HomeMy WebLinkAboutFile Documents.75 Prospector Rd.0109.2017 (8).ACBK Accelerated
rat Tower
BLACK & VEATCH Ut Engineering
Date: December 16, 2016
Cole Mossman Shawn D. Cook, P.E.
Black&Veatch Accelerated Tower Engineering LLC
4600 S. Syracuse St, Suite 300 4710 Portofino Drive
Denver, CO 80237 Longmont, CO 80503
MossmanC@bv.com (479) 530-8627
shawn.cook@atowereng.com
Subject: Structural Opinion Letter
Carrier Designation: AT&T Mobility
Carrier Site Number: 113891
Carrier Site Name: RITZ-CARLTON CLUB (COL04136-2C)
AT&T Towers Designation: Site Number: 113891
Site Name: RITZ-CARLTON CLUB
Engineering Firm Designation: ATE Project Number: 019420160178
Site Data: 75 Prospector Road, Aspen, CO 81611, Pitkin County
Latitude 39°10'53.8", Longitude-106°51'25.1"
67 Foot Roof Top Site
Dear Cole Mossman,
Accelerated Tower Engineering, LLC is pleased to submit this "Structural Opinion Letter" for the structural
integrity of the existing building structure. The purpose of the opinion letter is to determine the adequacy of the
existing building structure with the addition of proposed equipment as specified in the construction drawings
Rev.A prepared by Black&Veatch, issued on 12/13/16 and RFDS loading form Rev.2.00, dated 08/31/16.
Proposed Equipment Removed Equipment
(2)Batteries(DC Power Plant) (3)Powerwave P65-16-XLH-RR
(1)BCEM Card(LTE Rack)
(3)Quintel QS46512-2
(3)Alcatel-Lucent B66A-RRH4x45
A loading comparison between the passing building structure analysis completed by M.D. Miller, Ltd, dated
04/04/11 and the proposed loading was completed to determine the effect on the structural integrity of the
existing building structure. This analysis was assumed to be complete and accurate for all relevant structural
members. Based upon this comparison; we have determined the existing building structure IS sufficient to
support the proposed condition.
We at the Accelerated Tower Engineer, LLC appreciate the opportunity of providing our continuing professional
services to you. If you have any questions or need further assistance on this or any other projects please give
us a call.
Respectfully submitted, �O , � C�c2s�1
i VO4 pANi •.•Fol,
O
Shawn D. Cook, P.E. % •= 47561 °i
Structural EngineerI� • i
CO PE#: 47561 � 04., 12/16/16.�\•���,; RECEIVED
t‘ , /ONA1- Nr
`WW.%.�. 11/7/17
ASPEN