Loading...
HomeMy WebLinkAboutFile Documents.20 Ajax Ave.0263.2018.ARBK %, ASPEN ROtIiFING APPLICATI N CHECKLIST iFor Buildingand Permit Information lease refer to ouourwebsite at: http://www.aspenpiticin.com/depts/41/main building.cfm THE CITY OF ASPEN NOTE: This is a general list of required information.More information may be required as each project is individually evaluated. If the proposed structure requires City Land Use Review,all final approvals must be obtained PRIOR to submission of a building permit application. Contact a city planner at 970/920-5090 to determine if a Land Use Review is needed. JOB ADDRESS "PO fill PARCEL I.D.NUMBER •OWNER Vi ke, {(f Al2 � y\ 4- )OA A . �� c DATE: q ( iLf ) All reroofing projects require a r oo fin,,_ permit* Roof work involving changes to height,slope,footprint,structural framing,or cavity insulation requires a Building Pernril. *Patching less than 1 square(10'x10')does not require a permit. Pl se submit the following: Permit Application form completely filled out with accompanying 'Contact Sheet HOA Certification form signed by the owner of the property 0 YES/, NO -Is the site listed on the"Inventory of Historic Sites and Structures"or in the Historic District? r If yes,HPC Approval required. Contact the Historic Preservation Officer at 429-2758 Mtlit Site Ilan(2 copies) showing the roof and including the following(may be hand drawn): Extent of proposed work impervious Areas Show and label all hardscape vs, landscaping ownspout&Gutter locations draw and label each one and show if they drain to hardscape or landscaping al Snowguards/stops required on all roofs that shed onto neighboring properties or potentially occupied areas such as a 1 walkway,stairway,alley,deck,pedestrian and vehicular exit from buildings or areas where there is potential for R v , • �■ ry or property damage and areas directly above or in front of gas utility or electric utility meters. _ s-- 0,2016) Photo ra hs(2 copies), one clearly showing the structure involved and one showing a close-up of the existing roof rrrMr$1VIanagement Plan(CMP) (2 copies)which includes a Right-of-Way permit required for work in the public / ROW and an Encroachment License required for occupancy of a public ROW, a Asb• st yist(1 copy)regarding material removed. BUILDINt y YES to the Asbestos Checklist,answer these questions: i YESID NO-Are all the roofing materials to be removed asphaltic,tar impregnated and non-friable(will not crumble by hand pressure when dry)? M YES/D NO-Will you be removing the roofing materials by hand(no circular saws)? Ia YES/0 NO-Will you dispose asphaltic roof shingles and NOT recycle them? / If you answer YES to all of the above,an asbestos test will not be required. ri Assemly: 0/Proposed Roof assembly drawing label each component,including product and manufacturer name and existing to remain components and number of layers. Show flashing and ice barrier. RI if Class: P: Provide a listed roof assembly specific to your roofing product and installation(provide the UL or ESR report) f Class A(minimum required for all roofs per Ordinance 40,2016)• Existing roofing and number of layers: rk vs'1,A„A, A- \ , 4( Cie al .-1 VI t 4 YES/0 NO-Is the roof vented? n b ,c-- 4 1 N.- L ❑ YES/l':NO -Are you removing,replacing,or adding roof deck insulation(including tapered)? If YES,describe: 0 Letter of Structural Integrity(1 copy)required if adding insulation due to potential increase in snow load. ❑ YES/ NO—Are you replacing damaged roof deck?Approximate square feet: If YES,the roof must comply with the energy code which may require insulation. Additional requirements from Ordinnnce 40,2016: Ice barrier consisting of either self-adhering polymer modified bitumen sheet or two layers of underlayment cemented together required to extend from the roof eave edge at least 6 feet inside the exterior wall line as measured along the roof surface, 18 inches from the centerline of the valley and 24 inches on the vertical wall at a roof and wall juncture. Ventilation openings,including ridge vents,must protect against rain and snow.Individual vents may not exceed 144 sq inches.Vents must be covered with noncombustible corrosion-resistant mesh or screen with openings no smaller than 1/16"and no larger than • Wood shakes and shingles require a minimum''/"vented airspace separating the shingles from the roofmg underlayment above the structural sheathing. Updated 2/22/2017 PERMIT NUMBER: 0 MASTER PERMIT: DATE: COMMUNITY DEVELOPMENT DEPARTMENT 5. T}IE CITY OF ASPENBUIL IN PERMIT APPLICATION -- PROPERTY INFORMATION ADDRESS` aO A 'aX M�i� UNIT# PARCEL ID#zasigo)tiova ry^d 4 i, 0 1 a�1 i.