Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.239 Gilbert St.0112.2018 (5).ARBK
pub BUILT HENDRICKSON SHERLOCK 239 Gilbert Ave 1.0 General Total SQFT of Interior Demo is Three Hundred Twenty(320 SF) Nine Hundred(900) sqft of Drywall removed and reinstalled Total SQFT of Exterior Demo and Pourback is six hundred fifty(650 SF) Three Hundred Twenty(320 SF) on interior room to be mitigated. 2.0 Introduction • The existing driveway has a significant leak that has infiltrated the basement below. The concrete drive and neighboring slabs will need to be removed and the waterproofing repaired/replaced below. Concrete drive to be poured back and a new trench drain installed. Interior drywall to be removed. Interior space to be mold mitigated.New Drywall to be installed and Finished. 3.0 Project Documentation All parts of this project intend to act in accordance with City Code.All work hours will abide by those set forth by the City of Aspen. Project will take 5-7 days to demo and remove the scope of work detailed in the plans. Hours of Construction 7:30 am—5:30 pm M-F Contractor does not foresee the need for Saturday working hours or extended hours set forth by the Bridge Construction. Construction Schedule: Project to take approximately 3 weeks time. Jobsite Contact List Project Superintendent Shaun Kennedy—970-948-4424 shaun@hendricksoninc.com Project Manager Ben Fierstein—813-494-3959 ben@hsbuilt.com Questions should be distributed to: HSBuilt 314 AABC Suite B Aspen, CO 81611 Contact: Ben Fierstein 813-494-3959 RECEIVED 314 Suite B AABC,Aspen,Colorado,81611 0 4/2 0/2 018 Phone:970-923-1122 Web: www.hsbuilt.com ASPEN BUILDING DEPARTMENT pub BUILT HENDRICKSON SHERLOCK 4.0 BMP During the removal of concrete and waterproofing. Water will be onsite to provide fugitive dust control. All interior work will utilize hand tools and for this selective demolition. 5.0 Parking No parking is onsite,all contractor vehicles will utilize streetside parking and the Galena Street Parking Garage. 6.0 Waste Management All construction will be brought off site using a dump trailer. Concrete washout will be handled using disposable kitty pools and immediately brought offsite and disposed of at the Landfill. 7.0 Vicinity/Haul Map Limelight Ep ECOpPerAve 0 © h ? ;1 Wagner Park Ecoo Durant Ave Q H Ci apt rn ECli b rant4v, co E Dean Ct OUrant Ave In sr The St.Regis© E�ean St Aen Resort Aspen Condo G'tbe7 st /239 Gilbert Street Id 8 m drive-work vit y ti Jianhe st tiff rn RECEIVED 314 Suite B AABC,Aspen,Colorado,81611 0 4/2 0/2 018 Phone:970-923-1122 Web: www.hsbuilt.com ASPEN BUILDING DEPARTMENT