HomeMy WebLinkAboutresolution.council.146-23RESOLUTION #146
(Series of 2023)
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ASPEN,
COLORADO, APPROVING A CONTRACT AMENDMENT BETWEEN THE
CITY OF ASPEN AND CUSHING TERRELL, AUTHORIZING THE CITY
MANAGER TO EXECUTE SAID CONTRACT AMENDMENT ON BEHALF
OF THE CITY OF ASPEN, COLORADO.
WHEREAS, there has been submitted to the City Council a contract
amendment between the City of Aspen and Cushing Terrell, a true and accurate
copy of which is attached hereto as "Exhibit A";
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF
THE CITY OF ASPEN, COLORADO,
That the City Council of the City of Aspen hereby approves the contract
amendment between the City of Aspen and Cushing Terrell, a copy of which is
annexed hereto and incorporated herein and does hereby authorize the City
Manager to execute said contract on behalf of the City of Aspen.
INTRODUCED, READ AND ADOPTED by the City Council of the City of
Aspen on the 1 oth day of October, 2023.
7ffw-�==
Torre, Mayor
I, Nicole Henning, duly appointed and acting City Clerk do certify that the
foregoing is a true and accurate copy of that resolution adopted by the City Council
of the City of Aspen, Colorado, at a meeting held October 10, 2023.
Nicole Henning, City Clerk
1
.; .1 4 #
r
DocuSign Envelope ID: F0593134D-55FE-4454-AEC8-3E21OC29798F 32 Contract Amendment
11-i.siAlADocumentG8o2®-2017
Amendment to the Professional Services Agreement
PROJECT: (name and address)
Aspen Luinberyard
As described in Exhibit B City of Aspen
Request for
Proposals 2021-150
OWNER: (name and address)
City of Aspen
130 South Galena Sheet
Aspen, CO 81611
AGREEMENT INFORMATION:
Date: July 27. 2021
ARCHITECT: (name and address)
Cusbine Terrell
303 E. 17th Ave. Ste 105
Denver CO 80203
AMENDMENT INFORMATION:
Amendment Nutnber: 07
Date: October 2.2023
The Owner and Architect amend the Agreement as follows:
Provide additional design services to include:
Entitlements: Development Agreement Support - see Exhibit 7A
Access and Infi-astructtue Design - see Exhibit 7B
Demolition and Recycling of Existing Site/Biuldings - See Exhibit 7C
Additional Part 4: Design Development - Program Management and Coordination - see Exhibit 7D
Pail 5: Planned Development Documentation - see Exhibit 7E
Additional Environmental Consulting - see Exhibit 7F
The Architect's compensation and schedule shall be adjusted as follows:
Compensation Adjustuent:
Add to Article 11.2:
Additional Service:
Entitlements: Development Agreement - reimbursable expenses and labor (hourly) not to exceed $35,000
Iufrastructi a Design - reatrbu sable expenses and labor (hourly) not to exceed $645,500
Demolition/Recycling - reimbursable expenses and labor (hourly) not to exceed $294,470
Additional Part 4 Design Development - labor (hourly) not to exceed $63,150
Part 5 Planned Development Doctmientation - reimbursable expenses and labor (hourly) not to exceed $250,825
Additional Enviromnental Consulting - reirnbtnsable expenses and labor (hourly) not to exceed $10.500
From previous Amendment 6, Reduce Additional Service Total all parts fi-ont $286.000 to $136,000 resulting in a credit of
$150.000
Net Total for all parts: $1,149,445
Schedule Adjustment:
To be coordinated between Owner and Architect based on overall project schedule
SIGNATURES:
Cusling Terrell City of Aspen, CO
ARCHITECT (Finn name) OWNER (Finn name)
-See attached signatures page- -See attached signatures page-
AtA t]ocurrrenl 13902 - 2017. Copyright rD2000, 2007 and 2017. All rights reserved. "The American fnsWe of ArrhilecLs; 'Arnerirarn lnstiule of Archilecis;
'A[A.'the Al Logo, and "A!A Conli act Documents' are trademarks of The American Instilute at Architects This document was produred at 1B-3D-22. ET on
10f0212023 under OMer No. 31D4239063 which expires on 0811412024, is not For resale, is licensed for anc4me use only, and may only he used In accordance
with the AtA Contract Documents° Terms of Service. To repml copyright violations, email docmfa@aiacontrack.corn
User Notes: (389ADA3C)
DocuSign Envelope ID: F0593B4D-55FE-4464-AEC8-3E210C29798F
CDocuSigned by:
ava a. 0'
SIGNATURE SIGNATURE
Laura Dougherty, Associate
Principal Sara Olt, City Manager
PRINTED NAME AND TITLE PRINTED NAME AND TITLE
10/11/2023 1 9:51:42 PM PDT
DATE DATE
AIA Document G802 — 2017_ Copyright @ 2000, 2007 and 2017- All rights reserved. "The American Institute of Architects ; "American Institute of Architects,"
"AIA," the AIA Logo, and `AIA ContractDocuments' are trademarks of The American Institute of Architects_ This document was produced at 18:30:22 ET on
10102rM3 under Order No.3104239063 which expires on 08/1412024, is not for resale, is licensed for one-time use only, and may only be used in accordance
with the AIA Contract Documents* Terms of Service_ To report copyright violations, e-mail docinfo@aiacontracts.cum.
