Loading...
HomeMy WebLinkAboutFile Documents.610 S West End St.0037.2019.ARBK DATE: MASTER PERMIT: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT a. BUILDING PERMIT APPLICATION PROPERTY INFORMATION`,/ ,/ ^� 7 7 p ADDRESS C)5/ YV s7 klv�®q $7. UNIT# 2GS 2 PARCEL ID# d��7/ `, r7)4 l,414 cnO _ LOT+�-'IP4• 2 "7#W7— ©R SUBDIVISION i� r Ca�/���N1JJ BLOCK f45P'tr/ 9i8 -la71 zo?Aierco�I v U E2(0/ ',cam OWNER NAME �YY L_7'A CELL EMAIL BEST CONTACT $r VV' P41,Aine' CELL 7$-`p ¢ EMAILZ0/4erep/#1148 c., •caw) NAME PROJECT DETAILS (READ DEFINITIONS BELOW) CO Pf T o`v `ITSEuTIRE7Y DESCRIPTION OF ',En/2©� B,q( � { WORK IN DETAIL PROJECT 7/� Use of Building Class of Work Fixture Counts Important Review Triggers VALUATION ❑ Commerical ❑ New Toilets,Bidets Major Engineering g Review Ed. Multi-Family ___Bathtub •Projects involving less than 50% SgFTOF 0Addition BUILDING S. ❑ Single FamilyLavatory(Wash Basin) hardscape area and work affecting WORK AREA OD F. g 0 Alteration❑ Mixed-Use 0 Repair Shower 75%or greater of unit sq ft j�9 S -- ❑ 0 IFFR Kitchen Sink(+Disposal) •Projects involving greater than UNIT SCE FT Dishwasher 50%hardscape area and work LOT SIZE 0 Tenant Finish Laundry Bar,Utility Sink affecting 50%or greater of unit (SiaFT) coN.0O Will there be ❑ Demolition Clothes Washer soft SO FT OF SOIL /�J any roof/wall 0 Change Order - Floor Sink •Projects involving 1,o00H sq ft of DISTURBANCE •" penetrations? CIFloor Drain soil disturbance area ❑ Yes Water Heater(Pan Req) NEW SO FT h//1-1' CI No e Gas Outlets Water Efficient Landscaping Water Treatment •Projects that trigger a major BUILDING I -gOther �(�/_ engineering review FOOTPRINT N NOTICE: This permit becomes null and void if work /Y �� �? •Projects involving interior or construction authorized is not commenced within alterations affecting 50%or mare ARRERADSCAPE A11�} _ eo days,or if construction or work,is suspended or of exisiting gross square footage f abandoned`'or a period of 180 days at any time after work is commenced. ZONE R15/L/PD DISTRICT 1 Project Valuation:Cost of project as defined in Valuation Affaclavit. zSq Ft of Building Work Area:Total square footage of interior area undergoing change or reconfiguration. 0 Unit Sq Ft:Gross square footage,not FAR,of permitted unit. Lot Size:Total surveyed square footage of property. PPRO F-- Reviewer Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbed Reviewing Needs Date Z New Sq Ft:Total added square footage for additions to net livable or net leasable space. Department Review Sign-Off Approved i; Building Footprint:Grade floor square footage of the permitted structure. pC x i b 2/2 2/1 9 © Hardscape Area:Square footage of impervious lot surface, x SV 3/13 Zone District: Underlying zone district of permitted parcel. Zoning HPC Building x TF 3/20/19 SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Fire Building Building 387 . 50 I Engineering 251 . 88 Parks Impact I j Review Permit Fee -CMP Engineering Zoning School Lands Water Review Review(50%) 162 . 50 Dedication I Stormwater _ Zoning 162 . 50 CMP(50%) TDM Impact Sanitation Review(50° I Env. Health Energy Code REMP Pedestrian I Review 1 Payment — Amenity i ;Parks CMP(50°.0 I GIS } Housing Cash in Lieu Landscape City Use ! Efficiency Parks Review Water Tap Tax ! Approved DAM 3/21/19 I --*--- County Use i Sanitation I i To Issue Utility Review, 5 5 50 i I lax i I Issuance ErFRiftel f CITY OF ASPEN January2019 130 S. GALENA ST I ASPEN. 022%611. 2019 ASPEN BUILDING DEPARTMENT ...—Th ADDRESS:W, `1147e17.410 .5--77 eAe02,_ PERMIT NUMBER' TETETTT COMMUNITY DEVELOPMENT DEPARTMENT -, BUILDING PERMIT CONTACT SHEET FOR PLAN REViEW QUESTIONS. Name is; „...