Loading...
HomeMy WebLinkAboutFile Documents.610 S West End St.0037.2019 (4).ARBK ` ' PERMIT NUMBER: ADDRBS �m � �r Z'0� ������������� ������U �������� ������������ COMMUNITY DEVELOPMENT ��,—n��xxoo�xn—;� " ������8���� ������Q�� U�����~U� ��U���UUC8����~U���� ����VU�"�' ~--~-- m���n�un��� COMPLIANCE VERIFICATION u��v� � ��n�»*~ n _ ` 4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/ � elevator overruns, utility/mechanical apparatus, hot tubs and spay, and other height or setback exemption items � unique to the project. 5-The report shall include a written description or drawing notes of the benchmarks or control points used to ' establish property boundaries, setbacks, building location, building height,and grades for each measurement. � � 6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in � the approved building permit set, � / 7'The report must include the signature,date, and stamp of Colorado Professional Land Surveyor who conducted the field measurements certifying that the field measurements areaccurately represented. � � Review and Acceptance of Report:The Zoning Officer shall review the report(s) and either confirm the project conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets � the zoning limitations forthepropertyorsha|| deternninevvhicha|ementyoftheArojectarenotincomp|iance. � The Zoning Officer may request additional information to verify zoning compliance, which may include but is not , limited to additional survey work oro site visit. � � All drawings of the survey report must correlate with representations in the approved building permit set for � acceptance. Modifications to field conditions or amendments to the building permit may be required. / / Adetenninabon mf non-compliance shall result in the issuance ofa correction notice and possible work ` stoppage.Applicants are encouraged to verify zoning compliance as early as reasonably practical in the ` construction process to minimize disruption schedule. � . / � } /contractornanne\ ��� / � "�� ' unde��en� this policy. | agree pn�ectvviU � � . . comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets ofthe approved building permit plans. I underst'apqhat a � i cateofOccupancymiU not be issued until this � project . . . � Contractor Signature: Date' ' � � � , � ' � i 0~ ~ x