HomeMy WebLinkAboutFile Documents.506 W Hallam St.0019.2019 (6).ARBK PV WORKSHEET
City of Aspen Version 11.3 Updated December 13, 2017
PROJECT ADDRESS:
Parcel ID#: Permit Number:
Collector Solar
Aspect, Degress Collector Tilt, Orientation
from True South Degrees From Adjustment DC side capacity Inverter capacity kW for kW Mitigation
Horizontal Factor (kW) (kW) credit Credit
Collector Group 1 15 10 92.80% 5.94 5.76 5.76 5.35 kW
Collector Group 2 87.00% 0 0.00 kW
Collector Group 3 87.00% 0 0.00 kW
Collector Group 4 87.00% 0 0.00 kW
Collector Group 5 87.00% 0 0.00 kW
Collector Group 6 87.00% 0 0.00 kW
Collector Group 7 87.00% 0 0.00 kW
Collector Group 8 87.00% 0 0.00 kW
Collector Group 9 87.00% 0 0.00 kW
Collector Group 10 87.00% 0 0.00 kW
Collector Group 11 87.00% 0 0.00 kW
Collector Group 12 87.00% 0 0.00 kW
Collector Group 13 87.00% 0 0.00 kW
Collector Group 14 87.00% 0 0.00 kW
Collector Group 15 87.00% 0 0.00 kW
Collector Group 16 87.00% 0 0.00 kW
Collector Group 17 87.00% 0 0.00 kW
Collector Group 18 87.00% 0 0.00 kW
Collector Group 19 87.00% 0 0.00 kW
Collector Group 20 87.00% 0 0.00 kW
Total: 5.35 kW
$ Mitigation Credit: $ 36,697.06
Instructions:
1) Determine how many collector groups you have. Groups are used to differentiate between collectors
(panels)with different tilts, aspects, sizing, or inverters. If all your collectors are installed similarily, you ?EIVED
might have just one group.
01/28/2019
ASPEN
BUILDING DEPARTMENT
2) Enter the aspect and tilt for each group. The solar orientation adjustment factor is automatically calculated.
3) DC side capacity is the total labled panel output kW in a group.
4) Inverter capacity is the recommended input power in kW of your inverter(s).
5) You will be given credit for the lesser of the labeled panel output or the inverter.
6) The kW for credit is multiplied by the solar orientation adjustment factor to get kW mitigation credit.
7) The kW mitigation credit is totalled and multiplied by$6865.32/kW to get the$ Mitigation Credit
8) The mitigation credit will be automatically entered into your RREMP or CREMP form. If your project has both RREMP and
CREMP, it will automatically divide the credits up, with priority given to mitigating the CREMP payment.
PREPARED BY: Date:
Print Name:
Signature:
Phone&EMail:
REVIEWED: Date:
RECEIVED
01/28/2019
ASPEN
BUILDING DEPARTMENT