- -..z.: i't IC6 /re4rPhone "7025-gi---,217 E-mail --. i'. Jr‘i ' FOR FNSFEE I'CI. 1ES3'NS Name ..57-E---1/0 Zockas//iart Phone 9f ff"-/•••/..7,--- ' - AP b..CC? Ceekt'' ' 'i C c VA OWNER A Name&for .. •ot Phone --/4--ha7li- Cell Phone valofe5:wedE.Aeo cr City A.9F-A/ State e0 ZIP 0141// — • idnrgss 2.4941e_r C.• /)07ril ei-a '&eV, 0.4P itV/ 3iEDAGE--..i Name 57Z.-1./ . -,"1%,./e--/ie Phone 7 -r-iv....7 1- Cell Phone '" jgerjeNEW I far:A il"-40, eo( Yoi aty&/fe A zar- State ap ZIP iiiltirgss_2 a Me-1"'04:,,20/Vae-74e eicci/e-, 0 0/''' ' - APPI t_A7 i3-.1 Br.„1,-,-,i-cii.,-r,a7T Name "Z'''OAI`e• "ie.- A.A7 el/ArAerphene f 4,2,3"-- r .;" 7 cot phone -65 -,...1 7 - mailing P.P• *0 e*,›C 9.9s--- C /9.920-Ai state e-v ez.6 /A. Address ity ZIP / • EAtrOgss_ r)56,i4Q"111- llee "Al it/ '6 ef 11,1- AROI-CIFECT Dc Sir Ni`i:l OF RP.OR Ei OR _ - ._ Name_ P-.044g '''. ,n1;' A 'G.4LITO '-?•-• Phone 1•25-ff.?' 7 Cell Phone 7„2,-5-- saff - 'Altizgs i'l). = . leo/ 7.3- city_itilagFAV state ezz' no E-mail Address FIG Nal;C-*i-ErEii-iiri Name / Phone Cali Phone Mailing Address ",/tarl i city State ZIP E-mail Address ‘.,TRJrt.b.s, i-V•ArUl' "t7 'qt;,N, Name /;,1_ Phone Cell Phone Mailing Address City State ZIP Email Address ',.--:i Iiii-1-1/4i.,_ .-.ON RACTOR Name ZA,V/0 (C,a,C1071. ‘,72if, Phone - .; ' - A. Cell Phone Zile% AV. beK 141 City ae/Xv11-1--- State CO Z IP‘/6A1/ . z_ ilgl. 241/lier--e,ri-b-iy-e/e--1---a. eki(c/re ,a19m, _______ INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Oevelopment-Forms/to do so. I hereby certify that I have read and examined this application and know the same to be true and correct, All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. i 's my r sponsibili• to review the approved plans and any comments that are contained thereon and see that the structure and/or , ` 1 pliance withall applicable codes. contractor .-,`7 „i--' Signature 444 4.-IlA Date _ — -. , 1„, 0 Check i yOu are a tested own uilder( intle-farrnly homes only).You must take a test and complete the owner/ ,iff,t,ii.V ',.Cp (CITY USE ONLY)Owner build'r approved by: Date: Affidavit on file 2/22/2. 19 ASPEN BUILDING DEPARTMENT �ADDRESS:/�/�'�� t�*��'��` 4� PERMIT NUMBER: ���D�N������ ���y�N��N���� ����������� v~��,�,n�^��/�" v n DEVELOPMENT ��^-xr�"^ , ^�"^-^� , ������ ��� ����� CHECKLIST � ^ .�*~��� u~ ��o ����"�o� =�oou~=�o�o.u~� o THE cmor km� LAND USE QUESTIONS if you check any of the boxes below,please consult with the Planner ufthe Day(plan nemftheday@gmaiicom)before submitting your permit application. � /� Does your permit involve any of the following? Pv«/ Part ofan approved CC)A Land Use Review 8 U Work involves Landmark Parcel mrHistoric District Work affects net leasable, net livable, or Located in I00'yearflond plain orwithin 100' of high non-unit space K U water mark 8 U Work involves lot splitting or combining alot Work involves changes in occupancy tnstructure �� ��� \Norkinvolves exterior ofstructure Changes to elevator or stair confi8ura�on U8 Changing the number of residential units �~~� Changes to the use of existing structure orspace Changes to number or location of U U nnsiteparking ADDITIONAL SCOPE OF WORK QUESTIONS Does your permit involve any nf the following? �/^' / , F1Exterior lighting added nrchanged Work involves exterior wall penetrations Work involves roof penetrations Work involves digging o,excavation �--� Work addsremoves, orchanges K~—U Work involves restaurant nr food service U U plumbing 6tures K U 1-U Disturbs 1,QODsqfturnmoveuf soil vvithin Affects parking spaces/mnetem, loading zones, oraUeyu � 12nnonths VV �� systemsU U Work /n public right U U Adding structures or systems over utility lines � Work affectstrees nr occurs within the �~1 orkvxithinCity K�a|| boundaries drip|ine of tree u~.