HomeMy WebLinkAboutFile Documents.239 Gilbert St.0112.2018 (6).ARBK TYPICAL SNOWMELT
DRIVEWAY CROSS SECTION
HS BUILDING GROUP
Pub
■n■
BUILT
HENDRICKSON
SHERLOCK
REINFORCEMENT
(REFER TO CIVIL DWGS.)
POURED IN PLACE CONCRETE
(W/INTEGRAL COLOR)
'v e o a,.
�__��� �__ iligarlikil
SNOWMELT TUBING
N ���_����_���__���_����_�� _���__���_����_�� ���_����_���_I�____________��__���_����_���__���_���IIIIIIII RIGID INSULATION BOARD(R-10MM)
IIII
LII I I I I I I r Waterproofing Membrane
Framing and Living Space below
Concrete Type 2 - Snowmelt
1°=„0" RECEIVED
4/09/2018
ASPEN
BUILDING DEPARTMENT
REVEIEWE iil
04/20/2018 iv
FORC GU L E
justinh ..