User Notes: (3B9ADA3C)
DocuSign Envelope ID: F0593B4D-55FE-4464-AEC8-3E210C29798F
Signatures Page
09MP� sV— by L - oagreey
0N.
E•Lirud7p,�on� np'*t$. en,
Laura Dougherty gn" tom ,DC— �ry.oip.DC-n
G.-An MM9ID.0218:3212.%W
AIA Document G802— 2017_ Copyright® 2003, 2007 and 2017_ All rights reserved_ 'fhe American Institute of Architects," American Institute of Architects;
"ALA," the ALA Logo, and 'AIA Contract Documents' are trademarks of The American Institute of Architects_ This document was produced at 18-30.22 ET on
10/02P1023 under Order No.3104239063 which expires on 08/14/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance
with the AIA Contract Documents° Terms of Service_ To report copyright violations, e{nail docinfoQaiacontracts.com_
User Notes: (3B9ADA3C)
DocuSign Envelope ID: F0593B4D-55FE-4464-AEC8-3E210C29798F
Proposal for Aspen Lumberyard Additional Services:
Exhibit 7A
Entitlements: Development Agreement Support
SCOPE OF WORK
Cushing Terrell will continue to provide Entitlement Services in support of the Land Use Entitlements Review
Process. Six months.of support from the Land Planner, Project Manager and Director of Affordable housing
including review of and suggestions for language modification during the writing of the Development
Agreement is included. This scope. of work concludes with the approval of the Development Agreement.
SCOPE OF SERVICES
Cushing Terrell will continue to manage this project from our Denver office. Our professional team will
continue to be the following key team members:
Cushing Terrell
Project Manager: Laura Dougherty, AIA
Director of Affordable Housing: Randy Rhoads, AIA
Land Planner: Nicole Olmstead
COMPENSATION
Compensation for labor (hourly) and expenses shall not to exceed $35,000
cushingterrell.com
DocuSign Envelope ID: F0593B4D-55FE-4464-AEC8-3E210C29798F
2
Exhibit 7B
Access and Infrastructure Design
SCOPE OF WORK
Cushing Terrell and sub consultants will provide Architectural and Engineering Services for off -site work
including the signalized intersection, AABC Trail underpass, and closure of Sage Way, and on -site
infrastructure necessary to ready the site for development. This scope of work includes Project Management
of the design team, coordination with Owner's consultants, Civil Engineering, Traffic Engineering,
Architecture, Landscape Architecture, Electrical Engineering and Structural Engineering.
Off -site scope of work will include Schematic Design, Design Development and Construction Documents and
will include submitting for CDoT, Aspen and Pitkin County permits, and supporting the permitting and
preconstruction process through receipt of building permits (Parts 1, 3, 6, and 7). Up to three permit
resubmittals are anticipated with this fee. This scope of work concludes with the receipt of building permits.
The architectural scope includes design and renderings for the bridge and trail underpass inclusive of
strategies to mitigate impacts of snow plowing and may include snow fences and or coverings over the
underpass. Landscape scope includes associated required planting and irrigation at the closure of Sage Way
and new underpass along with Trail realignment design. Structural Engineering includes the retaining wall
design related to the AABC Trail underpass and an allowance related to snow mitigation strategies
(coverings/fences). Traffic Engineering will be provided for the new signalized intersection related to
detection loops, striping, signal wiring and coordination of the access permit. Electrical engineering shall be
provided serve the new signalized intersection. Civil Engineering scope will include utility relocations, utility
service plan, easement coordination, FIR and FOR reviews and coordination with CDoT.
