Loading...
HomeMy WebLinkAboutFile Documents.111 W Hyman Ave.0227.2018 (2).ARBK ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT rc) SCOPE OF WORK CHECKLIST S TI Te CRY or ASPEN LAND USE QUESTIONS If you check any of the boxes below, please consult with the Planner of the Day(planneroftheday@gmail.com)before submitting your permit application. Does your permit involve any of the following? ❑ Part of an approved COA Lard Use Review ❑ Work involves Landmark Parcel or Historic District ❑ Work affects net 1 asal3,le, net lit: -;or ❑ Located in 100-year flood plain or within 100' of high non-unit space water mark ElWork involves lot s I tir g or combining a lot 0 Work involves changes in occupancy to structure ▪ Work involves exter or of str�cture El Changesto elevator or stair configuration ❑ Changing the number of residential units ❑ Changes to the use of existing structure or space ❑ Changes to number or location of onsite parking ADDITIONAL SCOPE OF WORK QUESTIONS Does your permit involve any of the following? ❑ Exterior lighting added or than ed ❑ Work involves exterior wall penetrations ❑ Work involves roof pene ra on , < 0 Work involves digging or excavation ❑ Work adds, removes, or c ge ❑ Work involves restaurant or food service plumbing fixtures ❑ Disturbs 1,000 sq ft or more of oil within 0 Affects parking spaces/meters, loading zones, or alleys 12 months ElWork occurs in public right of way 0 Adding structures or systems over utility lines ElWork affects trees or occurs within the 0 Work within City Mall boundaries dripline of a tree RECEIVED I CITY OF ASPENAugust2ol7 130 S. GALENA ST I ASPEN, CO81 421118 ASPEN 'BUILDING DEPARTMENT PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DESCRIPTION FORM - IRC & IBC THE CITY OF ASPEN BUILDING CODE INFORMATION ❑2015 IRC F 2015 IBC 0 2015 IEBC ❑ Other(Please Explain) Code Editions (As Adopted and Amended) (As Adopted and Amended) (As Adopted and Amended) Fire Sprinkler System I Existing? allo I Required?ea I Type ❑ NFPA 13 0 NFPA 13 R 0 NFPA 13 D Type Of Construction ❑ VA 0 VB❑ IV 0 IIIA ❑ IIIB ❑ IIA ❑ IIB 0 IA 0 IB IFire Alarms Installed ❑ Yes❑ No Required Special Inspections ID High-StrengthBolting 0 Epoxy Anchors 0 Structual Steel Welding 0 il\-- ❑ Permanent Micropiles 0 Sprayed Fire-Resistants 0 Other Energy Code Compliance 0 Prescriptive Table 0 Other 11`J I ❑ RESCheck UA Alternative ❑ COMCheck UA Alternative Exterior Energy Use/ Total Approved On-Site Snowmelt Spa _ Pool (✓ n (Existing+ New) Building Type/ I 0 A ❑ B ❑ F_ ❑ E ❑ R_ I ❑ One Family0 Two Family Occupancy Group B ❑ B (A<50) ❑ H_ ❑M ❑ S_ R C ❑ 1 ❑ U C Townhouse UNIT DESCRIPTION AS PROPOSED Gross Area of Building: Gross Area of Unit: ADU BUILDING DESCRIPTION Occupant Load: Is there an ADU? 0 Yes F_No #Stories Above Grade Z #Stories Below Grade I # Living Rooms Attached Garage Detached Garage Carport # Kitchens Parking Spaces , / 1 Parking Spaces Parking Spaces # Full Baths /A # Bedrooms �-1 # Full Baths 5 Deck Area #3/4 Baths r/ # 1/2 Baths # 3/4 Baths # 1/2 Baths I # Bedrooms # Kitchens I #Wood Fireplaces #Other Rooms(List) #Gas Appliances #Gas Logs 3 BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical &Storage) Basement i-P' Main Level N 2nd Floor 3rd Floor Additional Reviewed By: Date: R_E E IVE D I