Loading...
HomeMy WebLinkAboutFile Documents.250 S Original St.0294.2017 (14).ARBK 0294-2017-ARBK_BuildingComments_1 3-A-101 Basement Floor Plan.pdf(4) Page: 1 i• File Name: 3-A-101 Basement Floor Plan.pdf How is the dryer vented?Are Subject: PlanCheck you using an existing duct? If not, how will you route it and Author: nickt Color: ■ where is the termination? 11 Page: 1 _ i These plans are too small to - —, __ File Name: 3-A-101 Basement Floor Plan.pdf tom# --, Subject: PlanCheck print at a legible scale. Provide "' full size digital drawings. Author: nickt Color: • 9e� RECEIVE 11/15/201 Wel Page: 1 Water closet must have 15"from File Name: 3-A-101 Basement Floor Plan.pdf Subject: PlanCheck centerline to each opposing wall Author: nickt for a total of 30"of clearance. � v,- Color: ■_ • Page: 1 Provide more information on the File Name: 3-A-101 Basement Floor Plan.pdf 1- Subject: PlanCheck new mechanical room under the Author: nickt stairs. What equipment is being Color: • installed?What is the fuel type? Sealed combustion or is `„"v combustion air required? If so, how is it provided? Drawings depict a vent going to the common interior stair;what is this? How are you venting the equipment? Provide access to the equipment; clean up the drawing to clearly show the room size and door. 4-A-102 Main Level Floorplan.pdf(3) 7% Page: 1 File Name: 4-A-102 Main Level Floorplan.pdf Clean up the notes that overlay Subject: PlanCheck eachother on the main plan -; I south of the stair. i Author: nickt _— _ Color: • Pgid RECEIVED 01/10/2018 ASPEN BUILDING DEPARTMENT Page: 1 Guard must be 42" high. (2015 File Name: 4-A-102 Main Level Floorplan.pdf Subject: PlanCheck IBC 1015.3) Author: nickt Color: ■ Ku I[ Page: 1 ' Provide the dimensions of the 1 File Name: 4-A-102 Main Level Floorplan.pdf Subject: PlanCheck new egress window. Must -- _ Author: nickt comply with 2015 IBC 1030. " I! Color: ■ I _- MEW 6- structural 16070 Thompson 2017-10-11.pdf(4) Page: DETAIL SHEET Reivse S531 to specifically File Name: 6-structural 16070 Thompson 2017-10-11.pdf Subject: PlanCheck itemize each item that needs Author: nickt special inspection and whether it Color: • should be inspected periodically • or continuousl . .Nagesemer— MI6= IBC 01 R IS D PE IA INSP C 10 TO AISC REQUIREMENTS. SKPE TO NAM FOLLOW IT R VISED DI-ECTION MEM Page: FOUNDATION PLAN File Name: 6-structural 16070 Thompson 2017-10-11.pdf Distance from finish floor to Subject: PlanCheck bottom of window opening may Author: nickt not exceed 44". S111 shows 43" C•I • from floor to concrete sill,which will not provide enough space for HI . CoM E 1`N•T C EA-. KPE 0-1 -1 F•UN*A O framing and window and still ®_-37— PLAN S111 AND DETAIL 7/S531 BOTH SHOW CONCRETE acheive 44". Detail 7/S531 WALL SILL AT ELEVATION 95'-1 3/4"AND CONCRETE SLAB ` shows a different floor elevation. ELEVATION 91'-10 3/4". THIS IS A 39"HEIGHT, LEAVING 5 Revise and coordinate. (2015 AVA LA:LE TO INI H. NI R VIS ON H R. IBC 1030.3) ➢OMPSON Page: FOUNDATION PLAN File Name: 6-structural 16070 Thompson 2017-10-11.pdf Structural drawings must be Subject: PlanCheck stamped and signed by the .a,� aA�.�o..• Author: nickt engineer. :�" Color: • „?, 6010 SEE ATTACHED,STAMPED E FOUNDATION PLAN sill RECEIVED 01/10/2018 ASPEN BUILDING DEPARTMENT Page: FOUNDATION PLAN Provide and detail connection of J,® File Name: 6-structural 16070 Thompson 2017-10-11.pdf _.e Subject: PlanCheck window well to foundation wall. tg LAuthor: nickt T � Color: • -WDETAIL 7/S531 HAS N T TO IN ICATE T EL ELL ••- PRODUCT TO BE A PRE-FABRICATED COMPONENT. CONNECTION TO FOUNDATION IS NOTED TO FOLLOW MANUFACTURERS RECOMMENDATIONS. IF NEEDED, SKPE WILL COORDINATE A RECOMMENDED FASTENING SY TE F LL WINGSUF<iMITTAL,OF CCCJCT PF CIF ICATI . window specs 2.pdf(1) J• ��� ��• Page: 1 The Sierra Pacific Window File Name: window specs 2.pdf schedule does not identify which Subject: PlanCheck Author: nickt window the window well one is. Color: • window specs CW-2436.pdf(1) Page: 1 File Name: window specs CW-2436.pdf The"Window Well Experts" INEEM Subject: PlanCheck window does not meet minimum Author: nickt egress window size Color: • requirements. (Minimum 24" wide, 20"high, 5.7sqft clear opening)(2015 IBC 1030). RECEIVED 01/10/2018 ASPEN BUILDING DEPARTMENT