� LOT v BLOCK OR SUBDIVISION I.e �� 6^� -I ( V DESCRIPTIONOF o r/ttrnOVe, cl11(� i-tom(, dtcpocei 6(-- n/1//1konitC 14 of e\y 1Att- WORK IN DETAIL Q�V?�,�� �J(9� ' 1 C i Ne, _ ; t �S ,,,�� V1/PMpjOkc, V1(A5 & c t BEST NAMEONTACT r��A SAS iC 1L.1 CELL 6 O-+IV- 2,6 EMAIL v4S 1 CA(A � f � 14� . e/r V { 1 V OWNER NAME TO, le, ►rl Vv® 1 CELIII 40"qIV —3Ziz EMAIL J 0,1( 1/jm AyYL .� I41 Vy o PROJECT DETAILS 4 ' (0,00 Use of Building Class of Work Fixture CountsVI1A Equipment Checklisth,14 ® ® ❑ Commerical 0 New —Toilets,Bidets Forced Air/Gravity Systems ;1i' Multi-Family ❑Addition Bathtub "`�}e Wall,Suspended,or Unit Heaters Single Family MI Alteration Lavatory(Wash Basin) -Gas Log UNITSQFT Mixed-Use Repair —Shower _Kitchen Sink(+Disposal) Gas Appliancew LOT SIZE ® 0 IF R _Dishwasher Appliance Vents (SQ FT) 0 Tenant Finish Laundry Bar,Utility Sink Heat,Refrig,Cooling,or Will there be ❑ Demolition Clothes Washer Absorption Unit , LAND- SCAPE W RK° any roof/wall ❑ Change Order —Floor Sink Boilers(includes vent) ��� penetrations? 0 Floor Drain _Air Handling Unit NEW 0 Yes —Shower Cooling Systems FT ► No NOTICE: This permit becomes null and Water Heater(Pan Req) Ventilation Fans SQ FT OF ROOMS void if work or construction authorized _#Gas Outlets WITH UTILITY WOR is not commenced within]80 days,or _Water Treatment _Range Hood O 2 9/ O 1 if construction or work is suspended or Other #of Gas System Outlets abandoned for a period of 180 days at Snowmelt System Sq Ft �.P�' any time after work is commenced. uip �iip����efinitions ,Gi�lba'ib`ri�'rot of project as defined in Valuation Affadavit. Sq Ft of Work Area:Total square footage of area undergoing change or reconfiguration. Unit Sq Ft:Gross Square Footage,not FAR,of permitted unit. APPROVALS O C S�/ Lot Size:Total surveyed square footage of property. I Y Sq Ft of Landscape Work:Square footage of disturbed exterior area. Reviewing Review Reviewer Date New Sq Ft:Total added square footage for additions to net livable or net leasble space. Department Requir d Initials Approved S. Ft of Rooms with Utilit Work:Total s.uare foota:e not FAR of all rooms with •lumbin:work. Zoning CITY USE ONLY ZOn g SV I 10/ SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES HPC Plan Check 215 Permit Fee 4.5 ,60 Parks Impact Building )§, SV 10/2 Energy Code REMP School Ded. Fire SV 10/2 Zoning(50%) Plan Check TDM Impact Engineering (Hourly) CMP X rR i-iroiT Engineering Review Zoning(Hourly) Ped.Amenity CMP(50%) Utilities 5€ ps Engineering Housing Cash in Lieu (Hourly) Water Parks Review Zoning(50%) Stormwater Stormwater Utility Review CMP(50%) TA. City Use Tax Sanitation Other J Electrical County Use Tax Env. Health Plumbing GIS Mechanical Sanitation Parks x 10/29 Lands • Lot Area Effici R-3 Zone District Approved DAM 11/6/1F Deed Restricted To Issue' 2�1 Census Code Issuance PLANS LOCATION ASPEN # of Dwellings arti r,liltiPPARTMF NT I CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CO 816111 PERMIT NUMBER: ADDRESS: - � ,1 �t- %1k,iik-> COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT CONTACT E ET THE CITY OF ASPEN • 4, FOR PLAN REVIEW QUESTIONS Name IM["IJIIL:L lhl'1►/M1711/IPMEIEITL'1. Phone (4% `7921 2 q14, ell,'-, ail FOR INSPECTION QUESTIONS Name wNYI Pi Phone E-mail OWNER Name liA(it 1 d1(\-ML ltl i ,Vt. kC Phone " R d' 7, 1 H "''<, r i•hone Mailing 1 0 �c,SO () p g 1 Address figg Pxy n (��,�t ,� �(} City y I,���/�/) dam, State (%l} ZIP t� �U/ �t � E-mailAddre Vit(� o4 "`I 1�1 e d , �5 �"' ,. t�i ,AI,g " o OWNER'S AUTHORIZED AGENT Name Phone Cell Phone Mailing Address City State ZIP rs E-mail Address APPLICATION BEST CONTACT Name Phone Cell Phone Mailing Address City State ZIP E-mail Address ARCHITECT OR DESIGNER OF RECORD Name Phone Cell Phone Mailing "'i v k Address City State ZIP @ Qa49 A /O r" Q Address CIVIL ENGINEER OF RECORD k$L/ILLU INam Phone Cell Phone eVY: �-, - „, Mailing Address City State ZIP E-mail Address STRUCTUAL ENGINEER OF RECORD Name Phone Cell Phone Mailing Address City State ZIP E-mail Address GENERAL CONTRACTOR Name ��! r' _Phone _q ?C Go2g5 _Cell Phone S,G2 �°+ Mailing_ � 7 f ` /] _ (C% . l'l I Address uL City �ti\ State ZIP Addre J-CtS.