CITY OF ASPEN January2018 130 S. GALENA ST I ASPEN, CefilIWPJB ASPEN '3UILDINC DEPARTMEN- COMMUNITY DEVELOPMENT DEPARTMENT ' E HOMEOWNER ASSOCIATION COMPUANCE FORM M.4.0ii:.a Ws?rs5 tme a Nate ls pr.mut 441t,r+the illy at aspen or teepa red to a ckatie a terti kailm -` ,.,4nri tt't pie otaRtasorts avid laN44.0e104t+a};vicesttan ptohri.ri 1 he tilrficabori.rt<vt trc lortedtri OW 1300018' a a@e Of*Wiwi rtttntaNiatttne ttw p<j4or y avow the k4iow rt ft4t+04 sttaa Xiot par94 ttb atiPlitown , Algroans t W.Jd_ti . Oil . %e.a. _. ....__ a wm.4,a« to r.,Ito Fel4ecty-owner,err trty as:&wv (Sark a0*a3 1'.0,PfNiffty 4 Owk tut! t to a homeowner*lowladon us cnl,r t:rn of W*11.ie Ceotelart in T'sw prege•'h:�uitode t to a haunt vrOatka sr..co uulor tia ale irat*coViatartt&AI tile Fe/ are...ti 1411 s, Wa IDOtt in&al bualSkt Perm*da not'Moot 10100040.by the honrtaPreettas aiton:aim Or Conrnant 0 *As v+oiertx it wDyzKt to a tiOnta'o-va ne a asstx aetain of eatt tkaWlaaot aaad the keels.:Vtrtoma#> :-' salon Oh tuaktin4 Ireflautba tow+aa vu edbythetdfloan.oets-••• ctati n,Astoter:ua.Grn.+tt. e. " t ootletitand alas t*y o4 Moan titwanCti{ratesp et„enforce,or rnn vaoc the 'e A4a'3nind:cas 0*C1 4 Mirsatr cleteeatttt IX txtif5envenet aasflrcatf tint*cc 2Wrtitat i r v*:Nu-Ad that than dottu nrr t 4 a prttat+a: loci atatat. a i 1 .,ar,a ,Att.ar. a igtilatiale Owner*XI:money 1rmrfrd'ha*at y`.,.....:...,..,.,_..._._ N - • I. - - t CITY OF ASPEN-. 130 S.GALENA ST IASPEN.CO 81611 RECEIVED 09/11/2018 ASPEN BUILDING DEPARTMENT PERMIT NUMBER: ADDRESS: COMMUNITY DEVELOPMENT DEPARTMENT ZONING COMPLIANCE VERIFICATION POLICY TtIF CITY OF ASPEN 4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/ elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items unique to the project. 5-The report shall include a written description or drawing notes of the benchmarks or control points used to establish property boundaries, setbacks, building location, building height,and grades for each measurement. 6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in the approved building permit set. 7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who conducted the field measurements certifying that the field measurements areaccurately represented. Review and Acceptance of Report:The Zoning Officer shall review the report(s) and either confirm the project conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets the zoning limitations for the property or shall determine which elements of the project are not in compliance. The Zoning Officer may request additional information to verify zoning compliance, which may include but is not limited to additional survey work or a site visit. All drawings of the survey report must correlate with representations in the approved building permit set for acceptance. Modifications to field conditions or amendments to the building permit may be required. A determination of non-compliance shall result in the issuance of a correction notice and possible work stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the construction process to minimize disruption to the construction schedule. Acknowledgment: I (contractor name) DEAN) r'vM82,6wcVt-/ understand this policy. I agree that this project will comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this