On -site scope of work will include building on Design Development drawings to develop permitted
Construction Documents related to site preparation (Parts 6 and 7). Project Management, Civil Engineering
and Structural Engineering (limited to retaining wall design) will be provided. This scope includes submitting
for building permits and supporting the permitting and preconstruction process through receipt.of building
permits. Up to three permit resubmittals are anticipated with this fee. It is inclusive of the design and
documentation of underground utilities, roadway layout, rough grading, inclusive of retaining walls
anticipated at property lines. It is anticipated that this scope of work will be performed concurrently with the
Demolition and Recycling scope of work to conclude with permitted construction documents that will ready
the site for future building development.
Civil engineering to include right of way and roadway designs to comply with City of Aspen Engineering
Department requirements and utilities to comply with City of Aspen Water and Electric, Aspen Consolidated
Sanitation District and other service providers (telecommunications, data, etc.) as applicable.
cushingterrell.com
DocuSign Envelope ID: F0593B4D-55FE-4464-AEC8-3E210C29798F
3
Exhibit 7B - Continued
Access and Infrastructure Design
SCOPE OF SERVICES
Cushing Terrell will continue to manage this project from our Denver office. Our professional team will
continue to be the following key team members:
Cushing Terrell
Project Manager: Laura Dougherty, AIA
Director of Affordable Housing: Randy Rhoads, AIA
Project Architect: Charlie Deese, AIA
Project Electrical Engineer: Patrick Moranville, PE
Consultants
Civil Engineering: Roaring Fork Engineering, Richard Goulding, PE
Traffic Engineering: Fehr and Peers, Charles Alexander, PE
Landscape Architect: Connect One Design, Gyles Thornely
Structural Engineering: SA Miro, David Lewis, PE
Coordination with Owner's Consultants will be provided:
Subsurface Utility Engineering/Potholing: Horrocks Engineers
Geotechnical Engineering: Kumar and Associates
Environmental Compliance: ERO
Surveyor/Easements: True North
Program Manager: TBD
COMPENSATION
Compensation for labor (hourly) and expenses shall not exceed $645,500
cushingterrell.com
DocuSign Envelope ID: F0593B4D-55FE-4464-AEC8-3E21OC29798F
4
Exhibit 7C
Demolition and Recycling of Existing Site/Buildings
SCOPE OF WORK
Cushing Terrell and sub consultants will provide Architectural and Engineering Services for demolition of the
existing site features including pavements and onsite structures. This scope of work is envisioned to be
concurrent with the access and infrastructure scope of work to result in a single bid package for a single
constructor. This scope of work includes coordinating with Slosky and Company on the environmental scope
of work.
The design team will produce demolition documents that allow for multiple bid options from providing a
baseline recycling requirement to meet project requirements established by EGC Plus with increasing levels
of recycling and diversion opportunities. The design team will work with Owner's Construction Manager to
identify enhanced recycling/reuse streams. Project Management, Architecture, Landscape Architecture, Civil
Engineering, Electrical Engineering, Structural Engineering (limited to performative shoring design) and
Sustainable Design are included.
The scope of work will include inventory and documentation of existing conditions, access, stockpiling and
phasing plans, as part of the construction document set. Schematic Design, Design Development and
Construction Documents and will include submitting for permits and supporting the permitting and pre
construction process through receipt of building permits (Parts 1, 3, 6, and 7). The demolition and recycling
scope of work concludes with the receipt of building permits.
SCOPE OF SERVICES
Cushing Terrell will continue to manage this project from our Denver office. Our professional team will
continue to be the following key team members:
Cushing Terrell
Project Manager: Laura Dougherty, AIA
Director of Affordable Housing: Randy Rhoads, AIA
Project Architect: Paul Goss, AIA
Project Electrical Engineer: Patrick Moranville, PE
Consultants
Civil Engineering: Roaring Fork Engineering, Richard Goulding, PE
Landscape Architect: Connect One Design, Gyles Thornely
Structural Engineering: SA Miro, David Lewis, PE
Sustainable Design: Group 14 Engineering, Michael Levinson
Environmental: Slosky and Company, Inc, Leonard Slosky (compensation included under separate scope)
cushingterrell.com
DocuSign Envelope ID: F0593B4D-55FE-4464-AEC8-3E210C29798F
Exhibit 7C - Continued
Demolition and Recycling of Existing Site/Buildings
Owner's Consultants:
Program Manager: TBD
Cost Estimator: TBD
COMPENSATION
Compensation for labor (hourly) and expenses shall not to exceed $294,470
cushingterrell.com
DocuSign Envelope ID: F0593B4D-55FE-4464-AEC8-3E210C29798F
Exhibit 7D
Additional Part 4: Design Development - Program Management and
Coordination
SCOPE OF WORK
Cushing Terrell and sub consultants will provide additional program management and coordination through
the Design Development process. This scope of work includes coordinating with Owner's Program Manager
for project implementation as well as coordinating with Owner's Cost Estimator, providing project
information and documentation necessary to complete their scopes of work.
