HomeMy WebLinkAboutFile Documents.1112 Waters Ave.0089.2017 (39).ARBK 2. Approval of fabricator, Approval shall be based upon review of the fabricator's written
procedural and quality control manuals and periodic auditing of fabrication practices by
an approved special inspection agency.
3. Completion of fabrication. Upon completion of fabrication,the approved fabricator
shall submit certificate of compliance to the building official stating that the work was
performed in accordance with the approved construction documents.
G. Building department Responsibilities
1. Approve special-inspection program. The building department shall approve all
special inspectors and special-inspection requirements.
2. Enforce special inspection. Work requiring special inspection and the building
inspector shall monitor the performance of special inspectors, l-Bill-ter approval,in
addition to that of the special inspector,must be obtained prior to placement of concrete,
covering of structural steel,or other similar materials.
3. Review Inspection reports. The building official should review special-inspection
progress and final reports.
4. Perform final inspection. The building official should perform the final inspection and
approval for a project[113C Sec. 109.3.1]after the final special-inspection report has been
reviewed and approved.
Project Address: , 12--' A ' . Permit Number:
ACKNOWLEDGMENTS
I have read and agree to comply with the conditions of this agreement.
Special Inspection Agency: Signature: Printed Name: bate:
Owner: Signature: Printed Name Date
1111_vs-, zs11013 er , s _ q- Jr (lb-7
Engine-eu Architect: Signature: Printed Name: Datc:
Contractor: Signature: Printed Name: Date:
Approved Fabricator: Signature: Printed Name: Date:
•
Inspected Fabricator: Signature: Printed Name: Date:
(circle one) Signature: Printed Name: Date:
CITY OF ASPEN
•
PITKIN COUNTY:
•
Received
• 5/15/17
2. Approval of fabricator. Approval shall be based upon review of the fabricator's written
procedural and quality control manuals and periodic auditing of fabrication practices by
an approved special inspection agency.
3. Completion of fabrication. Upon completion of fabrication,the approved fabricator
shall submit certificate of compliance to the building official stating that the work was
performed in accordance with the approved construction documents.
G. Building Department Responsibilities
1. Approve special-inspection program. The building department shall approve all
special inspectors and special-inspection requirements.
2. Enforce special inspection. Work requiring special inspection and the building
inspector shall monitor the performance of special inspectors. His\Her approval, in
addition to that of the special inspector,must be obtained prior to placement of concrete,
covering of structural steel,or other similar materials.
3. Review inspection reports. The building official should review special-inspection
progress and final reports.
4. Perform final inspection. The building official should perform the final inspection and
approval for a project[IBC Sec. 109.3.1] after the final special-inspection report has been
reviewed and approved.
Project Address: Permit Number:
ACKNOWLEDGMENTS
I have read and agree to comply with the conditions of this agreement.
Special Inspection Agency: Signature: %—' Priped Name: Date:
Weri Shr ycool
Owner: Signature: ted Name Date
Engineer/Architect: Signature: Printed Name: Date:
Contractor: Signature: Printed Name: Date:
Approved Fabricator: Signature: Printed Name: Date:
Inspected Fabricator: Signature: Printed Name: Date:
(circle one) Signature: Printed Name: Date:
CITY OF ASPEN
PITKIN COUNTY:
3
Received
5/15/17