project complies with all applicable zoning limitations. Contractor Signature: - e)-71,1 Date: 9• J ' id RECEIVED ( CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CQ8WPI8 /yGPEN 'BUILDING DEPARTMENT 111111.11.111...1/111MMIMIMI _ M1TN1JMBt __ COMMUNITY DEVELOPMENT DEPARTMENT VALUATION AFFADAVIT AFFIDONff POUCY All apolscapons Sof a building permit Within the City of Aspen 4IT required 1 •cluik-. cortfication of cornirc tb beitcrang pertain vaaciarion requirements The certsfscation mint he signed by the froperty Crrarer Or•1411rtOrited rePteStOlative, The following crrisfication shall accomppty the appilltation for a Permit . t,the property owner or authartvid agent understand and certify as Wows Ow of Aspen Ordinance No..40,Series a 201t3 is6Opts the 2015 International gesirstental Code filztCl and toternational PutieVng Cock.41:10 witth certain 4sosendowtrits..these ceides deft6e tsmichrig valuatinin as follows: 14,1083 Building puma valuations.Building permit saltation shall include total wispy of the won tea which permit i beVsg issueiV such as electrical,gas,mechanical.plumbing equtpment and other Ornament systenn, including materials and Labor 109-3 lksiblevf permit eaksartions.The applicant for a emit Pall provide eo es,10P,Iteti permit value at pine of application.Permit vakiatirsess shah rndddC total value of leo*,mewing materials and Iabot.for which the Permit rs teeing hazed,such as electrical,.gas,mechanical.Pkorottiolt mitglxnent Arid Pennant-Mt ViStr`roa-it,in the opinion of the building4cia,the valuation he undlayescirrated on the applitationc the permit shall be denied,unless the applicant can show detailed main:sates to mem the approval of the hulking niffital fcnaf permit valuation shall be set by the Istrds,kr1 offatiat City pokey Indicates that permit va cation includes materials and Libor te*the struclmy and mechanics, electrical,plorisaiing and gas,hie sprinkler and clewtor systems and equipment Peimanerit systems sigh as audio visual,lighting and MAC controls are included in the total as are tenses thiekl4/fretaeti to COMVULTIOR ae eamipmerd rental and contact or tees.Fetish masers*such as paint floor coverings.tile,cabinets f$,d tountet tops are included in the pernift vidomwri total. Costs Such as archltectv4iand eftagleering design fees,landscaping and planking,tap lees,development rnidgrOon toes,trash re-natnal, wsd dearest are not inctoded citify that the permit valuation entef , t ins application for thh ptopetty corrsplie-l.ss,ith the zisbous, vailkaOan requirements. I ulderstanq that this document is a pubay document - . .1) ()wrier 94 ineoger -— e Owner Printed pen :-4\4 k.6 kW:Aided Agent Sigraitry, _ _ Date _ itutitorited Agent Pegged Name: CITY OF ASPEN..-.0 130 S. GALENA ST ASPEN CO 81611 RECEIVED 09/11/2018 ASPEN BUILDING DEPARTMENT c o " En —I Eft v a .. = o rD �e3 a) m 0 , tw ,. __ __ M4.rattTnufa.PER.___ - - _ _ _ 3 cr COMMUNITY DEVELOPMENT DEPARTMENT _ 0 1111 -I ASBESTOS VERIFICATION AND CHECKL.iST i «— In ASBESTOS INFORMATION M. A ibretal'S a to.a,,.,rewuyiF s.asin000n.nd.t...aet,nt Mora G i:. �s�3n star w, - •..Oa.a. 1fte.en belaft swing coot,at rh.rr Mr#6nr eon a.)etr re- , :.:s te'Rna ..+n ., t.