HomeMy WebLinkAboutFile Documents.934 S Mill St.0185.2018.ARBK DATE:7/11/18 MASTER PERMIT: PERMIT NUMBER:0185.2018.ARBK
•
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION THECITYOFASPEN
PROPERTY INFORMATION
,
ADDRESS 934 South Mill Street UNIT# PARCEL ID# 273718202205
TRACT p
LOT 5 BLOCK OR SUBDIVISION TO of Mill
OWNER NAME SMSA Capital LLC CELL EMAIL
BEST CONTACT Galambos Architects Inc.-Anna Reynoso CELL 9704291286 EMAIL areynoso@galambosarchitects.net
NAME
PROJECT DETAILS
,
WORKDESRKIIN DE IL to removed wall in the livingroom,kitchen,dining,and sports court.To refinish the upper level floors and stairs.To replace the kitchen countertopand backs lash.
IN DETAIL drywall 9, p Pp P backsplash.
restain all beams, trim,and wood ceilings
PROJECT Use of Building Class of Work Fixture Counts Equipment Checklist
VALUATION
❑ Commerical Toilets,Bidets
SO FT OF ❑ New Forced Air/Gravity Systems
WORKAREA 1195.6 sq.ft. 0 Multi-Family 0 Addition Bathtub Wall,Suspended,or Unit Heaters
0 Single Family 0 Alteration Lavatory(Wash Basin) —Gas Log
UNIT SQ FT 9655.3 sq.ft. 0 Mixed-Use Shower
0 Repair Kitchen Sink(+Disposal) —Gas Appliancew
LOT SIZE ❑ E IFFR Dishwasher Appliance Vents
(SQ FT) 10,806.23 sq.ft. ❑ Tenant Finish Laundry Bar,Utility Sink Heat,Refrig,Cooling,or
DISTURBED Will there be ❑ Demolition Clothes Washer Absorption Unit
EXTERIOR AREA 197 sq.ft. any roof wall ❑ Change Order Floor Sink Boilers(includes vent)
penetrations? ❑ Floor Drain Air Handling Unit
NEW SQ FT 0 ❑ Yes Water Heater(Pan Req) _Cooling Systems
Q #Gas Outlets Ventilation_ Fans
WITH UT UOTIOf WORK 0 ❑ No _Water Treatment Range Hood
Other #of Gas System Outlets
ZONE DISTRICT Aspen Mtn PUD Snowmelt System Sq Ft
J
N Project Valuation:Cost of project as defined in Valuation Affadavit. NOTICE: This permit becomes null and
Z Sq Ft of Work Area:Total square footage of area undergoing change or reconfiguration. void if work or construction authorized
Unit Sq Ft:Gross Square Footage,not FAR,of permitted unit. is not commenced within 180 days,or
~ Lot Size:Total surveyed square footage of property. if construction or work is suspended or
Y q g p p Y abandoned for a period of 180 days at
Z Disturbed Exterior Area:Square footage of lot affected by permit application. any time after work is commenced.
u_ New Sq Ft:Total added square footage for additions to net livable or net leasble space.
p Sq Ft of Rooms with Utility Work:Total square footage,not FAR,of all rooms with plumbing work. Re-
FOR CITY USE ONLY APPROVALS viewer
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Department Needse Sign- Approved
PC x JB 7/11/18
Plan Check Permit Fee 25 Parks Impact
Zoning
Engineering Zoning(50%) HPC
School Ded.
Building x JB 7/11/18
Zoning(50%) CMP(50%) 63.93 TDM Impact Fire
Engineering
Energy Code REMP Ped.Amenity CMP x PH 7/11/18
Water
CMP(50%) 63.93 Plan Check 325 Housing Cash in Lieu(Hourly) Stormwater
Zoning Sanitation
Parks Review (Hourly) Stormwater Env. Health
Utility Review Engineering City Use Tax Parks
(Hourly) Landscape
GIS County Use Tax Efficiency
Approved DAM 8/21/18
Lot Area Deed Restricted To Issue
Census Code # of Dwellings Plans Location Issuance
CITY OF ASPEN December2017 130 S. GALENA ST ASPEN, CO 81611