HomeMy WebLinkAboutFile Documents.250 S Original St.0294.2017 (12).ARBK Engineering Comments
6- structural 16070 Thompson 2017-10-11.pdf(1)
p4®
4"GON12'OGl2 O.c.A6 Page Label: DETAIL SHEET Window well must be free
NV .G.EACH YL
5 A8 Author: mikeh draining. Please adjust plans.
94 4 3/4"
Date: 12/4/2017 9:27:58 AM
• File Name: 6-structural 16070 Thompson 2017-10-11.pdf
Window well must be free LAB 0 REQUIRED B S P
draining.Please adjust plans. GRAVEL SUPPORT AT BOTTOM
OF METAL WELL TO FOLLOW
MANUFACTURER RECOMMENDATIONS
SK'E TO ADJUST PLANS
RECEIVED
01/10/2018
ASPEN
BUILDING DEPARTMENT