The scope of work includes providing consulting support to the Owner and to Owner's Program Manager for
the development of a request for proposals from Developers for the project.
SCOPE OF SERVICES
Cushing Terrell will continue to manage this project from our Denver office. Our professional team will
continue to be the following key team members:
Cushing Terrell
Project Manager: Laura Dougherty, AIA
Director of Affordable Housing: Randy Rhoads, AIA
Project Architect: Charlie Deese, AIA
Project Electrical Engineer: Patrick Moranville, PE
Project Mechanical Engineer: Shane Gerkin, PE
Consultants
Civil Engineering: Roaring Fork Engineering, Richard Goulding, PE
Landscape Architect: Connect One Design, Gyles Thornely
Structural Engineering: SA Miro, David Lewis, PE
Owner's Consultants:
Construction Manager: TBD
Cost Estimator: TBD
COMPENSATION
Compensation for labor (hourly) shall not exceed $63,150.
Reimbursable expenses are not anticipated.
cushingterrell.com
DocuSign Envelope ID: F0593B4D-55FE-4464-AEC8-3E210C29798F
7
Exhibit 7E
Part 5: Planned Development Documentation
SCOPE OF WORK
Cushing Terrell and sub consultants will continue to provide Architectural and Engineering Services related
to Planned Development Documentation. This scope of work is supportive of the Development Agreement
and Planned Development Documentation and provides an allowance for furnishing PD specific documents
illustrating/memorializing the regulatory conditions that the project will be required to satisfy. This includes
support for the total project scope including offsite improvements related to the signalized intersection, trail
improvements, CDoT ROW work and closure of Sage Way.
This scope of work includes modifying Planned Development Documentation to accommodate approved
Ordinance 10 items, specifically Section 13 (Trail Alignment and Related Landscaping and Sound Attenuation
Features), Section 15 (continued coordination efforts with MRA), and other Sections seeking recorded
flexibility.
This scope of work includes supporting the Development Agreement with technical consulting from team
members. Consulting may be related to technical development or regulatory language or design input.
SCOPE OF SERVICES
Cushing Terrell will continue to manage this project from our Denver office. Our professional team will
continue to be the following key team members:
Cushing Terrell
Project Manager: Laura Dougherty, AIA
Director of Affordable Housing: Randy Rhoads, AIA
Project Architect: Charlie Deese, AIA
Urban Planner/Entitlements: Nicole Olmstead
Project Electrical Engineer: Patrick Moranville, PE
Project Mechanical Engineer: Shane Gerkin, PE
Consultants
Civil Engineering: Roaring Fork Engineering, Richard Goulding, PE
Landscape Architect: Connect One Design, Gyles Thornely
Structural Engineering: SA Miro, David Lewis, PE
COMPENSATION
Compensation for labor (hourly) and expenses shall not exceed $250,825.
cushingterrell.com
DocuSign Envelope ID: F0593B4D-55FE-4464-AEC8-3E210C29798F
0
Exhibit 7F
Additional Environmental Consulting
SCOPE OF WORK
Cushing Terrell's sub consultant Slosky and Company, Inc. will provide recommendations for environmental
testing and assist in development of requests for testing proposals. The scope of work will include review of
testing reports and make recommendations to the design team for removal of materials included in the
demolition and recycling scope of work.
SCOPE OF SERVICES
Cushing Terrell will continue to manage this project from our Denver office. Our professional team will
continue to be the following key team members:
Cushing Terrell
Project Manager: Laura Dougherty, AIA
Director of Affordable Housing: Randy Rhoads, AIA
Consultants
Environmental: Slosky and Company, Inc, Leonard Slosky
COMPENSATION
Compensation for labor (hourly) and expenses shall not exceed $10,500
cushingterrell.com