*. S /� Address ( � C(iG G r CC)ri,1 INSPECTIONS: The General Contractor must schedule inspections online. a y I; Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Iges and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a per alc sinr t018 presume to give authorityto, violate or cancel the provisions of any other state or local law regulating construction or t r ance of construction. It is my r sponsibility to review the approved plans and any comments that are contained them ti E ENT structure an r j c i built in compliance with all applicable codes. Ir Contractor /j 2- LI I J Signature `,,,___.�--1 Date ff ® Check if yo ‘ e a tested owner builder(single-family homes only).You must take a test and complete the owner/building affidavit. (CITY USE LY)Owner builder approved by: Date: Affidavit on file CITY OF ASPEN August 130 S. GALENA ST ASPEN, CO 81611] PERMIT NUMBER: ADDRESS: /.) /C 'H.., COMMUNITY DEVELOPMENT DEPARTMENT ASBESTOS VERIFICATION AND CHECKLIST � THE CITY OF ASPEN ASBESTOS INFORMATION Asbestos is a known human carcinogen and is an airborne hazard.Once airborne,asbestos fibers can stay suspended in the air for days, weeks,or even months before settling out of the air.The fibers can easily become airborne again from a minor disturbance like turning on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos hazards that could expose people to asbestos in the future,long after the renovation activity occurred.The airborne asbestos fiber concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home. The 1989"ban"on asbestos-containing materials is commonly misunderstood. In fact, in 1991 the U.S. Fifth Circuit Court of appeals vacated much of the so-called "Asbestos Ban and Phaseout Rule"and remanded it to the EPA.Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing,or distribution in commerce of many asbestos-containing product categories was set aside and DID NOT TAKE EFFECT.Therefore,ALL demolition, remodel or renovation projects must determine if disturbed material above the trigger levels contains asbestos. ASBESTOS CHECKLIST ®Yes lNo Residen}tii*al: Will you be removing more than 32 sq ft, 50 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel —examples are drywall, linoleum, ceiling tiles, roofing materials, etc.? ❑Yes 4No Commercial: Will you be removing more than 160 sq ft, 260 linear feet (e.g., pipe insulation), or the volume ' 'l'2quivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel —examples are drywall, t(M ' 6t, carpet adhesives, ceiling tiles, roofing materials, etc.? If 09sFaBis.Wer is YES to any of the above, you will need an asbestos test before you can receive a building and/ 6l ILBMVPPpermit. You will also need to provide plans indicating areas to be demolished and determine if a CO state demolition license is required. A state certified asbestos inspector must do this test and the test report must be submitted with the building permit application. If the building has asbestos, a state certified asbestos abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building Division stating that all the asbestos has been removed and that the air is clean. This letter must be received BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state.co.us/ap/ asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof of current state certification.) If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the Aspen permit app. This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE: A copy of this demolition permit app must be submitted with the initial building permit application. When the CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our permit. I hereby certify that the above information is true and complete. �- - Owner J U ttP, �%'�VY Phone# �� 3 f �j� (2S.3 :''vvll/i' Applicant (print name) Phone# Applicant Date q f *f I I Please call the City of*en Environmental Health Department at 920-5039 at any time if y a questions about asbestos, inter*ting your test results, or other matters. t CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CO 816111 PERMIT NUMBER: ADDRESS: M jaw -1v )A) COMMUNITY DEVELOPMENT DEPARTMENT I 0 LIr, I I ,TI 0 9 0 LI Tile CITY of ASPEN • Applicability: All development projects must comply with the City's zoning regulations, including height and location, and are subject to periodic inspection during construction and a final inspection prior to project completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen shall verify height and/or location compliance through submission of a survey report. Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance through this method. In addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/ duplex development or other projects where compliance may be in question. Independent of this policy, all projects must comply with all applicable zoning limitations. The Zoning Officer will inform the applicant during building permit review if verification will be required. However, circumstances may require zoning compliance verification of a project which is already underway. Timing: Height verification should be accomplished at a point of construction when enough roof structure is in r plac'' ° 4ccur Jy measure the structure yet early enough in the process to still make changes if the structure is too fa I. Location verification should be accomplished at a point of construction when the final exterior of the ietytnirezerige accurately measured in relation to setback requirements. Applicants are encouraged to confer 13 with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to pergPrreir own verification during construction to ensure the building is progressing to plan, including the JIWIVENTEtion of foundation forms prior to concrete pours. Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The City's Zoning Officer can assist in determining which elements of the structure should be measured and if natural or finished grade should be used. The report shall include the following information: 1-A brief cover letter with the building permit number, name of the project, name of the owner and general contractor, with a written description of the measurement methods including date(s) of measurement. 2-For location verification: A plan drawing showing property boundaries, permitted setbacks, building envelope (if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all exterior veneer or other exterior treatments), and the location and dimension of each observed measurement. 3-For height verification: Elevation drawing(s) showingthe natural or finishedgrade oft -. • - - , g g( ) �� f° permitted height, building`elevations including the nominal roof form (inclusive of the fi t e o t r . sheathing or weatherproofing membrane but excluding all exterior surface treatments such mhzc s lringles, or other veneer treatments orornamentation), and the location and dimension of each observed measurement. Additional roof plans showing location of measurements may be necessary. 'EN (I CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CO 81611j F PERMIT NUMBER: ADDRESS: ' � I t '(�Z i - It COMMUNITY DEVELOPMENT DEPARTMENT av • r ♦ TFIE CITY OF ASPEN • All applications for a building g permit within the City of Aspen are required to include a certification of compliance with applicable covenants and homeowner association policies. The certification must be signed by the property owner or Authorized Agent representing the property owner. The following certification shall accompany the application for a permit. ADDRESS '24V Y"( ) f V C UNIT# PARCEL ID R \ � I, the property owner, certify as follows: (pick one) ❑ This property is not subject to a homeowner's association or other form of private covenant. $] This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit do not require approval by the homeowners association or covenant beneficiary. ❑ This property is subject to a homeowners association or private covenant and the improvements tErpposed in this building permit have been approved by the homeowners association or covenant beneficiary. 