HomeMy WebLinkAboutFile Documents.610 S West End St.0037.2019 (4).ARBK `
'
PERMIT NUMBER: ADDRBS �m � �r Z'0�
������������� ������U �������� ������������
COMMUNITY DEVELOPMENT ��,—n��xxoo�xn—;� "
������8���� ������Q�� U�����~U� ��U���UUC8����~U���� ����VU�"�' ~--~--
m���n�un��� COMPLIANCE VERIFICATION u��v� � ��n�»*~ n
_
`
4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/
�
elevator overruns, utility/mechanical apparatus, hot tubs and spay, and other height or setback exemption items �
unique to the project.
5-The report shall include a written description or drawing notes of the benchmarks or control points used to
' establish property boundaries, setbacks, building location, building height,and grades for each measurement. �
�
6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in �
the approved building permit set, �
/
7'The report must include the signature,date, and stamp of Colorado Professional Land Surveyor who
conducted the field measurements certifying that the field measurements areaccurately represented. �
�
Review and Acceptance of Report:The Zoning Officer shall review the report(s) and either confirm the project
conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets �
the zoning limitations forthepropertyorsha|| deternninevvhicha|ementyoftheArojectarenotincomp|iance.
�
The Zoning Officer may request additional information to verify zoning compliance, which may include but is not ,
limited to additional survey work oro site visit. �
�
All drawings of the survey report must correlate with representations in the approved building permit set for �
acceptance. Modifications to field conditions or amendments to the building permit may be required. /
/
Adetenninabon mf non-compliance shall result in the issuance ofa correction notice and possible work `
stoppage.Applicants are encouraged to verify zoning compliance as early as reasonably practical in the `
construction process to minimize disruption schedule.
�
. /
�
} /contractornanne\ ��� / � "�� ' unde��en� this policy. | agree pn�ectvviU �
� . .
comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets ofthe approved building permit plans. I underst'apqhat a �
i
cateofOccupancymiU not be issued until this �
project . . . �
Contractor Signature:
Date'
'
�
�
�
,
�
'
�
i
0~ ~
x