistent with that level of care and skill ordinarily exercised by geotechnical engineers currently practicing under similar conditions in the locality of this project. No other warranty, express or implied, is made. If we can be of further service or if you have questions regarding this report, please call. CTL I THOMPSON, INC. es D. Kellogg, P.E. Project Engineer °=, 11 )220 JDK:cd (5 copies sent) ZONE 4 ARCHITECTURE 8 T P CE ADDITION Rece O.GSO4654-120 S:IGS04654.0 0 011 2 012.Reports IGS04654 120 R1.doc 2/27/17 1 f 1 1 i T I ice) 1 Scale 1'=301 I j I I I I /+ I - ra+ •2i.. _2- .7 fY �. t MIs::M-. vat• _ • _ -j• w a 1 • =f r • •Y ,• r15,t:KiC 1Dl.�7If _ 4 i ti- .( _ - ram- — --- --_ _ _ a-al ply ...,,•1�T -_( - • 1,- . „ - , _ i ,r:" it''' : it I ' ` Ua+ IL, r , •el •1 1! ' 3 'Y Wit +J.1^��E .YJ IC 1 - OPf ._ - A . IMrr.l� t s __1 1 '` - YI:R'lAiT Arta, _ %twLv1._L4 l.13T.l1-n ' lL11�:zts'F .,• I ,f ti4 f -4,-' Approximate Location of Exploratory Zone 4 Architecture Pi} 38 Ute Place AdditionL Redo. GS04654-120 Fig. 1 2/27/17 TP-1 0 � o m ro 5 5 _ a_ m d � 90 10 i:. LEGEND: NOTES: Sandy clay "topsoil", very 1. Exploratory pit was excavated moist, dark brown. with a mini trackhoe on November 21, 2005. The pit was backfilled immediately after excavation operations were completed. Gravel, cobbles, boulders, clayey to silty matrix, dense, 2. No free ground water was found moist, brown, gray. (GC—GM) in the exploratory pit at the time i of excavation. 3. Location of exploratory pit is approximate. 4. This exploratory pit is subject to the explanations, limitations and }' conclusions as contained in this report. SUMMARY LOG OF EXPLORATORY PIT { ReEe e • GS04654--120 Fig. 2 2/27/17 • . • ___ ./ .., - rSLOPE •• PER REPORT I -f- ........ ..... PROVIDE PVC SHEETING GLUED BELOW GRADE WALL -_ -- -_ TO FOUNDATION WALL TO REDUCE ----•----...--__-_-_-_-.- MOISTURE PENETRATION. SLOPE :_._ .__::--_ PER _. -....-.-.__._.-:: OSHA BACKFILL _ _ - (COMPOSITION AND : _ REINFORCED STEEL COMPACTION PER REPORT) -- __- _ _ PER STRUCTURAL DRAWINGS COVER GRAVEL WITH =: =-x_-::-:_=._- CRAWL SPACE-- ENCASE PIPE IN WASHED FILTER FABRIC CONCRETE AGGREGATE (ASTM --:_-::=_ = -_-_-- ---------------- C33, NO. 57 OR NO. 67) ::::: _::::_:- EXTEND GRAVE TO AT LEAST 1/2 HEIGHT OF FOOTING. E........._____________.„ _ __ _ _ _ f SLOPE TO DRAW 2" MINIMUM 8" MINIMUM BOTTOM OF EXCAVATION OR BEYOND 1:1 SLOPE FROM BOTTOM OF FOOTING. (WHICHEVER IS GREATER) NOTE: DRAIN SHOULD BE AT LEAST 2 INCHES 4-INCH DIAMETER PERFORATED BELOW BOTTOM OF FOOTING AT THE DRAIN PIPE. THE PIPE SHOULD HIGHEST POINT AND SLOPE DOWNWARD BE PLACED IN A TRENCH WITH A TO A POSITIVE GRAVITY OUTLET OR TO SLOPE RANGE BETWEEN 1/8 INCH A SUMP WHERE WATER CAN BE REMOVED AND 1/4 INCH DROP PER FOOT BY PUMPING. OF DRAIN. Exterior Foundation 0 N Wall Drain Project No. GS04654-120 Fig. 3 'Receive 2/27/17