� VV REr,EIVFr., ^ 2/22/2019 ASPEi� BUILDING DEPARTMENT ADDRESS:,4fr 5' UWr PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT HOMEOWNER ASSOCIATION COMPLIANCE FORM THL Cin Of ASPL:, All applications for a building permit within the City of Aspen are required to include a certification of compliance with applicable covenants and homeowner association policies. The certification must be signed by the property owner or attorney representing the property owner. The following certification shall accompany the application for a permit. ADDRESS (yam` 11/ I j / UNIT# PARCEL ID# c27 7/11 p 47e 9 I, the property owner, certify as follows: (pick one) ❑ This property is not subject to a homeowners association or other form of private covenant. ❑ This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit do not require approval by the homeowners association or covenant beneficiary. This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit have been approved by the homeowners association or covenant beneficiary. I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning, or effect of private covenants or homeowner association rules or bylaws. I understand that this document is a public document. Owner Signature � L °�/ ' Date Owner Printed Name (.'u5e, OR Owner's Attorney Signature Date Owner's Attorney Printed Name COPPFIVED 2/22/2019 ASPEN BUILDING DEPARTMENT • ADDRESS:jib L✓✓ 'T r 2e2z. PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT ASBESTOS VERIFICATION AND CHECKLIST rYzc \ ASBESTOS INFORMATION Asbestos is a known human carcinogen and is an airborne hazard.Once airborne,asbestos fibers can stay suspended in the air for days, weeks,or even months before settling out of the air.The fibers can easily become airborne again from a minor disturbance like turning on an air conditioner.Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos hazards that could expose people to asbestos in the future,long after the renovation activity occurred.The airborne asbestos fiber concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home. The 1989"ban"on asbestos-containing materials is commonly misunderstood.In fact,in 1991 the U.S.Fifth Circuit Court of appeals vacated much of the so-called"Asbestos Ban and Phaseout Rule"and remanded it to the EPA.Thus,much of the original 1989 EPA ban on the U.S.manufacturing,importation,processing,or distribution in commerce of many asbestos-containing product categories was set aside and DID NOT TAKE EFFECT.Therefore,ALL demolition,remodel or renovation projects must determine if disturbed material above the trigger levels contains asbestos. ASBESTOS CHECKLIST ❑Yes No Residential:Will you be removing more than 32 sq ft, 50 linear feet(e.g., pipe insulation),or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks,or steel—examples are drywall, linoleum,ceiling tiles, roofing materials,etc.? ❑Yes❑No Commercial:Will you be removing more than 160 sq ft,260 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete,wood, bricks, or steel—examples are drywall, linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.? If the answer is YES to any of the above,you will need an asbestos test before you can receive a building and/ or demolition permit.You will also need to provide plans indicating areas to be demolished and determine if a CO state demolition license is required.A state certified asbestos inspector must do this test and the test report must be submitted with the building permit application. If the building has asbestos, a state certified asbestos abatement firm must remove it.After removal,the abatement firm must provide a letter to the Building Department stating that all the asbestos has been removed and that the air is clean.This letter must be received BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state. co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies.ALWAYS ask for proof of current state certification.) If you are demolishing the building,you must submit a demolition permit app with the CDPHE in addition to the Aspen permit app.This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE: A copy of this demolition permit app must be submitted with the initial building permit application. When the CDPHE approves the app,their issued permit must be given to the Aspen Building Dept before we issue our permit. I hereby certify that the above information is true and complete. Owner or�� Phone# Applicant(print name) C`"te}'-'V, V iLa..4 64/\ Phone# ct e)O` 9 I'fd5- / "O t'/ Applicant SignatureDifitA---, /7 Date I9 Please call the City of Aspen Environmental Health Department at 920-5039 at any time if you havRErcyEivED about asbestos, interpreting your test results,or other matters. L/LL/1019 ASPEN BUILDING DEPARTMENT u � �ADDRE5S: � e�` ���- PE0N\TNUN1BER: _ �����N������ ������������� ������������ COMMUNITY, DEVELOPMENT, DEPARTMENT v VALUATION �������U� --- ` ~=���» "="� �" " �=��" " AFFIDAVIT POLICY All applications for a building permit within the City of Aspen are required to include a certification of compliance with building permit valuation requirements. The certification must be signed by the property � � owner or authorized ncpresenta�ve The6oUww�n�cerd�ca�mnshaUaczpnnpanythempp|ica�onforaperrnit � � . . . � � [ the property owner o,authorized agent, understand and certify asfollows: � ( � � City of Aspen Ordinance No.40, Series of 2016 adopts the 2015 International Residential Code(IRC) and � ! ' � International Building Code(IBC)with certain amendments.These codes define building valuation as follows: ^ � � RI08.3 Building permit valuations. Building permit valuation shall include total value of the work for which o / permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems, � including materials and labor. � � � 109.3 Building permit valuations.The applicant for a permit shall provide an estimated permit value at time � / of application, Permit valuations shall include total value of work, including materials and labor, for which the � > permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in , � the opinion mfthe building official,the valuation is underestimated on the application,the permit shall be � ^ denied, unless applicant show estimates meet approval of building Final � , . building permit valuation shall be set bv the building official. ^ C��9mU��imdi��t�othatpernnitva|ua�on (ndudesrnateria}»and !aborforthestructuneand /nechanica[ � ' � electrical, plumbing and gas,fire sprinkler and elevator systems and equipment. Permanent systems such as � � audio visual, lighting and HVA[contro|s are included in the total as are expenses directly related tm construction � � such as equipment rental and contractor fees� Finish rnateria|ssuch aspaint floor coverin8��|e,cabinets and � � counter tops are included in the permit valuation total. Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development / � mitigation fees, trash removal, and cleaning are not included. � . . � � 1 certify that the permit valuation entered on the permit application for this property complies with the above ' valuation requirements. | understand that this document isa public document. ( � Owner Signature: Date: � Owner Printed Name: _ � or . Authorized Agent Signature: Date: AuthorizedAgentPhntedNa-—/ �l LJ84-�o k\C���Sf�»~\ ` ��\ m ����,��m � ���� " ^ Z/ZZ/2019 ASPEN ' m �� PERMIT NUMBER: ADDRESS*n«x/ ~� �Y �v�*�/ �°~�' COMMU�����N������ �����N��N���� �����T0��MJ� � NITY DEVELOPMENT u��_� rvnx � ��ux-�. � � �����U���� ��~�����UK�����~U� ��U���UU�U����~U���� ����UU�~�� ^--~-- � �m�,»�ov��� COMPLIANCE VERIFICATION v��n� POLICY _ ~ � ~ ` � 4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/ � ( � elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items ^ � . . _ unique to the project. � ' � 5-The report shall include a written description or drawing notes ofthe benchmarks or control points used to � � establish property boundaries, setbacks, building location, building he' ht,and0radesforeachrneasuoenxent. � ^ ! 