-: :r,a:a cd,dinune rrr.connt+Iktd astorm nataite+�.0 - n.:r-e.That cmM vfNMxt a.myetr,nq�i:1.1 Rapp,,e4 M wwrr3+,yetiuwr br. e.a�-,,; tin abts�.to th.dams.,tu�p ahn V.etw+sX.+rer,+er S�iw�er"c!TM+feir ne tsyrsecn Abr. '"'"Ot'.,at*n, e..IIM'UM C67.0:1.:010,ay revue in timtrr.ve•.Rows.•to 7,rvee 1 ere!hra.: mi es t or r tn..,. e Ttte Hit"on'an attesmeawirewarm e.ataetak In safmg okt sd.w.wad-U(ace..m MI TM U.S FAF Owl Cot et+SNh+s v,•rrited~eh Q the soweee•0.46..40ti ail ape Pwr,.n.a N.+r AN eaer.,.snd a Na ela t*.Los..na[M 1E tflo on twat I WA Ir., 0 0 7C pn T.(U.S. .tmport.AN, ,omcassx+a.a.*51,'e sal.►.n:,„near of fernT,.tryrssorco4kalrei wedvci eseafxm e.ta. 0 i C m � ..t orate aey C1 f MCA Tait tHCC1 rh.e(4nv.at:a+moi7Ni,I..'Md a n w...ono ur�b ..a ats tn deternrt,.t MAsxwbtdaa. tmi tQ 0 ate.*anal mareinvll r¢vg6.taieestnc Q D ASBESTOS aaFOfuST -_ v f ❑Yes LZ7IO Re udetrear_Will you he comrrnne rrIOre Man 31 soft,5t)/near feet it.&.MINI fettultedlni,ce the aCl..ne �'• fD Cr Cr' C to eat nl of a SS-sailor•drum of arty material besames[[outer,swoon.breaks,W ritft-,C.ienCift are IQ 0 '� Cr Noricum ceiling Mrs.roofin*materials,etc? dryvral, N [D 10 r n 0Yes pi c O- A CommiNtIat;Vf Hit you he millOsIttry nto a than 1b i act R.MA time fart icy,.pipe i+fir•i.of the volume N M ' equeraleto of a SS-gallon drum of any material besides commie,wood,bricks,or steel..aYampies art dermal; ljtalewn,Carp!;,Carpe t adhesives,coming tiro.rpnitr u.0 mrials,etc? rD 7 s II the answer is YES to of the above, 0 cD +Y you W Mid:se afl7eiOai reel before you can receive a budding and O rp or demolition permit.You will also need to provide phew lttdApttrrg won 14 he ttamdYshad rid determine It a tQ CO slate demolition kern*is a(r uIrad.A-state certhi d ashy-AM Lssle'ctoa mutt do ttrs test and the test report Oo a must br:utanittyd with the bu4d.rrg perm:appt.tliwtr.It the husking has a(..begos,,a state ctrMied asbestos 6 ahattaernerd!Erin muu remove it.Atter removal,the:abatement NM trmrrst petnitde a letter to the Needing N its Oepatt.ncat stating that 0 the albrscos has been removed end that tine air is dean.This letter rmate be recea.vd A BEFORE a permit well be issued.(See the local or sratrae de ldNvw et l>FeeaOi iat,or hats//tamouctipbe stare CD /(.0 ro utjaW/asbestos/ridt7.btrd for[Retitled asbestai inspectors and'abatemdta companies..ALWAYS ash for proof -o '�J of current state arms ation4 t.0 tl a era demolishing the bulldog.you must vetoers a(Itosoboon pennn ego with the CORN!in addition to she v yore Aspen permit app.This form may be toured at https4,Arnmu,cdurada. BSkdplte/+sbeusn-forms NOTE- _ A woe ott this detnolton permit pup must He itdbmitfed rootImo tnittal Narking poem application.When the n0 mrm r aNF approves naa the app.theif issued per must be given to the Aspen 6ulldnit DeptWhet we tssue our per mil. I hereby certify that the above Information is true and complete: rs vrta> }}, �f r_- r'�.. , "! _ t'ho"r a '7 t-- % _ k �) aariarvo(pent name) Pe"0 V1 rg.W.Sly _Phcme 0_.,.,1 .t ,Lt._7f�1=' _./ r .e ptic4M Signature. 1,0 . t ifP-.?J E' .y,..Ott '? :(Lt;. Prt'a to calf I he t_ity pf A.M.;,F ns...r r't e..,tom!It :tier;lloyartn'xfrd at`I •5,73?iet Ow tldno iI yo4 haw mars o,1 f•... , lame i,,,.. ..r,rn:attrs- `(c1T'1 01- A N , . T J 130 S. CALENA1 ST [ ASPEN, CO 81611.)� RE �VED 09/ 1/2018 ASPEN BUILDING DEPARTMENT