10/29/2018 ASPEN a derstand'the City of Aspen does not interpret, enforce, or manage the applicability, meaning or effect of private covenants or homeowner association rules or bylaws. I understand that this document is a public document. Owner Signature Date f 711 f i ) Owner Printed Nam J VU,(( OR Authorized Agent Signature Date Authorized Agent Printed Name OCr272o6 ASPEN ( CITY OF ASPENAugust2ol7 130 S. GALENA ON ,,'_4 „2; w, 0 81611j PERMIT NUMBER: ADDRESS: 1/0 /-&t K Jj () COMMUNITY DEVELOPMENT DEPARTMENT VALU ATI7• AFF A ,,,I VIT THE On OF ASPEN � r AFFIDAVIT POLICY All applications for a building permit within the City of Aspen are required to include a certification of compliance with building permit valuation requirements. The certification must be signed by the property owner or authorized representative. The following certification shall accompany the application for a permit. I, the property owner or authorized agent, understand and certify as follows: City of Aspen Ordinance No. 40,Series of 2016 adopts the 2015 International Residential Code (IRC) and International Building Code (IBC)with certain amendments. These codes define building valuation as follows: R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems, including materials and labor. 109.3 Building permit valuations. The applicant for a permit shall provide an estimated permit value at time of application. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in the opinion of the building official,the valuation is underestimated on the application,the permit shall be deiied,,unless,the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. 10/29/2018 Cit �V indicates that permit valuation includes materials and labor for the structure and mechanical, � �Ll� bing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as 11L�I�i DE PPcf�l�'�, audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction such as equipment rental and contractor fees. Finish materials such as paint, floor coverings, tile, cabinets and counter tops are included in the permit valuation total. Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development mitigation fees, trash removal, and cleaning are not included. I certify that the permit valuation entered on the permit application for this property complies with the above valuation requirements. I and rstand that this document is a public document. Owner Signature: ' r Date: � (�L1I2� Owner Printed Name: JVl L H, �-t-(it.-rf/ A or, Authorized Agent Signature: Date: Authorized Agent Printed Name: OCT 27 2018 ASPEN BUILD DE NT CITY OF ASPEN August zo17 130 S. GALENA ST ASPEN, CO 81611 PERMIT NUMBER: ADDRESS: '/A) 41 a, COMMUNITY DEVELOPMENT DEPARTMENT • I •r 'rLIL DI I .: I ' ell Y THE CITY OF ASPEN • 4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/ elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items unique to the project. 5-The report shall include a written description or drawing notes of the benchmarks or control points used to establish property boundaries, setbacks, building location, building height,and grades for each measurement. 6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in the approved building permit set. 7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who conducted the field measurements certifying that the field measurements areaccurately represented. Review and Acceptance of Report:The Zoning Officer shall review the report(s) and either confirm the project conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets the zoning limitations for the property or shall determine which elements of the project are not in compliance. The Zoning Officer may request additional information to verify zoning compliance, which may include but is not limited to additional survey work or a site visit. 440 it.IL L61)1 i-9"/yi20143the survey report must correlate with representations in the approved building permit set for acceptance. Modifications to field conditions or amendments to the building permit may be required. E l ILA'determination of non-compliance shall result in the issuance of a correction notice and possible work stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the construction process to minimize disruption to the construction schedule. Acknowledgment: I (contractor name) understand this policy. I agree that this project will comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this project complies with all applicabl ,oning limitations. Contractor Signature: / Date: c s lJ OCT 2 7 2018 ASPEN BUILDING DE' CITY OF ASPEN August 2017 130 S. GALENA ST ASPEN, CO 81611)