6-AU drawings must correlate with the building locations, elevations, and grading/drainage representations in � the approved building permit set. � } 7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who � conducted the field measurements certifying that the field measurements areaccurately represented. . Review and Acceptance of Report:The Zoning Officer shall review the report(s) and either confirm the project / / conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets < ' the zoning limitations for the property or shall determine which elements of the project are not in compliance. � ' ^ The�onin�Of�c�rrnayrequastadddUmna| infonn�dontoverifvzunin�connp|imn�e, vvhichnnayinduUebutisnot � ' � � limited to additional survey work ora site visit. . � All drawings of the survey report must correlate with representations in the approved building permit set for � � acceptance. Modifications to field conditions or amendments to the building permit may be required. � � A determination of non-compliance shall result in the issuance of a correction notice and possible work � � stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the � � construction process to minimize disruption to the construction schedule. � ` , ' ' � ' | (contractor na derstand this policy. | agree that this project will � . comply with the the n�����nsma�nn�e�n|nQ���� ' ^ the approved building permit plans. I understapcti hat a Certi te of Occupancywill not be issued until this project complies with all applica§1e zo � Contractor Signature: Please have ; contractor print ^ Date' �3 / —� O8rD��. —~� i o i ^ � --- — | ^ | � ! � ^ � � ^ �� � | ��� ��0 ' 7 D ����_,*��m . z/2z/2m19 PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DESCRIPTION FORM - IRC & IBC BUILDING CODE INFORMATION ,/Y" '- CA,<%5/ i 2d 0 2015 IRC ❑x 2015 IBC ❑2015 IEBC 0 Other(Please Explain) Code Editions (As Adopted and Amended) (As Adopted and Amended) (As Adopted and Amended) Fire Sprinkler System I Existing? ®No ( Required?Ao I Type 0 NFPA 13 0 NFPA 13 R 0 NFPA 13 D Type Of Construction VA❑ VB❑ IV ❑ IIIA ❑ IIIB ❑ HA 0 IIB ❑ IA 0 IB (Fire Alarms Installed El Yes❑ No Required Special Inspections 0 High-Strength Bolting 0 Epoxy Anchors 0 Structual Steel Welding ❑ Permanent Micropiles 0 Sprayed Fire-Resistants 0 Other Energy Code Compliance 0 Prescriptive Table 0 Other ❑ RESCheck UA Alternative 0 COMCheck UA Alternative Exterior Energy Use Total Approved On-Site Snowmelt Spa Pool (Existing+ New) Building Type/ I p A ❑ B ❑ F-_ ❑ E R_ I 0 One Family 0 Two Family Occupancy Group B ❑ B (A<50) 0 H_ ❑M 0 S_ R C ❑ I ❑U C townhouse UNIT DESCRIPTION AS PROPOSED Area of Unit: 990 =°.' Gross Area of Building: Gross � d� ADU BUILDING DESCRIPTION Occupant Load: Is there an ADU? 0 Yes 0 No #Stories Above Grade #Stories Below Grade rt #Living Rooms Attached Garage Detached Garage Carport # Kitchens Parking Spaces Parking Spaces Parking Spaces # Full Baths #Bedrooms 1-0 #Full Baths L2, Deck Area #3/4 Baths # 1/2 Baths #3/4 Baths # 1/2 Baths # Bedrooms # Kitchens #Wood Fireplaces #Other Rooms(List) #Gas Appliances #Gas Logs BUILDING ROOMS AND USES BY LEVEL AS PROPOSED(Include Mechanical&Storage) Basement Main Level 2nd Floor 3rd Floor Additional °°° Reviewed By: Date: RE E I �) 2/22/2019 ASPEN BUILDING DEPARTMENT