HomeMy WebLinkAboutFile Documents.800 S Monarch St.0098.2018 (5).ARBK Mountain Queen Condominiums
800 S. Monarch
Aspen Colorado 81611
Unit #1
March 26, 2018
HOME OWNER'S ASSOCIATION
Proposed Renovations;
DOWNSTAIRS BEDROOM
1. REMOVE MURPHY BED UNIT.
2. REMOVE BI-FOLD DOORS AND REPLACE WITH
A 3'0"X 6'8"SOLID CORE DOOR TO MATCH EXISTING
3. DRYWALL PATCH & PAINT AS NEEDED.
4. REPLACE CARPET AS NEEDED.
MASTER BATH
1. REMOVE EXISTING BATH TUB & CHANGE TO A WALK A IN SHOWER.
3 SIDE WALLS,WHICH ARE CURRENTLY TILE ARE TO BE REPLACED WITH NEW TILE. NEW GLASS
SHOWER WALL AND DOOR TO BE TEMPERED GLASS PER CODE.TOILET PRIVACY WALL TO BE
REMOVED.
2. LOWER RAISED FLOOR IN CLOSET-BEHIND EXISTING MIRRORED DOORS. FLOOR IN CLOSET TO RE-
FRAMED TO BE LEVEL WITH THE EXISTING BATH FLOOR.THE EXISTING FLOOR IS CURRENTLY
RAISED TO ALLOW FOR HEIGHT IN THE PANTRY CLOSET BELOW. THIS MODIFICATION WILL LOWER
THE EXISTING PANTRY CEILING HEIGHT AND WILL CREATE INCREASED MASTER BATH SPACE.THE
EXISTING SLIDING MIRROR DOORS WILL BE REMOVED.
3. PLANS AND DETAILS WILL BE INCLUDED BY ATTACHMENT TO FOLLOW VIA EMAIL.
4. REPLACE EXISTING VANITY CABINET WITH A NEW PRE-FINISHED UNIT MARBLE COUNTER TOP &
SINK& FAUCET INCLUSIVE.
5. NEW TOILET, SHOWER VALVE & SHOWER HEAD
6. NEW FLOOR TILE TO REPLACE CARPET.
7. DRYWALL PATCH & PAINT AS NEEDED.
NOTE
ALL PROPOSED WORK WILL BE INTERIOR AND WILL NOT AFFECT ANY EXTERIOR OR COMMON AREAS.
ALL REQUIRED CITY OF ASPEN BUILDING PERMITS WILL BE SECURED BY BOB MCDONOUGH
CONSTRUCTION.
We are hopeful to begin work the first week of April.We have a short window to complete the project before
other commitments in the first week of June.
Resp y,
Sus n Friedkin
7destafit.
RECEIVED
4/11/2018
ASPEN
BUILDING DEPARTMENT