Loading...
HomeMy WebLinkAboutFile Documents.75 Prospector Rd.0109.2017 (8).ACBK Accelerated rat Tower BLACK & VEATCH Ut Engineering Date: December 16, 2016 Cole Mossman Shawn D. Cook, P.E. Black&Veatch Accelerated Tower Engineering LLC 4600 S. Syracuse St, Suite 300 4710 Portofino Drive Denver, CO 80237 Longmont, CO 80503 MossmanC@bv.com (479) 530-8627 shawn.cook@atowereng.com Subject: Structural Opinion Letter Carrier Designation: AT&T Mobility Carrier Site Number: 113891 Carrier Site Name: RITZ-CARLTON CLUB (COL04136-2C) AT&T Towers Designation: Site Number: 113891 Site Name: RITZ-CARLTON CLUB Engineering Firm Designation: ATE Project Number: 019420160178 Site Data: 75 Prospector Road, Aspen, CO 81611, Pitkin County Latitude 39°10'53.8", Longitude-106°51'25.1" 67 Foot Roof Top Site Dear Cole Mossman, Accelerated Tower Engineering, LLC is pleased to submit this "Structural Opinion Letter" for the structural integrity of the existing building structure. The purpose of the opinion letter is to determine the adequacy of the existing building structure with the addition of proposed equipment as specified in the construction drawings Rev.A prepared by Black&Veatch, issued on 12/13/16 and RFDS loading form Rev.2.00, dated 08/31/16. Proposed Equipment Removed Equipment (2)Batteries(DC Power Plant) (3)Powerwave P65-16-XLH-RR (1)BCEM Card(LTE Rack) (3)Quintel QS46512-2 (3)Alcatel-Lucent B66A-RRH4x45 A loading comparison between the passing building structure analysis completed by M.D. Miller, Ltd, dated 04/04/11 and the proposed loading was completed to determine the effect on the structural integrity of the existing building structure. This analysis was assumed to be complete and accurate for all relevant structural members. Based upon this comparison; we have determined the existing building structure IS sufficient to support the proposed condition. We at the Accelerated Tower Engineer, LLC appreciate the opportunity of providing our continuing professional services to you. If you have any questions or need further assistance on this or any other projects please give us a call. Respectfully submitted, �O , � C�c2s�1 i VO4 pANi •.•Fol, O Shawn D. Cook, P.E. % •= 47561 °i Structural EngineerI� • i CO PE#: 47561 � 04., 12/16/16.�\•���,; RECEIVED t‘ , /ONA1- Nr `WW.%.�. 11/7/17 ASPEN BUILDING DEPARTMENT