Loading...
HomeMy WebLinkAboutFile Documents.506 W Hallam St.0019.2019 (7).ARBK MINOR DRAINAGE REPORT FOR 506 WEST HALLAM STREET CITY OF ASPEN, COLORADO PARCEL ID: 2735-124-25-007 PREPARED FOR: HS Building Group LLC 314 Suite B, Aspen Airport Business Center Aspen, Colorado 81611 PREPARED BY: High Country Engineering, Inc. 1517 Blake Avenue, Suite 101 Glenwood Springs, CO 81601 (970) 945-8676 November 2, 2018 HCE JOB NUMBER: 2181039.00 �P00 L/C„1,� �oo D, ,y 2 29975 RECEIVED 01/28/2019 ASPEN BUILDING DEPARTMENT I. EXISTING CONDITIONS A. Overall The site is located at 506 West Hallam in the City of Aspen, Colorado. The property has an existing residence, covered carports at the northern end of the site and a concrete walkway that runs south from the front of the residence to West Hallam Street. Landscaped areas include grass lawns and trees surrounded by mulch. Existing topography contain of approximately 1%-7% slopes. The gravel carport area of the site currently drains north away from the building as sheet flow and into the gravel alley. From there, drainage travels east down the alley and into the North 4th Street. Then the runoff travels north along the west side of North 4th Street until entering an inlet in the northwest corner of the intersection at West Francis Street and North Fourth Street. The NRCS soil map for Aspen located in the URMP lists the hydrologic soil group for the site as type B. II. PROPOSED CONDITIONS A. Overall The proposed project consists of replacing the current gravel around the garage with a heated concrete surface, and replacing the existing concrete walkway located at the south end of the site with heated concrete. Drainage improvements are proposed for identified areas. B. Basin Delineation The proposed project consists of two delineated basins for the purpose of calculating proposed detention for water quality. The basins are listed by the proposed construction in those areas, which include the driveway area, front walkway and R.O.W. walkway. The Driveway Area basin includes a concrete apron north of the garage and the concrete parking area west of the garage. Drainage in this basin sheet flows to the north into a proposed trench drain located just inside the north property line. The runoff is then discharged into the WQCV drywell located beneath the concrete parking area. The total impervious area has been calculated as 738.6 SF and 100% impervious, which requires 16.0 CF of WQCV and a drywell WQCV of 24.0 CF. The Front Walkway basin and R.O.W. Walkway basin are connected by a continuous walkway that runs from the front door of the residence to West Hallam Street. Drainage from the Front Walkway basin drains south as sheet flow to an existing low point, and the runoff is captured by two area inlets approximately 17 feet north of the south property line. The R.O.W. Walkway basin sheet flows north into the same previously inlets. Once the runoff is captured by the inlets, stormwater is conveyed into a perforated pipe that runs parallel to the sidewalk. The runoff is evenly distributed in the perforated pipe and flows through the perforations and 18 inches of gravel beneath the pipe. WQCV will be stored in the gravel voids as stormwater infiltrates the underlying soils. The total impervious area for both basins has been calculated as 383.1 SF and 100% impervious, which requires a total of 8.3 CF of WQCV and a drain tile WQCV of 16.6 CF. RECEIVED 01/28/2019 ASPEN BUILDING DEPARTMENT See Table 1 for WQCV calculations. III. DRAINAGE DESIGN A. Drainage Issues The drainage design follows the existing drainage patterns. The walkway areas currently drain to a low point within the sidewalk without a specific outlet. As for the northern area of the site, a portion of the gravel alley currently drains onto a small portion the site before continuing north and east down the alley. B. Drainage Alterations A small beveled edge will be installed at the north edge of the existing walkway to prevent the portion of alley drainage from entering the site to continue down the alley. A trench drain will be installed just south of the beveled edge that with capture all of the driveway area runoff that will be conveyed to the proposed drywell for water quality. Due to minimum size requirement in the URMP, the drywell has the capability to detain a WQCV more than required. If the drywell overflows, stormwater will backflow out of the trench drain and into the alley, thus beginning to follow the historic flow path into North 4th Street. The low point in the front walkway will be replaced by two area inlets that will capture stormwater to be conveyed into a perforated pipe and gravel detention beneath the walkway. Runoff will flow through the gravel voids and infiltrate the soils beneath. The gravel reservoir beneath the walkway has the capability to detain 53.2 CF of stormwater within 30% gravel voids. If the gravel detention overflows, stormwater will back up out of the area inlets and pond until sheet flowing east into the existing landscape, as it does historically. Table 1: WQCV Calculations IMPERVIOUS AREA PERCENT WQCV(Watershed _ BASIN AREA(S.F.) AREA(ACRE) (SF) IMPERVIOUS inches) WQCV(CF) Driveway Area 738.6 0.017 738.6 100.0 0.260 16.0 Front Walkway 284.7 0.007 284.7 100.0 0.260 6.2 R.O.W.Walkway 98.4 0.002 98.4 100.0 0.260 2.1 Driveway Drywell 24.0 Walkway Gravel 16.6 RECEIVED 01/28/2019 ASPEN BUILDING DEPARTMENT